Contractor dossier
272 projects on file, including joint ventures this contractor is part of.
Total projects
272
Total budget
₱15.7B
Average progress
93.0%
Completion rate
75.0%
Average risk score
51.3
Medium risk on average, out of 100
Flagged as unusual
37
13.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 177 | ₱11.9B | 49.6 | 26 | 95.2% |
| Region VIII | 51 | ₱2.4B | 60.0 | 10 | 80.8% |
| Region VII | 24 | ₱493.5M | 43.8 | 0 | 99.6% |
| Region X | 14 | ₱726.4M | 54.3 | 1 | 94.2% |
| Region IX | 4 | ₱93.1M | 52.1 | 0 | 100.0% |
| Region V | 1 | ₱73.3M | 65.2 | 0 | 100.0% |
| Region III | 1 | ₱23.5M | 30.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 114 | ₱7B | 44.4 | 6 | 96.1% |
| Flood Control and Drainage | 52 | ₱3B | 46.1 | 1 | 97.4% |
| Bridges | 34 | ₱1.3B | 45.0 | 0 | 99.6% |
| Buildings and Facilities | 24 | ₱622.3M | 42.3 | 0 | 96.8% |
| OTHER | 15 | ₱1.1B | 79.9 | 9 | 80.2% |
| GAA 2025 OO-1 | 10 | ₱682.6M | 92.2 | 10 | 55.2% |
| GAA 2025 SSP | 8 | ₱614.3M | 95.5 | 8 | 69.3% |
| GAA 2025 OO-2 | 8 | ₱595M | 92.0 | 3 | 70.6% |
| Bridges, Roads | 7 | ₱729.4M | 46.6 | 0 | 98.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IA0023REHABILITATION OF ROAD, SITIO DAPDAP TO LARRAZABAL, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱57.9M | 99% | High risk96 | Flagged0.004 |
| 25NH0008CONST. OF BRIDGE, BARANGAY BOLHOON, SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 90% | High risk96 | Flagged0.022 |
| 25NI0019CONSTRUCTION OF BANK REVETMENT ALONG BAHI RIVER (BAHI BRIDGE SECTION), BAROBO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱143.2M | 89% | High risk96 | Flagged0.031 |
| 25NH0058CONSTRUCTION OF NURCIA SEAWALL, LANUZA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.5M | 92% | High risk96 | Flagged0.017 |
| 25NI0052CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, BARANGAY MAHAYAHAY, LINGIG, SURIGAO DEL SUR (PACKAGE B) | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 34% | High risk95 | Flagged0.041 |
| 25NI0036CONCRETING OF ROAD AT SITIO MAHABO TO BARANGAY PROPER, BARANGAY MAHAYAHAY, LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱49M | 28% | High risk95 | Flagged0.037 |
| 25NI0063CONSTRUCTION OF BYPASS ROAD, TAGONGON - SAN ROQUE BYPASS ROAD SECTION, TAGBINA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 57% | High risk95 | Flagged0.035 |
| 25IA0117NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD- K1084+018 -K1084+914, K1086+112 - K1086+940 | Region VIII | Biliran DEO | On-Going | ₱77.2M | 38% | High risk95 | Flagged0.009 |
| 25IA0016REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD., K1071+944 - K1071+992, K1072+186 - K1072+349, K1072+403-K1072+474, K1074+492 - K1074+991 | Region VIII | Biliran DEO | On-Going | ₱57.9M | 53% | High risk95 | Flagged0.007 |
| 25IA0069NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD, K1092+932 -K1094+700 | Region VIII | Biliran DEO | On-Going | ₱82M | 71% | High risk95 | Flagged0.004 |
| 25KK0032CONSTRUCTION OF ODIONGAN BRIDGE 2 (PHASE II), GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | On-Going | ₱29.3M | 66% | High risk95 | Flagged0.011 |
| 25NI0033ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD K1416 + 039 - K1417 + 372, K1417+795 - K1418 + 300 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 30% | High risk94 | Flagged0.031 |
| 25NB0060TALACOGON BYPASS ROAD, AGUSAN DEL SUR, TALACOGON, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱47.7M | 31% | High risk94 | Flagged0.018 |
| 25NI0016CONSTRUCTION OF FLOOD CONTROL STRUCTURE PROTECTING SABANG BRIDGE, LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 79% | High risk93 | Flagged0.008 |
| 25NI0015CONSTRUCTION OF BANK REVETMENT ALONG BISLIG RIVER (SAN JOSE BRIDGE SECTION), BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 59% | High risk93 | Flagged0.012 |
| 25IL0015FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF DAMAGED FLOOD CONTROL STRUCTURES ALONG BONBON RIVER (DIVISORIA SECTION) BONTOC, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱81M | 60% | High risk93 | —-0.002 |
| 25IL0018CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF DAMAGED FLOOD CONTROL STRUCTURES ALONG BONBON RIVER (BENITON SECTION), BONTOC, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱81.1M | 77% | High risk93 | —-0.007 |
| 25NI0046ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1419 + 042 - K1422 + 100 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 40% | High risk92 | Flagged0.030 |
| 25NI0011CONSTRUCTION OF BANK REVETMENT PROTECTING JAVIER BR., BARANGAY JAVIER, BAROBO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱95.5M | 100% | High risk92 | —-0.024 |
| 25IA0042CONSTRUCTION OF DOROTEO FLOOD CONTROL STRUCTURE ALONG BILIRA CIRCUMFERENTIAL ROAD, PHASE I, ALMERIA, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱49M | 48% | High risk92 | —-0.009 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24NI0098CONSTRUCTION OF RIVER BANK PROTECTION ALONG HINATUAN RIVER (MALIXI SECTION), TAGBINA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱96.5M | 97% | High risk88 | Flagged0.061 |
| 24IA0151CONCRETING OF FMR- BRGY. PINANGUMHAN, BILIRAN TO BRGY. HAGUIKHIKAN, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱29.8M | 27% | High risk90 | Flagged0.058 |
| 24NI0097CONSTRUCTION OF RIVER BANK PROTECTION ALONG SABANG RIVER, PACKAGE B, LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱48.2M | 92% | High risk82 | Flagged0.058 |
| 25NA0038CONCRETING OF BRGY. SAN ISIDRO-BARAAS FMR, SITIO BARAAS, BRGY. SAN ISIDRO, KITCHARAO, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | On-Going | ₱14.9M | 31% | High risk86 | Flagged0.055 |
| 25NI0052CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, BARANGAY MAHAYAHAY, LINGIG, SURIGAO DEL SUR (PACKAGE B) | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 34% | High risk95 | Flagged0.041 |
| 25NI0036CONCRETING OF ROAD AT SITIO MAHABO TO BARANGAY PROPER, BARANGAY MAHAYAHAY, LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱49M | 28% | High risk95 | Flagged0.037 |
| 25NI0063CONSTRUCTION OF BYPASS ROAD, TAGONGON - SAN ROQUE BYPASS ROAD SECTION, TAGBINA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 57% | High risk95 | Flagged0.035 |
| 25NI0047ROAD WIDENING - SECONDARY ROADS - SURIGAO - DAVAO COASTAL ROAD - K1471+566 - K1473+800 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 40% | High risk89 | Flagged0.032 |
| 25NI0019CONSTRUCTION OF BANK REVETMENT ALONG BAHI RIVER (BAHI BRIDGE SECTION), BAROBO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱143.2M | 89% | High risk96 | Flagged0.031 |
| 25NI0033ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD K1416 + 039 - K1417 + 372, K1417+795 - K1418 + 300 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 30% | High risk94 | Flagged0.031 |
| 25NI0046ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1419 + 042 - K1422 + 100 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱95.5M | 40% | High risk92 | Flagged0.030 |
| 24NI0059CONSTRUCTION OF BANK REVETMENT ALONG BISLIG RIVER (SAN JOSE BRIDGE SECTION), BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱96.5M | 92% | High risk78 | Flagged0.027 |
| 24NI0060CONSTRUCTION OF FLOOD CONTROL STRUCTURE PROTECTING PAGTILAAN STEEL BR., LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱96.5M | 96% | High risk77 | Flagged0.025 |
| 25NH0008CONST. OF BRIDGE, BARANGAY BOLHOON, SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 90% | High risk96 | Flagged0.022 |
| 24NB0092CONSTRUCTION OF TALACOGON BY-PASS ROAD, AGUSAN DEL SUR, TALACOGON, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱47.8M | 30% | High risk77 | Flagged0.022 |
| 25NB0060TALACOGON BYPASS ROAD, AGUSAN DEL SUR, TALACOGON, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱47.7M | 31% | High risk94 | Flagged0.018 |
| 25NI0012REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE -SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1498+714 - K1498+754 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱48.5M | 78% | High risk89 | Flagged0.018 |
| 25NI0006REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE -PRIMARY ROADS JCT LINGIG-TRENTO RD - K1476+844 - K1476+885 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱44M | 77% | High risk87 | Flagged0.018 |
| 24IA0119CONCRETING OF BRGY. VILLA VICENTA FMR, BRGY. VILLA VICENTA, CAIBIRAN, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱32.3M | 41% | Medium risk52 | Flagged0.017 |
| 25NH0058CONSTRUCTION OF NURCIA SEAWALL, LANUZA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.5M | 92% | High risk96 | Flagged0.017 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 18N00035ROAD WIDENING, SURIGAO - DAVAO COASTAL RD - K1454+445 - K1456+400, K1460+814 - K1462+656, BISLIG CITY, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱118.6M | 100% | Medium risk43 | —-0.059 |
| 177 | 17NH0101DRAINAGE IMPROVEMENT ALONG SDCR K1299+200 - K130+767, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱19M | 100% | Medium risk43 | Flagged0.007 |
| 178 | 18ND0082WIDENING OF SUATAN BRIDGE (B00892MN) ALONG BUTUAN CITY-MASAO PORT ROAD, BUTUAN CITY | Region XIII | Butuan City DEO | Completed | ₱19.6M | 100% | Medium risk42 | —-0.044 |
| 179 | 22NH0016CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAGO RIVER BASIN, BRGY. PURISIMA, STA. 0+000.00 - STA. 0+346.00, TAGO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱86.8M | 100% | Medium risk42 | —-0.053 |
| 180 | 22N00084CONSTRUCTION OF ROAD, JUNCTION BANATI-QUARRY 2-MALIPAYON, BARANGAY VILLAVERDE, TAGBINA, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱111M | 100% | Medium risk42 | —-0.066 |
| 181 | 24NI0042ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1422 + 100 - K1424 + 600 | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱96.5M | 100% | Medium risk42 | —-0.068 |
| 182 | 23NI0047ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1424+605 - K1427+205 | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱96.5M | 100% | Medium risk42 | —-0.068 |
| 183 | 23NI0044ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1448+755 - K1451+385 | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱96.5M | 100% | Medium risk42 | —-0.068 |
| 184 | 17NH0108ADDITIONAL PAVEMENT WIDTH & LINED CANAL ALONG SDCR, (UNIDOS-TUBO-TUBO SECTION), K1315+000 - K1337+000, UNIDOS-TUBO-TUBO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱20.9M | 100% | Medium risk42 | Flagged0.005 |
| 185 | 21NB0010CONSTRUCTION OF CONCRETE ROAD - TALACOGON BYPASS ROAD, PACKAGE I, TALACOGON, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱47.5M | 100% | Medium risk42 | —-0.074 |
| 186 | 18N00043CONSTRUCTION OF BYPASS/DIVERSION ROADS, MARIHATAG BYPASS ROAD (SDCR ALTERNATE ROUTE) INCL. ROW, SURIGAO DEL SUR, MARIHATAG, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱115.4M | 100% | Medium risk42 | —-0.067 |
| 187 | 20NI0032ROAD WIDENING - SECONDARY ROADS - NRJ BAROBO-AGUSAN DEL SUR BDRY RD - K1405+761 - K1407+343 | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱56.3M | 100% | Medium risk42 | —-0.075 |
| 188 | 19N00069CONSTRUCTION OF BY-PASS AND DIVERSION ROADS- MARIHATAG BY-PASS RD (SDCR ALTERNATE ROUTE), MARIHATAG, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱99.3M | 100% | Medium risk42 | —-0.069 |
| 189 | 23NI0053ROAD WIDENING -SECONDARY ROADS-SURIGAO-DAVAO COASTAL RD-K1445+427-K1447+697 | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱96.5M | 100% | Medium risk42 | —-0.063 |
| 190 | 21N00169NRJ-DUGMANON-ENCHANTED RIVER-BACULIN ROAD LEADING TO ENCHANTED RIVER, TALISAY, HINATUAN, SURIGAO DEL SUR, PACKAGE II | Region XIII | Region XIII | Completed | ₱98.4M | 100% | Medium risk42 | —-0.066 |
| 191 | 22N00116NRJ- DUGMANON- ENCHANTED RIVER- BACULIN ROAD LEADING TO ENCHANTED RIVER, HINATUAN, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱96.5M | 100% | Medium risk42 | —-0.068 |
| 192 | 23NI0049JCT. MAHOGANY ROAD LEADING TO TAGPOPORAN BLUE WATER RESORT, BRGY. TAGPOPORAN, LINGIG, SURIGAO DEL SUR, PACKAGE II | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱96.5M | 100% | Medium risk42 | —-0.063 |
| 193 | 24NF0010CONSTRUCTION OF ROAD BRGY. BAYBAY - BRGY. MATINAO ROAD LEADING TO ECO FARM BURGOS, SIARGAO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱48.2M | 100% | Medium risk42 | —-0.079 |
| 194 | 22NI0063ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1488 + 825 - K1489 + 455 | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱96.5M | 100% | Medium risk42 | —-0.064 |
| 195 | 22N00040TINAGO - PORT LAMON ROAD LEADING TO SARSOZA CAVE/TINAGO LAGOON, BRGY. PORT LAMON, HINATUAN, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱106.1M | 100% | Medium risk42 | —-0.057 |
| 196 | 22NB0003CONSTRUCTION OF CONCRETE ROAD - TALACOGON BY-PASS ROAD, AGUSAN DEL SUR, TALACOGON, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱49M | 100% | Medium risk42 | —-0.074 |
| 197 | 23NB0006CONSTRUCTION OF CONCRETE ROAD - TALACOGON BY-PASS ROAD, TALACOGON, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱49M | 100% | Medium risk42 | —-0.077 |
| 198 | 18NB0034WIDENING OF BRIDGE AWA BR.(B00909MN) ALONG DAANG MAHARLIKA (AGUSAN-DAVAO SECT), BRGY. AWA, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱39M | 100% | Medium risk42 | —-0.033 |
| 199 | 24NF0019CONSTRUCTION OF ROAD MAGPUPUNGKO ROAD ENTRANCE LEADING TO MAGPUPUNGKO TIDEFALLS AND ROCK FORMATION, PILAR, SIARGAO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱48.1M | 52% | Medium risk42 | —-0.034 |
| 200 | 25NI0037RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES MONKAG BR. (B00762MN) ALONG SURIGAO-DAVAO COASTAL RD. | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱14.6M | 97% | Medium risk42 | —-0.013 |