Contractor dossier
272 projects on file, including joint ventures this contractor is part of.
Total projects
272
Total budget
₱15.7B
Average progress
93.0%
Completion rate
75.0%
Average risk score
51.3
Medium risk on average, out of 100
Flagged as unusual
37
13.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 177 | ₱11.9B | 49.6 | 26 | 95.2% |
| Region VIII | 51 | ₱2.4B | 60.0 | 10 | 80.8% |
| Region VII | 24 | ₱493.5M | 43.8 | 0 | 99.6% |
| Region X | 14 | ₱726.4M | 54.3 | 1 | 94.2% |
| Region IX | 4 | ₱93.1M | 52.1 | 0 | 100.0% |
| Region V | 1 | ₱73.3M | 65.2 | 0 | 100.0% |
| Region III | 1 | ₱23.5M | 30.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 114 | ₱7B | 44.4 | 6 | 96.1% |
| Flood Control and Drainage | 52 | ₱3B | 46.1 | 1 | 97.4% |
| Bridges | 34 | ₱1.3B | 45.0 | 0 | 99.6% |
| Buildings and Facilities | 24 | ₱622.3M | 42.3 | 0 | 96.8% |
| OTHER | 15 | ₱1.1B | 79.9 | 9 | 80.2% |
| GAA 2025 OO-1 | 10 | ₱682.6M | 92.2 | 10 | 55.2% |
| GAA 2025 SSP | 8 | ₱614.3M | 95.5 | 8 | 69.3% |
| GAA 2025 OO-2 | 8 | ₱595M | 92.0 | 3 | 70.6% |
| Bridges, Roads | 7 | ₱729.4M | 46.6 | 0 | 98.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IA0023REHABILITATION OF ROAD, SITIO DAPDAP TO LARRAZABAL, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱57.9M | 99% | High risk96 | Flagged0.004 |
| 25NH0008CONST. OF BRIDGE, BARANGAY BOLHOON, SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 90% | High risk96 | Flagged0.022 |
| 25NI0019CONSTRUCTION OF BANK REVETMENT ALONG BAHI RIVER (BAHI BRIDGE SECTION), BAROBO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱143.2M | 89% | High risk96 | Flagged0.031 |
| 25NH0058CONSTRUCTION OF NURCIA SEAWALL, LANUZA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.5M | 92% | High risk96 | Flagged0.017 |
| 25NI0052CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, BARANGAY MAHAYAHAY, LINGIG, SURIGAO DEL SUR (PACKAGE B) | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 34% | High risk95 | Flagged0.041 |
| 25NI0036CONCRETING OF ROAD AT SITIO MAHABO TO BARANGAY PROPER, BARANGAY MAHAYAHAY, LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱49M | 28% | High risk95 | Flagged0.037 |
| 25NI0063CONSTRUCTION OF BYPASS ROAD, TAGONGON - SAN ROQUE BYPASS ROAD SECTION, TAGBINA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 57% | High risk95 | Flagged0.035 |
| 25IA0117NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD- K1084+018 -K1084+914, K1086+112 - K1086+940 | Region VIII | Biliran DEO | On-Going | ₱77.2M | 38% | High risk95 | Flagged0.009 |
| 25IA0016REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD., K1071+944 - K1071+992, K1072+186 - K1072+349, K1072+403-K1072+474, K1074+492 - K1074+991 | Region VIII | Biliran DEO | On-Going | ₱57.9M | 53% | High risk95 | Flagged0.007 |
| 25IA0069NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD, K1092+932 -K1094+700 | Region VIII | Biliran DEO | On-Going | ₱82M | 71% | High risk95 | Flagged0.004 |
| 25KK0032CONSTRUCTION OF ODIONGAN BRIDGE 2 (PHASE II), GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱29.3M | 66% | High risk95 | Flagged0.011 |
| 25NI0033ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD K1416 + 039 - K1417 + 372, K1417+795 - K1418 + 300 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 30% | High risk94 | Flagged0.031 |
| 25NB0060TALACOGON BYPASS ROAD, AGUSAN DEL SUR, TALACOGON, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱47.7M | 31% | High risk94 | Flagged0.018 |
| 25NI0016CONSTRUCTION OF FLOOD CONTROL STRUCTURE PROTECTING SABANG BRIDGE, LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 79% | High risk93 | Flagged0.008 |
| 25NI0015CONSTRUCTION OF BANK REVETMENT ALONG BISLIG RIVER (SAN JOSE BRIDGE SECTION), BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 59% | High risk93 | Flagged0.012 |
| 25IL0015FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF DAMAGED FLOOD CONTROL STRUCTURES ALONG BONBON RIVER (DIVISORIA SECTION) BONTOC, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱81M | 60% | High risk93 | —-0.002 |
| 25IL0018CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF DAMAGED FLOOD CONTROL STRUCTURES ALONG BONBON RIVER (BENITON SECTION), BONTOC, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱81.1M | 77% | High risk93 | —-0.007 |
| 25NI0046ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1419 + 042 - K1422 + 100 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 40% | High risk92 | Flagged0.030 |
| 25NI0011CONSTRUCTION OF BANK REVETMENT PROTECTING JAVIER BR., BARANGAY JAVIER, BAROBO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱95.5M | 100% | High risk92 | —-0.024 |
| 25IA0042CONSTRUCTION OF DOROTEO FLOOD CONTROL STRUCTURE ALONG BILIRA CIRCUMFERENTIAL ROAD, PHASE I, ALMERIA, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱49M | 48% | High risk92 | —-0.009 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24NI0098CONSTRUCTION OF RIVER BANK PROTECTION ALONG HINATUAN RIVER (MALIXI SECTION), TAGBINA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱96.5M | 97% | High risk88 | Flagged0.061 |
| 24IA0151CONCRETING OF FMR- BRGY. PINANGUMHAN, BILIRAN TO BRGY. HAGUIKHIKAN, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱29.8M | 27% | High risk90 | Flagged0.058 |
| 24NI0097CONSTRUCTION OF RIVER BANK PROTECTION ALONG SABANG RIVER, PACKAGE B, LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱48.2M | 92% | High risk82 | Flagged0.058 |
| 25NA0038CONCRETING OF BRGY. SAN ISIDRO-BARAAS FMR, SITIO BARAAS, BRGY. SAN ISIDRO, KITCHARAO, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | On-Going | ₱14.9M | 31% | High risk86 | Flagged0.055 |
| 25NI0052CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, BARANGAY MAHAYAHAY, LINGIG, SURIGAO DEL SUR (PACKAGE B) | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 34% | High risk95 | Flagged0.041 |
| 25NI0036CONCRETING OF ROAD AT SITIO MAHABO TO BARANGAY PROPER, BARANGAY MAHAYAHAY, LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱49M | 28% | High risk95 | Flagged0.037 |
| 25NI0063CONSTRUCTION OF BYPASS ROAD, TAGONGON - SAN ROQUE BYPASS ROAD SECTION, TAGBINA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 57% | High risk95 | Flagged0.035 |
| 25NI0047ROAD WIDENING - SECONDARY ROADS - SURIGAO - DAVAO COASTAL ROAD - K1471+566 - K1473+800 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 40% | High risk89 | Flagged0.032 |
| 25NI0019CONSTRUCTION OF BANK REVETMENT ALONG BAHI RIVER (BAHI BRIDGE SECTION), BAROBO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱143.2M | 89% | High risk96 | Flagged0.031 |
| 25NI0033ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD K1416 + 039 - K1417 + 372, K1417+795 - K1418 + 300 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 30% | High risk94 | Flagged0.031 |
| 25NI0046ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1419 + 042 - K1422 + 100 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 40% | High risk92 | Flagged0.030 |
| 24NI0059CONSTRUCTION OF BANK REVETMENT ALONG BISLIG RIVER (SAN JOSE BRIDGE SECTION), BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱96.5M | 92% | High risk78 | Flagged0.027 |
| 24NI0060CONSTRUCTION OF FLOOD CONTROL STRUCTURE PROTECTING PAGTILAAN STEEL BR., LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱96.5M | 96% | High risk77 | Flagged0.025 |
| 25NH0008CONST. OF BRIDGE, BARANGAY BOLHOON, SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 90% | High risk96 | Flagged0.022 |
| 24NB0092CONSTRUCTION OF TALACOGON BY-PASS ROAD, AGUSAN DEL SUR, TALACOGON, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱47.8M | 30% | High risk77 | Flagged0.022 |
| 25NB0060TALACOGON BYPASS ROAD, AGUSAN DEL SUR, TALACOGON, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱47.7M | 31% | High risk94 | Flagged0.018 |
| 25NI0012REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE -SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1498+714 - K1498+754 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱48.5M | 78% | High risk89 | Flagged0.018 |
| 25NI0006REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE -PRIMARY ROADS JCT LINGIG-TRENTO RD - K1476+844 - K1476+885 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱44M | 77% | High risk87 | Flagged0.018 |
| 24IA0119CONCRETING OF BRGY. VILLA VICENTA FMR, BRGY. VILLA VICENTA, CAIBIRAN, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱32.3M | 41% | Medium risk52 | Flagged0.017 |
| 25NH0058CONSTRUCTION OF NURCIA SEAWALL, LANUZA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.5M | 92% | High risk96 | Flagged0.017 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 251 | 22NH008822NH0088 CONSTRUCTION OF RIVER CONTROL STRUCTURE AT DANIOG RIVER, BARANGAY GAMUTON, LANUZA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱29.4M | 100% | Medium risk37 | —-0.062 |
| 252 | 18NH0069CONSTRUCTION OF TELAJE FLOOD CONTROL, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱31.8M | 100% | Medium risk37 | —-0.060 |
| 253 | 18NH0065CONSTRUCTION OF DIKE REVETMENT ALONG TANDAG RIVER BASIN PROTECTING THE TANDAG BRIDGE, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱27.9M | 100% | Medium risk37 | —-0.060 |
| 254 | 21N00159CONSTRUCTION OF REGIONAL EVACUATION CENTER, REMEDIOS T. ROMUALDEZ, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱34.7M | 100% | Medium risk37 | —-0.075 |
| 255 | 21N00158CONSTRUCTION OF REGIONAL EVACUATION CENTER, KITCHARAO, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱34.7M | 100% | Medium risk37 | —-0.070 |
| 256 | 20NH0043NRJ - CAGWAIT ROAD LEADING WHITE BEACH RESORT, CAGWAIT, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱26.2M | 100% | Medium risk37 | —-0.076 |
| 257 | 21NI0030ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1456 +400 - K1457+096 | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱28.2M | 100% | Medium risk37 | —-0.075 |
| 258 | 19NI0001CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-JCT. MAHOGANY ROAD LEADING TO TAGPOPORAN BLUE WATER RESORT, ROAD CONCRETING BRGY. TAGPOPORAN, LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱29.4M | 100% | Medium risk37 | —-0.074 |
| 259 | 18NI0019CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF BANK REVETMENT ALONG PAGTILAAN RIVER (PAGTILAAN SECTION), LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱45.9M | 100% | Medium risk36 | —-0.050 |
| 260 | 21NI0044ROAD WIDENING - PRIMARY ROADS - JCT. LINGIG - TRENTO RD - K1479 + 811 - K1480 + 311 | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱18.6M | 100% | Medium risk36 | —-0.075 |
| 261 | 19NI0009CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION ALONG BISLIG BAY, CUMAWAS, BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱44.1M | 100% | Medium risk36 | —-0.055 |
| 262 | 25NI0005JCT. MAHOGANY ROAD LEADING TO TAGPOPORAN BLUE WATER RESORT, BRGY. TAGPOPORAN, LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱6.8M | 100% | Medium risk36 | —-0.070 |
| 263 | 18NI0021CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF BANK REVETMENT ALONG BISLIG RIVER (BISLIG BRIDGE SECTION), SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱34.3M | 100% | Medium risk36 | —-0.048 |
| 264 | 21N00160CONSTRUCTION OF REGIONAL EVACUATION CENTER, SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱34.7M | 100% | Medium risk36 | —-0.068 |
| 265 | 20NH0057CONSTRUCTION OF MULTI-PURPOSE GYM, BARANGAY BONGTUD, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱16.2M | 100% | Medium risk35 | —-0.074 |
| 266 | 22ND0054CONCRETING OF NATIONAL ROAD JUNCTION PUROK 3 TO PUROK 4, BRGY. LEMON FMR, BRGY.LEMON, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Butuan City DEO | Completed | ₱11.9M | 100% | Medium risk33 | —-0.038 |
| 267 | 18CL0055CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL WORKS IN MALOMA DIKE (DOWNSTREAM), SAN FELIPE SIDE, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱23.5M | 100% | Medium risk31 | —-0.087 |
| 268 | 22HE0028ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE - REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES - PAKIGNE BR. (B00498CB) ALONG N BACALSO AVE (CEBU SOUTH RD), MINGLANILLA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱2.6M | 100% | Low risk24 | —-0.060 |
| 269 | 23IA0133CONSTRUCTION OF ONE (1) UNIT, ONE (1) STOREY ONE (1) CLASSROOM SCHOOL BUILDING, UNGALE II ELEMENTARY SCHOOL, BARANGAY UNGALE, KAWAYAN, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱3M | 100% | Low risk23 | —-0.012 |
| 270 | 22HE0045CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, TALISAY CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱3M | 100% | Low risk19 | —-0.095 |
| 271 | 21HE0154LOCAL PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY LAWAAN I, TALISA | Region VII | Cebu 1st DEO | Completed | ₱2.9M | 100% | Low risk19 | —-0.096 |
| 272 | 25NB0063NJR BAH-BAH-TALACOGON RD - K1303 + 190 - K1303 + 204, K1303 + 355 - K1303 + 382, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱1.1M | 100% | Low risk17 | —-0.078 |