Opening the dossier…
Opening the dossier…
Contractor dossier
93 projects on file, including joint ventures this contractor is part of.
Total projects
93
Total budget
₱4.7B
Average progress
95.2%
Completion rate
84.9%
Average risk score
53.1
Medium risk on average, out of 100
Flagged as unusual
6
6.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 89 | ₱4.4B | 53.1 | 6 | 95.0% |
| Region VIII | 4 | ₱345.2M | 53.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 47 | ₱2.4B | 49.3 | 0 | 100.0% |
| Bridges | 21 | ₱786.7M | 47.5 | 0 | 95.9% |
| Flood Control and Drainage | 10 | ₱654.4M | 52.3 | 0 | 97.3% |
| OTHER | 6 | ₱278.6M | 66.3 | 1 | 97.3% |
| GAA 2025 OO-1 | 3 | ₱178.6M | 92.2 | 3 | 56.5% |
| Buildings and Facilities | 3 | ₱124.8M | 48.9 | 0 | 66.7% |
| GAA 2025 OO-2 | 2 | ₱240.7M | 93.4 | 1 | 76.0% |
| GAA 2025 SSP | 1 | ₱81.9M | 95.2 | 1 | 65.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HC0056CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF TALIBON-BIEN UNIDO BRIDGE, | Region VII | Bohol 2nd DEO | On-Going | ₱81.9M | 65% | High risk95 | Flagged0.025 |
| 25HA0004CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE STRUCTURE, PHASE 3 JCT. TAGBILARAN NORTH ROAD K0002 + 170 AND PEÑAFLOR STREET LEADING TO OUTFALL, BARANGAY COGON, BARANGAY BOOY, AND BARANGAY TALOTO, | Region VII | Bohol 1st DEO | On-Going | ₱96.1M | 94% | High risk93 | —-0.008 |
| 25HA0020CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE STRUCTURE, JCT. TAGBILARAN NORTH ROAD K0002 + 170 AND PEÑAFLOR STREET LEADING TO OUTFALL WITH INTEGRATED WASTE WATER TREATMENT, BARANGAY COGON, BARANG | Region VII | Bohol 1st DEO | On-Going | ₱144.6M | 58% | High risk93 | Flagged0.009 |
| 25HC0099ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD- K0106+177-K0107+766, K0116+370-K0116+1021, TALIBON, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱76M | 39% | High risk93 | Flagged0.018 |
| 25HC0083ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0109+815-K0110+813, TALIBON, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱31.6M | 85% | High risk92 | Flagged0.002 |
| 25HB0024ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - THE PRES. CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0158+573 - K0159+000, K0168+702 - K0169+048, K0245+900 - K0246+396 | Region VII | Bohol 3rd DEO | On-Going | ₱70.9M | 46% | High risk92 | Flagged0.018 |
| 24HC0041ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, HUNAN FLOOD CONTROL, BUENAVIS | Region VII | Bohol 2nd DEO | On-Going | ₱96.4M | 92% | High risk77 | Flagged0.017 |
| 25HC0078CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM- KATUPARAN)- ACCESS ROAD LEADING TO TALIBON PORT VIA SAN JOSE-BRGY. SAN FRANCISCO-REVILLES ST., BRG | Region VII | Bohol 2nd DEO | On-Going | ₱51.5M | 92% | High risk73 | —-0.001 |
| 25HA0025CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, HABITAT ROAD LEADING TO TAGBILARAN EAST ROAD (BELOW THE REGIONAL HUB), TAGBILARAN CITY, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱96.3M | 74% | High risk64 | —-0.024 |
| 21HB0188CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PRORAM -TRIP), CONCRETING OF CALUNASAN SUR TO UGPONG ROAD LEADING TO LOBOC RIVER CRUISE, LOBOC, BOHOL ST | Region VII | Bohol 3rd DEO | Completed | ₱47.1M | 100% | High risk64 | —-0.030 |
| 18HB0141CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS - JCT. (TER) LA UNION-MABINI-CABULAO-UBAY ROAD (LEADING TO BEACH AREAS AT ANDA & UBAY INCLUDING BRIDGE | Region VII | Bohol 3rd DEO | Completed | ₱29.8M | 100% | High risk62 | —-0.026 |
| 21HB0127LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS -LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONCRETING OF ROAD, CALUNASAN SUR (LOBOC) LEADING TO TAMBANGAN (LOAY), LOBOC - LOAY, BOHOL STA. 0+0 | Region VII | Bohol 3rd DEO | Completed | ₱44.2M | 100% | High risk62 | —-0.030 |
| 24HC0037ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, SAGBAYAN, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱96.4M | 99% | High risk62 | —-0.027 |
| 21H00012LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS , LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF ROAD, JCT. (LIR) SAN MIGUEL-BAYONGAN-BULILIS-MABUHAY, UBAY, BOHOL, STA.0+000-STA.7+1 | Region VII | Region VII | Completed | ₱231.6M | 100% | High risk62 | —-0.058 |
| 24HC0036CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF TALIBON-BIEN UNIDO BRIDGE, | Region VII | Bohol 2nd DEO | On-Going | ₱96.4M | 88% | High risk60 | —-0.004 |
| 23HB0114CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS WATER SUPPLY SYSTEM CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF MABINI, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱9.7M | 100% | High risk60 | —-0.030 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HC0056CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF TALIBON-BIEN UNIDO BRIDGE, | Region VII | Bohol 2nd DEO | On-Going | ₱81.9M | 65% | High risk95 | Flagged0.025 |
| 25HB0024ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - THE PRES. CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0158+573 - K0159+000, K0168+702 - K0169+048, K0245+900 - K0246+396 | Region VII | Bohol 3rd DEO | On-Going | ₱70.9M | 46% | High risk92 | Flagged0.018 |
| 25HC0099ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD- K0106+177-K0107+766, K0116+370-K0116+1021, TALIBON, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱76M | 39% | High risk93 | Flagged0.018 |
| 24HC0041ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, HUNAN FLOOD CONTROL, BUENAVIS | Region VII | Bohol 2nd DEO | On-Going | ₱96.4M | 92% | High risk77 | Flagged0.017 |
| 25HA0020CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE STRUCTURE, JCT. TAGBILARAN NORTH ROAD K0002 + 170 AND PEÑAFLOR STREET LEADING TO OUTFALL WITH INTEGRATED WASTE WATER TREATMENT, BARANGAY COGON, BARANG | Region VII | Bohol 1st DEO | On-Going | ₱144.6M | 58% | High risk93 | Flagged0.009 |
| 25HC0083ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0109+815-K0110+813, TALIBON, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱31.6M | 85% | High risk92 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 18HA0066CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-JCT. SIKATUNA-BALILIHAN ROAD-BADIANG- CAMBUAC NORTE LEADING TO CAWASAN FALLS AND LAHUG CAVE, SIKATUNA, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱13.8M | 100% | Medium risk45 | —-0.096 |
| 77 | 24HB0129CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROADS, BATUAN, BOHOL STA. 3+238.40 - STA. 4+318.40 | Region VII | Bohol 3rd DEO | Completed | ₱34.6M | 100% | Medium risk45 | —-0.095 |
| 78 | 19HC0128CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES- LAPACAN SUR (BUGTONG LUBI) INABANGA-MAGTANGTANG (DANAO) ROAD IN SUPPORT OF THE AGRIBUSINESS INDUSTRY, DANAO, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱32.5M | 100% | Medium risk45 | —-0.095 |
| 79 | 20HC0012OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM -NETWORK DEVELOPMENT PROGRAM- OFF-CARRIAGEWAY IMPROVEMENT- SECONDARY ROADS -LOAY INTERIOR RD - K0126+064 - K0127+491; K0128+392 -K0129+500; K0130+840 - K0131+101 AND K0137+350 - K0137+958, TRINIDAD AND | Region VII | Bohol 2nd DEO | Completed | ₱38.3M | 100% | Medium risk45 | —-0.092 |
| 80 | 20HB0033ASSET PRESERVATION -REHABILITATION /RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS (ASPHALT TO CONCRETE) LOAY INTERIOR ROAD KO185 + 164 - KO185 + 928; KO187 + 400 - KO188 + 659 | Region VII | Bohol 3rd DEO | Completed | ₱41M | 100% | Medium risk45 | —-0.093 |
| 81 | 17HA0077CONSTRUCTION/IMPROVEMENT OF C200 TYPES STEEL BRIDGE-NEW TAGBUANE BRIDGE ALONG TAGBILARAN EAST ROAD (TAGBILARAN-JAGNA), ALBURQUERQUE, BOHOL. PROJECT ID-P00118001VS | Region VII | Bohol 1st DEO | Completed | ₱8.6M | 100% | Medium risk44 | —-0.030 |
| 82 | 24HB0126CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROADS, SIERRA BULLONES, BOHOL PHASE 2 STA. 0+000.0 | Region VII | Bohol 3rd DEO | Completed | ₱39.6M | 100% | Medium risk44 | —-0.093 |
| 83 | 18HC0009ASSET PRESERVATION- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS AT TAGBILARAN NORTH ROAD, KO079+439 - KO079+781, KO095+603 - KO095+701, KO086+543 - KO086+681 & KO095+000 - KO095+164, BUENAVISTA & GETAFE, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱20.6M | 100% | Medium risk44 | —-0.096 |
| 84 | 18HC0006ASSET PRESERVATION-PREVENTIVE MAINTENANCE OF ROAD: CONCRETE REBLOCKING OF TAGBILARAN NORTH ROAD (TAGBILARAN-GETAFE SECTION), INABANGA, GETAFE & TRINIDAD, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱22.1M | 100% | Medium risk44 | —-0.096 |
| 85 | 18HC0023OFF-CARRIAGEWAY IMPROVEMENT AT TAGBILARAN NORTH ROAD(TAGBILARAN-GETAFE SECTION), KO059+000 - K0059+199, KO076+941 - KO077+382, KO077+382 - KO077+505, KO078+367 - KO078+470, KO078+813.50-KO079+439 & KO079+781-KO080+346, CLARIN, INABANGA & BUENAVISTA, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱20.5M | 100% | Medium risk44 | —-0.096 |
| 86 | 19HC0155CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS- ACCESS ROADS LEADING TO TALIBON PORT VIA SAN JOSE BRGY. SAN FRANCISCO-REVILLES ST., BRGY. POBLACION, TALIBON, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱27.9M | 100% | Medium risk44 | —-0.094 |
| 87 | 20HC0018CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORT- ACCESS ROAD LEADING TO TALIBON PORT VIA SAN JOSE-BRGY. SAN FRANCISCO- REVILLES ST.,BRGY. POBLACION , TALIBON, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱18.6M | 100% | Medium risk44 | —-0.095 |
| 88 | 19HC0001001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS- SECONDARY ROADS,TAGBILARAN NORTH ROAD (TAGBILARAN-JETAFE SECT.) CLARIN AND TALIBON, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱21.5M | 100% | Medium risk44 | —-0.096 |
| 89 | 20HC0027CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS- JCT. TER MABUHAY-GABI-BAYONGAN- CAMANAGA ROAD LEADING TO BAYONGAN DAM, UBAY, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱22M | 100% | Medium risk44 | —-0.095 |
| 90 | 19HC0021001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION- PREVENTIVE MAINTENANCE- SECONDARY ROAD AT TAGBILARAN NORTH RD. (TAGBILARAN-JETAFE SECT.) K0088+002-K0088+769, K0093+290-K0093+450, K0094+752-K0094+868, K0095+331-K0095+603, K0100+242- | Region VII | Bohol 2nd DEO | Completed | ₱11.3M | 100% | Medium risk43 | —-0.096 |
| 91 | 20HC0042CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/IMPROVEMENTOF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES- TALIBON CAUSEWAY BYPASS- FROM POBLACION-VIA BARANGAY SAN FRANCISCO- BARANGAY SAN JOSE ROAD CONNECTING TAGBILARAN NORTH ROAD | Region VII | Bohol 2nd DEO | Completed | ₱7.6M | 100% | Medium risk43 | —-0.095 |
| 92 | 23HC0038ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, | Region VII | Bohol 2nd DEO | Completed | ₱19.6M | 100% | Medium risk42 | —-0.060 |
| 93 | 20HA0022REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - ABATAN BR. (B00227BH) ALONG TAGBILARAN NORTH ROAD (TAGBILARAN - JETAFE SECT.) | Region VII | Bohol 1st DEO | Completed | ₱3.5M | 100% | Low risk23 | —-0.055 |