Contractor dossier
272 projects on file, including joint ventures this contractor is part of.
Total projects
272
Total budget
₱15.7B
Average progress
93.0%
Completion rate
75.0%
Average risk score
51.3
Medium risk on average, out of 100
Flagged as unusual
37
13.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 177 | ₱11.9B | 49.6 | 26 | 95.2% |
| Region VIII | 51 | ₱2.4B | 60.0 | 10 | 80.8% |
| Region VII | 24 | ₱493.5M | 43.8 | 0 | 99.6% |
| Region X | 14 | ₱726.4M | 54.3 | 1 | 94.2% |
| Region IX | 4 | ₱93.1M | 52.1 | 0 | 100.0% |
| Region V | 1 | ₱73.3M | 65.2 | 0 | 100.0% |
| Region III | 1 | ₱23.5M | 30.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 114 | ₱7B | 44.4 | 6 | 96.1% |
| Flood Control and Drainage | 52 | ₱3B | 46.1 | 1 | 97.4% |
| Bridges | 34 | ₱1.3B | 45.0 | 0 | 99.6% |
| Buildings and Facilities | 24 | ₱622.3M | 42.3 | 0 | 96.8% |
| OTHER | 15 | ₱1.1B | 79.9 | 9 | 80.2% |
| GAA 2025 OO-1 | 10 | ₱682.6M | 92.2 | 10 | 55.2% |
| GAA 2025 SSP | 8 | ₱614.3M | 95.5 | 8 | 69.3% |
| GAA 2025 OO-2 | 8 | ₱595M | 92.0 | 3 | 70.6% |
| Bridges, Roads | 7 | ₱729.4M | 46.6 | 0 | 98.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IA0023REHABILITATION OF ROAD, SITIO DAPDAP TO LARRAZABAL, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱57.9M | 99% | High risk96 | Flagged0.004 |
| 25NH0008CONST. OF BRIDGE, BARANGAY BOLHOON, SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 90% | High risk96 | Flagged0.022 |
| 25NI0019CONSTRUCTION OF BANK REVETMENT ALONG BAHI RIVER (BAHI BRIDGE SECTION), BAROBO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱143.2M | 89% | High risk96 | Flagged0.031 |
| 25NH0058CONSTRUCTION OF NURCIA SEAWALL, LANUZA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.5M | 92% | High risk96 | Flagged0.017 |
| 25NI0052CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, BARANGAY MAHAYAHAY, LINGIG, SURIGAO DEL SUR (PACKAGE B) | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 34% | High risk95 | Flagged0.041 |
| 25NI0036CONCRETING OF ROAD AT SITIO MAHABO TO BARANGAY PROPER, BARANGAY MAHAYAHAY, LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱49M | 28% | High risk95 | Flagged0.037 |
| 25NI0063CONSTRUCTION OF BYPASS ROAD, TAGONGON - SAN ROQUE BYPASS ROAD SECTION, TAGBINA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 57% | High risk95 | Flagged0.035 |
| 25IA0117NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD- K1084+018 -K1084+914, K1086+112 - K1086+940 | Region VIII | Biliran DEO | On-Going | ₱77.2M | 38% | High risk95 | Flagged0.009 |
| 25IA0016REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD., K1071+944 - K1071+992, K1072+186 - K1072+349, K1072+403-K1072+474, K1074+492 - K1074+991 | Region VIII | Biliran DEO | On-Going | ₱57.9M | 53% | High risk95 | Flagged0.007 |
| 25IA0069NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD, K1092+932 -K1094+700 | Region VIII | Biliran DEO | On-Going | ₱82M | 71% | High risk95 | Flagged0.004 |
| 25KK0032CONSTRUCTION OF ODIONGAN BRIDGE 2 (PHASE II), GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱29.3M | 66% | High risk95 | Flagged0.011 |
| 25NI0033ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD K1416 + 039 - K1417 + 372, K1417+795 - K1418 + 300 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 30% | High risk94 | Flagged0.031 |
| 25NB0060TALACOGON BYPASS ROAD, AGUSAN DEL SUR, TALACOGON, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱47.7M | 31% | High risk94 | Flagged0.018 |
| 25NI0016CONSTRUCTION OF FLOOD CONTROL STRUCTURE PROTECTING SABANG BRIDGE, LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 79% | High risk93 | Flagged0.008 |
| 25NI0015CONSTRUCTION OF BANK REVETMENT ALONG BISLIG RIVER (SAN JOSE BRIDGE SECTION), BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 59% | High risk93 | Flagged0.012 |
| 25IL0015FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF DAMAGED FLOOD CONTROL STRUCTURES ALONG BONBON RIVER (DIVISORIA SECTION) BONTOC, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱81M | 60% | High risk93 | —-0.002 |
| 25IL0018CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF DAMAGED FLOOD CONTROL STRUCTURES ALONG BONBON RIVER (BENITON SECTION), BONTOC, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱81.1M | 77% | High risk93 | —-0.007 |
| 25NI0046ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1419 + 042 - K1422 + 100 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 40% | High risk92 | Flagged0.030 |
| 25NI0011CONSTRUCTION OF BANK REVETMENT PROTECTING JAVIER BR., BARANGAY JAVIER, BAROBO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱95.5M | 100% | High risk92 | —-0.024 |
| 25IA0042CONSTRUCTION OF DOROTEO FLOOD CONTROL STRUCTURE ALONG BILIRA CIRCUMFERENTIAL ROAD, PHASE I, ALMERIA, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱49M | 48% | High risk92 | —-0.009 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24NI0098CONSTRUCTION OF RIVER BANK PROTECTION ALONG HINATUAN RIVER (MALIXI SECTION), TAGBINA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱96.5M | 97% | High risk88 | Flagged0.061 |
| 24IA0151CONCRETING OF FMR- BRGY. PINANGUMHAN, BILIRAN TO BRGY. HAGUIKHIKAN, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱29.8M | 27% | High risk90 | Flagged0.058 |
| 24NI0097CONSTRUCTION OF RIVER BANK PROTECTION ALONG SABANG RIVER, PACKAGE B, LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱48.2M | 92% | High risk82 | Flagged0.058 |
| 25NA0038CONCRETING OF BRGY. SAN ISIDRO-BARAAS FMR, SITIO BARAAS, BRGY. SAN ISIDRO, KITCHARAO, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | On-Going | ₱14.9M | 31% | High risk86 | Flagged0.055 |
| 25NI0052CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, BARANGAY MAHAYAHAY, LINGIG, SURIGAO DEL SUR (PACKAGE B) | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 34% | High risk95 | Flagged0.041 |
| 25NI0036CONCRETING OF ROAD AT SITIO MAHABO TO BARANGAY PROPER, BARANGAY MAHAYAHAY, LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱49M | 28% | High risk95 | Flagged0.037 |
| 25NI0063CONSTRUCTION OF BYPASS ROAD, TAGONGON - SAN ROQUE BYPASS ROAD SECTION, TAGBINA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 57% | High risk95 | Flagged0.035 |
| 25NI0047ROAD WIDENING - SECONDARY ROADS - SURIGAO - DAVAO COASTAL ROAD - K1471+566 - K1473+800 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 40% | High risk89 | Flagged0.032 |
| 25NI0019CONSTRUCTION OF BANK REVETMENT ALONG BAHI RIVER (BAHI BRIDGE SECTION), BAROBO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱143.2M | 89% | High risk96 | Flagged0.031 |
| 25NI0033ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD K1416 + 039 - K1417 + 372, K1417+795 - K1418 + 300 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 30% | High risk94 | Flagged0.031 |
| 25NI0046ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1419 + 042 - K1422 + 100 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 40% | High risk92 | Flagged0.030 |
| 24NI0059CONSTRUCTION OF BANK REVETMENT ALONG BISLIG RIVER (SAN JOSE BRIDGE SECTION), BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱96.5M | 92% | High risk78 | Flagged0.027 |
| 24NI0060CONSTRUCTION OF FLOOD CONTROL STRUCTURE PROTECTING PAGTILAAN STEEL BR., LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱96.5M | 96% | High risk77 | Flagged0.025 |
| 25NH0008CONST. OF BRIDGE, BARANGAY BOLHOON, SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 90% | High risk96 | Flagged0.022 |
| 24NB0092CONSTRUCTION OF TALACOGON BY-PASS ROAD, AGUSAN DEL SUR, TALACOGON, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱47.8M | 30% | High risk77 | Flagged0.022 |
| 25NB0060TALACOGON BYPASS ROAD, AGUSAN DEL SUR, TALACOGON, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱47.7M | 31% | High risk94 | Flagged0.018 |
| 25NI0012REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE -SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1498+714 - K1498+754 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱48.5M | 78% | High risk89 | Flagged0.018 |
| 25NI0006REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE -PRIMARY ROADS JCT LINGIG-TRENTO RD - K1476+844 - K1476+885 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱44M | 77% | High risk87 | Flagged0.018 |
| 24IA0119CONCRETING OF BRGY. VILLA VICENTA FMR, BRGY. VILLA VICENTA, CAIBIRAN, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱32.3M | 41% | Medium risk52 | Flagged0.017 |
| 25NH0058CONSTRUCTION OF NURCIA SEAWALL, LANUZA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.5M | 92% | High risk96 | Flagged0.017 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 23NH0056CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAGO RIVER BASIN, BARANGAY PURISIMA, TAGO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱96.5M | 100% | Medium risk47 | —-0.050 |
| 127 | 21IA0091CONSTRUCTION OF DRAINAGE/SLOPE PROTECTION WORKS, SITIO OWAKON, BARANGAY VILLA CONSUELO, NAVAL, BILIRAN | Region VIII | Biliran DEO | Completed | ₱18.1M | 100% | Medium risk47 | —-0.070 |
| 128 | 23IA0140CONSTRUCTION OF ONE (1) UNIT ONE (1) STOREY TWO(2) CLASSROOM SCHOOL BUILDING, TUCDAO NATIONAL HIGH SCHOOL, BRGY. TUCDAO, KAWAYAN, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱4.9M | 100% | Medium risk47 | —-0.011 |
| 129 | 20N00044TAGONGON- STA. MARIA- STA. JUANA- MAPUTI- DREAMLAND- BINGCONGAN- SAN ROQUE, PACKAGE E, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱106.1M | 100% | Medium risk47 | —-0.048 |
| 130 | 24IA0091CONSTRUCTION OF MAINIT FLOOD CONTROL STRUCTURE, CAIBIRAN, BILIRAN | Region VIII | Biliran DEO | Completed | ₱19.6M | 100% | Medium risk47 | —-0.082 |
| 131 | 19HH0173OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AT BRGY. TISA, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱7.2M | 100% | Medium risk47 | —-0.077 |
| 132 | 18HH0006CONSTRUCTION / MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES AT BRGY. TISA, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱6.5M | 100% | Medium risk47 | —-0.078 |
| 133 | 19HH0174OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURES AT BRGY. LABANGON, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱6.4M | 100% | Medium risk47 | —-0.078 |
| 134 | 17NI0019REHAB./RECONS./UPGRADING OF DAMAGED PAVED NAT'L ROADS INCLUDING DRAINAGE BASED ON PAVEMNT MGMT SYSTEM/HIGHWAY DEV'T AND MGMT - 4 (HDM-4) SECONDARY ROADS,SURIGAO-DAVAO COASTAL RD - K1404+500 K1405+750,K1457+649 - K1457+825.71,K1487+515-K1488+500 | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱76.8M | 100% | Medium risk47 | —-0.030 |
| 135 | 19N00065CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TOURISM DESTINATION- NRJ- DUGMANON- ENCHANTED RIVER- BACULIN ROAD LEADING- TO ENCHANTED RIVER, TALISAY, HINATUAN, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱144.7M | 100% | Medium risk47 | —-0.059 |
| 136 | 21N00011NRJ- DUGMANON- ENCHANTED RIVER- BACULIN ROAD LEADING TO ENCHANTED RIVER, TALISAY HINATUAN, SURIGAO DEL SUR, PACKAGE I | Region XIII | Region XIII | Completed | ₱98.9M | 100% | Medium risk47 | —-0.026 |
| 137 | 23N00148CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ESTUARY OF HUBO RIVER, BARANGAY POBLACION, SAN AGUSTIN, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱106.1M | 100% | Medium risk46 | —-0.046 |
| 138 | 23N00153CONSTRUCTION OF BANK REVETMENT ALONG BISLIG RIVER (BURBOANAN SECTION), BISLIG CITY, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱111M | 100% | Medium risk46 | —-0.045 |
| 139 | 22NH0046CONSTRUCTION OF SHORELINE PROTECTION OF TEN COASTAL BARANGAYS, SAN AGUSTIN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱96.5M | 100% | Medium risk46 | —-0.046 |
| 140 | 24NI0057CONSTRUCTION OF BANK REVETMENT ALONG HINATUAN RIVER (STO. NIÑO SECTION), HINATUAN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱115.8M | 100% | Medium risk46 | —-0.045 |
| 141 | 17N00071CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS, TABON - LABISMA ROAD LEADING TO LAWIGAN PORT, BISLIG CITY, SURIGAO DEL SUR 2ND LD | Region XIII | Region XIII | Completed | ₱144.7M | 100% | Medium risk46 | —-0.024 |
| 142 | 17N00052CONSTRUCTION OF NRJ - SAN TEODORO - POLACION - NUEVA ERA ROAD, AGUSAN DEL SUR 2ND LD., AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱144.7M | 100% | Medium risk46 | —-0.029 |
| 143 | 18KL0022BRIDGE PROGRAM-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, TAGOLOAN BR. (B01116MN) ALONG BUTUAN | Region X | Misamis Oriental 2nd DEO | Completed | ₱22.6M | 100% | Medium risk46 | —-0.063 |
| 144 | 21N00013NRJ- DUGMANON- ENCHANTED RIVER- BACULIN ROAD LEADING TO ENCHANTED RIVER, TALISAY, HINATUAN, SURIGAO DEL SUR, PACKAGE II | Region XIII | Region XIII | Completed | ₱98.9M | 100% | Medium risk46 | —-0.048 |
| 145 | 17HH0117REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES, BULACAO BRIDGE 1 (B00400CB) ALONG N. BACALSO AVE. (CEBU SOUTH RD.), CEBU CITY | Region VII | Cebu City DEO | Completed | ₱9.9M | 100% | Medium risk46 | —-0.032 |
| 146 | 24NH0047CONSTRUCTION OF MARIHATAG SEAWALL, MARIHATAG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱101.3M | 100% | Medium risk46 | —-0.047 |
| 147 | 21HE0005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) (S00206CB) K0047+353 - K0048+000, SIBONGA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱7.1M | 100% | Medium risk46 | —-0.093 |
| 148 | 18N00006ROAD WIDENING, SURIGAO - DAVAO COASTAL ROAD (S00313MN), K1230+745 - K1232+680, K1232+705.80 - K1232+909, K1232+945.20 - K1234+844, CANTILAN, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱116.9M | 100% | Medium risk46 | —-0.068 |
| 149 | 22HH0020OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - J. LUNA AVE. - (S00024CB) CHAINAGE 000-CHAINAGE 645, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱13M | 100% | Medium risk46 | —-0.098 |
| 150 | 17NI0023REHB/RECONS OF NATL RD W SLIPS,SLOPE COLLPSE & LNDSLIDE 2NDRY,SURIGAO-DVO CSTAL RD-K1453+430-K1453+456.2,K1453+706.80 K1453+722.50, K1453+893K1453+930,K1465+384K1465+486,K1476+677.50 K1476+891,K1478+643-K1478+673.30,K1500+550-K1500+580,K1506+311-K1506+329 | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱42M | 100% | Medium risk46 | —-0.037 |