Contractor dossier
272 projects on file, including joint ventures this contractor is part of.
Total projects
272
Total budget
₱15.7B
Average progress
93.0%
Completion rate
75.0%
Average risk score
51.3
Medium risk on average, out of 100
Flagged as unusual
37
13.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 177 | ₱11.9B | 49.6 | 26 | 95.2% |
| Region VIII | 51 | ₱2.4B | 60.0 | 10 | 80.8% |
| Region VII | 24 | ₱493.5M | 43.8 | 0 | 99.6% |
| Region X | 14 | ₱726.4M | 54.3 | 1 | 94.2% |
| Region IX | 4 | ₱93.1M | 52.1 | 0 | 100.0% |
| Region V | 1 | ₱73.3M | 65.2 | 0 | 100.0% |
| Region III | 1 | ₱23.5M | 30.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 114 | ₱7B | 44.4 | 6 | 96.1% |
| Flood Control and Drainage | 52 | ₱3B | 46.1 | 1 | 97.4% |
| Bridges | 34 | ₱1.3B | 45.0 | 0 | 99.6% |
| Buildings and Facilities | 24 | ₱622.3M | 42.3 | 0 | 96.8% |
| OTHER | 15 | ₱1.1B | 79.9 | 9 | 80.2% |
| GAA 2025 OO-1 | 10 | ₱682.6M | 92.2 | 10 | 55.2% |
| GAA 2025 SSP | 8 | ₱614.3M | 95.5 | 8 | 69.3% |
| GAA 2025 OO-2 | 8 | ₱595M | 92.0 | 3 | 70.6% |
| Bridges, Roads | 7 | ₱729.4M | 46.6 | 0 | 98.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IA0023REHABILITATION OF ROAD, SITIO DAPDAP TO LARRAZABAL, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱57.9M | 99% | High risk96 | Flagged0.004 |
| 25NH0008CONST. OF BRIDGE, BARANGAY BOLHOON, SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 90% | High risk96 | Flagged0.022 |
| 25NI0019CONSTRUCTION OF BANK REVETMENT ALONG BAHI RIVER (BAHI BRIDGE SECTION), BAROBO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱143.2M | 89% | High risk96 | Flagged0.031 |
| 25NH0058CONSTRUCTION OF NURCIA SEAWALL, LANUZA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.5M | 92% | High risk96 | Flagged0.017 |
| 25NI0052CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, BARANGAY MAHAYAHAY, LINGIG, SURIGAO DEL SUR (PACKAGE B) | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 34% | High risk95 | Flagged0.041 |
| 25NI0036CONCRETING OF ROAD AT SITIO MAHABO TO BARANGAY PROPER, BARANGAY MAHAYAHAY, LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱49M | 28% | High risk95 | Flagged0.037 |
| 25NI0063CONSTRUCTION OF BYPASS ROAD, TAGONGON - SAN ROQUE BYPASS ROAD SECTION, TAGBINA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 57% | High risk95 | Flagged0.035 |
| 25IA0117NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD- K1084+018 -K1084+914, K1086+112 - K1086+940 | Region VIII | Biliran DEO | On-Going | ₱77.2M | 38% | High risk95 | Flagged0.009 |
| 25IA0016REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD., K1071+944 - K1071+992, K1072+186 - K1072+349, K1072+403-K1072+474, K1074+492 - K1074+991 | Region VIII | Biliran DEO | On-Going | ₱57.9M | 53% | High risk95 | Flagged0.007 |
| 25IA0069NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD, K1092+932 -K1094+700 | Region VIII | Biliran DEO | On-Going | ₱82M | 71% | High risk95 | Flagged0.004 |
| 25KK0032CONSTRUCTION OF ODIONGAN BRIDGE 2 (PHASE II), GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱29.3M | 66% | High risk95 | Flagged0.011 |
| 25NI0033ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD K1416 + 039 - K1417 + 372, K1417+795 - K1418 + 300 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 30% | High risk94 | Flagged0.031 |
| 25NB0060TALACOGON BYPASS ROAD, AGUSAN DEL SUR, TALACOGON, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱47.7M | 31% | High risk94 | Flagged0.018 |
| 25NI0016CONSTRUCTION OF FLOOD CONTROL STRUCTURE PROTECTING SABANG BRIDGE, LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 79% | High risk93 | Flagged0.008 |
| 25NI0015CONSTRUCTION OF BANK REVETMENT ALONG BISLIG RIVER (SAN JOSE BRIDGE SECTION), BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 59% | High risk93 | Flagged0.012 |
| 25IL0015FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF DAMAGED FLOOD CONTROL STRUCTURES ALONG BONBON RIVER (DIVISORIA SECTION) BONTOC, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱81M | 60% | High risk93 | —-0.002 |
| 25IL0018CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF DAMAGED FLOOD CONTROL STRUCTURES ALONG BONBON RIVER (BENITON SECTION), BONTOC, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱81.1M | 77% | High risk93 | —-0.007 |
| 25NI0046ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1419 + 042 - K1422 + 100 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 40% | High risk92 | Flagged0.030 |
| 25NI0011CONSTRUCTION OF BANK REVETMENT PROTECTING JAVIER BR., BARANGAY JAVIER, BAROBO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱95.5M | 100% | High risk92 | —-0.024 |
| 25IA0042CONSTRUCTION OF DOROTEO FLOOD CONTROL STRUCTURE ALONG BILIRA CIRCUMFERENTIAL ROAD, PHASE I, ALMERIA, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱49M | 48% | High risk92 | —-0.009 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24NI0098CONSTRUCTION OF RIVER BANK PROTECTION ALONG HINATUAN RIVER (MALIXI SECTION), TAGBINA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱96.5M | 97% | High risk88 | Flagged0.061 |
| 24IA0151CONCRETING OF FMR- BRGY. PINANGUMHAN, BILIRAN TO BRGY. HAGUIKHIKAN, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱29.8M | 27% | High risk90 | Flagged0.058 |
| 24NI0097CONSTRUCTION OF RIVER BANK PROTECTION ALONG SABANG RIVER, PACKAGE B, LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱48.2M | 92% | High risk82 | Flagged0.058 |
| 25NA0038CONCRETING OF BRGY. SAN ISIDRO-BARAAS FMR, SITIO BARAAS, BRGY. SAN ISIDRO, KITCHARAO, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | On-Going | ₱14.9M | 31% | High risk86 | Flagged0.055 |
| 25NI0052CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, BARANGAY MAHAYAHAY, LINGIG, SURIGAO DEL SUR (PACKAGE B) | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 34% | High risk95 | Flagged0.041 |
| 25NI0036CONCRETING OF ROAD AT SITIO MAHABO TO BARANGAY PROPER, BARANGAY MAHAYAHAY, LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱49M | 28% | High risk95 | Flagged0.037 |
| 25NI0063CONSTRUCTION OF BYPASS ROAD, TAGONGON - SAN ROQUE BYPASS ROAD SECTION, TAGBINA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 57% | High risk95 | Flagged0.035 |
| 25NI0047ROAD WIDENING - SECONDARY ROADS - SURIGAO - DAVAO COASTAL ROAD - K1471+566 - K1473+800 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 40% | High risk89 | Flagged0.032 |
| 25NI0019CONSTRUCTION OF BANK REVETMENT ALONG BAHI RIVER (BAHI BRIDGE SECTION), BAROBO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱143.2M | 89% | High risk96 | Flagged0.031 |
| 25NI0033ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD K1416 + 039 - K1417 + 372, K1417+795 - K1418 + 300 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 30% | High risk94 | Flagged0.031 |
| 25NI0046ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1419 + 042 - K1422 + 100 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 40% | High risk92 | Flagged0.030 |
| 24NI0059CONSTRUCTION OF BANK REVETMENT ALONG BISLIG RIVER (SAN JOSE BRIDGE SECTION), BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱96.5M | 92% | High risk78 | Flagged0.027 |
| 24NI0060CONSTRUCTION OF FLOOD CONTROL STRUCTURE PROTECTING PAGTILAAN STEEL BR., LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱96.5M | 96% | High risk77 | Flagged0.025 |
| 25NH0008CONST. OF BRIDGE, BARANGAY BOLHOON, SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 90% | High risk96 | Flagged0.022 |
| 24NB0092CONSTRUCTION OF TALACOGON BY-PASS ROAD, AGUSAN DEL SUR, TALACOGON, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱47.8M | 30% | High risk77 | Flagged0.022 |
| 25NB0060TALACOGON BYPASS ROAD, AGUSAN DEL SUR, TALACOGON, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱47.7M | 31% | High risk94 | Flagged0.018 |
| 25NI0012REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE -SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1498+714 - K1498+754 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱48.5M | 78% | High risk89 | Flagged0.018 |
| 25NI0006REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE -PRIMARY ROADS JCT LINGIG-TRENTO RD - K1476+844 - K1476+885 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱44M | 77% | High risk87 | Flagged0.018 |
| 24IA0119CONCRETING OF BRGY. VILLA VICENTA FMR, BRGY. VILLA VICENTA, CAIBIRAN, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱32.3M | 41% | Medium risk52 | Flagged0.017 |
| 25NH0058CONSTRUCTION OF NURCIA SEAWALL, LANUZA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.5M | 92% | High risk96 | Flagged0.017 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 17NI0021IMPROVEMENT/WIDENING OF NATIONAL ROADS - SECONDARY ROADS,SURIGAO - DAVAO COASTAL RD K1462+656 - K1463+149, K1463+462 K1463+663, K1463+798 - K1464+78 | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱42M | 100% | Medium risk46 | —-0.040 |
| 152 | 19KK0058WIDENING OF PERMANENT BRIDGE- BUKO BRIDGE (B01301MN) ALONG BCIR (PHASE II), KINOGUITAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱11.8M | 100% | Medium risk46 | —-0.061 |
| 153 | 20KK0039WIDENING OF PERMANENT BRIDGE - TAGBOCBOC BR. (B01296MN) ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD (PHASE II), TALISAYAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱11.3M | 100% | Medium risk45 | —-0.060 |
| 154 | 20KK0025WIDENING OF PERMANENT BRIDGE - MAANAS BR. (B01289MN) ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD (PHASE II), MEDINA, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱5.6M | 100% | Medium risk45 | —-0.059 |
| 155 | 21NH0103CONSTRUCTION OF BUNTALID BRIDGE, PHASE II, CANTILAN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱56.6M | 100% | Medium risk45 | —-0.040 |
| 156 | 18NH0024MONONG BR. (B00694MN) ALONG SURIGAO-DAVAO COASTAL ROAD, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱69.7M | 100% | Medium risk45 | —-0.029 |
| 157 | 25KN0054CONSTRUCTION OF ROAD IN BARANGAY MAILAG, VALENCIA CITY, BUKIDNON | Region X | Bukidnon 4th DEO | On-Going | ₱19.4M | 53% | Medium risk45 | —-0.045 |
| 158 | 21N00010CANTILAN- MADRID BYPASS ROAD (SDCR ALTERNATE ROUTE), SURIGAO DEL SUR, MADRID, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱101.3M | 100% | Medium risk45 | —-0.075 |
| 159 | 20N00052CANTILAN- MADRID BYPASS ROAD (SDCR ALTERNATE ROUTE), MADRID, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱101.3M | 100% | Medium risk45 | —-0.075 |
| 160 | 22NH0022CONSTRUCTION OF RCDG BRIDGE, LOWER BUSOG, BARANGAY BARAS, SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱57.9M | 100% | Medium risk45 | —-0.029 |
| 161 | 22NI0050ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1403 + 110 - K1405 + 736 | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱96.3M | 100% | Medium risk44 | —-0.067 |
| 162 | 17NC0041REHAB/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG BUTUAN CITY-TALACOGON-LORETO-VERUELA-STA. JOSEFA (S00440MN) K1354+(-020) - K1354+033, K1355+009-K1355+045, K1355+370 - K1355+423, K1355+1048-K1355+1098, LA PAZ, AGUSAN | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱20.9M | 100% | Medium risk44 | —-0.049 |
| 163 | 17NC0040REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROAD ALONG BUTUAN CITY-TALACOGON-LORETO-VERUELA-STA. JOSEFA ROAD (S00447MN) K1387+915 - K1387+976, LORETO, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱27.1M | 100% | Medium risk44 | —-0.045 |
| 164 | 20NH0053CONSTRUCTION OF PROPOSED CAMP OF PHILIPPINE ARMY, BRGY. DAYOAN, TAGO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱67.2M | 100% | Medium risk44 | —-0.063 |
| 165 | 18HE0137CONSTRUCTION OF FOUR-STOREY (8 CLASSROOMS) SCHOOL BUILDING (9.5M X 23.00M) BLDG. 1 TALISAY CITY NATIONAL HIGH SCHOOL, TALISAY CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱22.6M | 100% | Medium risk43 | —-0.049 |
| 166 | 20HE0123CONSTRUCTION OF FOUR (4) STOREY EIGHT (8) CLASSROOM SCHOOL BUILDING, MINGLANILLA CENTRAL ELEMENTARY SCHOOL, MINGLANILLA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱25.9M | 100% | Medium risk43 | —-0.049 |
| 167 | 22NF0099CONSTRUCTION OF ROAD, BRGY. STA. PAZ, SAN ISIDRO, SIARGAO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱76.4M | 100% | Medium risk43 | —-0.076 |
| 168 | 21N00065POBLACION TO MAGSAYSAY TO OSMEÑA TO VILLAVERDE TO SSF KAHAYAGAN IN SUPPORT TO AGRIBUSINESS INDUSTRY, SITIO MABUHAY, KAHAYAGAN, TAGBINA, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱102.4M | 100% | Medium risk43 | —-0.067 |
| 169 | 24NH0069CONSTRUCTION / COMPLETION OF BRIDGE AT SITIO BATAS, BARANGAY SAN ROQUE, SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱49M | 100% | Medium risk43 | —-0.042 |
| 170 | 22N00043POBLACION TO MAGSAYSAY TO OSMENA TO VILLAVERDE TO SSF KAHAYAGAN IN SUPPORT TO AGRIBUSINESS INDUSTRY, SITIO MABUHAY, KAHAYAGAN, TAGBINA, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱106.1M | 100% | Medium risk43 | —-0.066 |
| 171 | 23NI0048CONSTRUCTION (CONCRETING) OF DUGHAN -KAUSWAGAN-SAN ROQUE - GAMUT ROAD SECTION, BAROBO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱99M | 100% | Medium risk43 | —-0.068 |
| 172 | 20NH0035CONSTRUCTION OF DIKE REVETMENT ALONG TANDAG RIVER BASIN PROTECTING THE TANDAG BRIDGE, TANDAG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱82M | 100% | Medium risk43 | —-0.055 |
| 173 | 21NI0058ROAD WIDENING - PRIMARY ROADS - JCT LINGIG - TRENTO RD. - K1477 + 211 - K1479 + 811 | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱95.4M | 100% | Medium risk43 | —-0.066 |
| 174 | 21NI0068ROAD WIDENING - SECONDARY ROADS - NRJ BAROBO - AGUSAN DEL SUR BDRY. RD - K1403 + 181 - K1405+761 | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱91.7M | 100% | Medium risk43 | —-0.067 |
| 175 | 20NF0028REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIP, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS JCT. DEL CARMEN-STA. MONICA-SAN ISIDRO ROAD | Region XIII | Surigao del Norte 1st DEO | Completed | ₱56.2M | 100% | Medium risk43 | —-0.079 |