Contractor dossier
248 projects on file, including joint ventures this contractor is part of.
Total projects
248
Total budget
₱17B
Average progress
76.7%
Completion rate
62.9%
Below 70%
Average risk score
52.9
Medium risk on average, out of 100
Flagged as unusual
21
8.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 195 | ₱12.2B | 52.9 | 17 | 76.5% |
| Region III | 26 | ₱1.8B | 49.0 | 0 | 80.5% |
| Region IV-A | 15 | ₱1.3B | 54.9 | 2 | 74.6% |
| Region IV-B | 8 | ₱1.4B | 63.8 | 2 | 60.7% |
| Region VI | 3 | ₱144.7M | 49.6 | 0 | 100.0% |
| Negros Island Region | 1 | ₱51.1M | 49.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 94 | ₱4.6B | 43.3 | 6 | 84.3% |
| Flood Control and Drainage | 63 | ₱5.8B | 59.6 | 4 | 75.6% |
| Roads | 50 | ₱4B | 54.6 | 0 | 65.8% |
| Bridges | 23 | ₱1.2B | 49.2 | 0 | 80.0% |
| GAA 2025 SSP | 7 | ₱495.5M | 94.5 | 7 | 49.8% |
| OTHER | 6 | ₱460.1M | 64.6 | 1 | 100.0% |
| GAA 2025 OO-1 | 3 | ₱472.1M | 94.3 | 3 | 24.1% |
| GAA 2025 OO-2 | 1 | ₱16.3M | 80.6 | 0 | 81.4% |
| Water Provision and Storage | 1 | ₱4.5M | 25.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OF0163REHABILITATION OF ROAD ALONG BARANGAY LAGRO, PACKAGE 1A, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱94.5M | 47% | High risk95 | Flagged0.026 |
| 25OF0165REHABILITATION OF ROAD ALONG BARANGAY STA. MONICA, PACKAGE 1A, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱94.4M | 43% | High risk95 | Flagged0.026 |
| 25OF0162REHABILITATION OF ROAD ALONG BARANGAY BAGBAG, PACKAGE 1A, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱94.6M | 46% | High risk95 | Flagged0.026 |
| 25OF0136IMPROVEMENT OF ROADS AT BARANGAY LAGRO, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱97M | 51% | High risk95 | Flagged0.025 |
| 25OF0110REHABILITATION OF ROAD AT BARANGAY GREATER LAGRO, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱47.4M | 57% | High risk94 | Flagged0.015 |
| 25O00017RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - EDSA-KALAYAAN-FORT BONIFACIO FLYOVER (EB) BUENDIA TO FORT BONIFACIO (B02321LZ) ALONG EDSA-KALAYAAN-FORT BONIFACIO FLYOVER (EAST BOUND) | National Capital Region | National Capital Region | On-Going | ₱141.6M | 0% | High risk94 | Flagged0.023 |
| 25O00018RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - MAGALLANES FLYOVER (SB) CUBAO-PASAY (B03219LZ) ALONG EPIFANIO DELOS SANTOS AVE (EDSA) (PHASE II) | National Capital Region | National Capital Region | On-Going | ₱235.9M | 16% | High risk94 | Flagged0.032 |
| 25OF0109IMPROVEMENT OF ROAD AT BARANGAY STA. MONICA, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱48.1M | 61% | High risk94 | Flagged0.016 |
| 25OF0149PREVENTIVE MAINTENANCE - TERTIARY ROADS - REGALADO AVE (NORTH) - K0024 + (-758) - K0025 + 1012, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱94.6M | 56% | High risk94 | Flagged0.001 |
| 25OE0120CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 153, ZONE 14, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱19.4M | 44% | High risk93 | Flagged0.018 |
| 25OE0133REHABILITATION OF DRAINAGE ALONG P. SANCHEZ ST., MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱16.3M | 81% | High risk81 | —-0.019 |
| 25E00080CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG PANGALAAN RIVER, (LEFT SIDE), BRGY. SAMPAGUITA, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱276.2M | 25% | High risk78 | Flagged0.032 |
| 25E00087CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG PANGALAAN RIVER, BRGY. SAMPAGUITA, PHASE 2, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230M | 25% | High risk78 | Flagged0.029 |
| 24C00479SUSTAINABLE INFRAS. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS RDS. AND/OR BR. FR. THE NAT'L. RD./S LEADING TO MAJOR/ STRATEGIC PUBLIC BLDGS./ FACILITIES-CONSTRUCTION OF ROAD,SITIO CALUMPIT-SITIO CULAGO,BARANGAY KALAWAKAN,DONA REMEDIOS TRINIDAD,BULACAN | Region III | Region III | On-Going | ₱95.1M | 0% | High risk76 | —-0.006 |
| 24C00483SUSTAINABLE INFRAS. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS RDS. AND/OR BR. FR. THE NAT'L. RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BLDGS./FACILITIES-CONSTRUCTION OF ROAD,SITIO TUBIGAN-SITIO CULAGO,BARANGAY KALAWAKAN,DONA REMEDIOS TRINIDAD,BULACAN | Region III | Region III | On-Going | ₱95.1M | 0% | High risk76 | —-0.007 |
| 24C00482SUSTAINABLE INFRAS. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS RDS. AND/OR BR. FR. THE NAT'L RD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BLDGS./ FACILITIES-CONSTRUCTION OF ROAD,SITIO KALAYAKN-SITIO PURUMUGAN,BARANGAY KALAWAKAN,DONA REMEDIOS TRINIDAD,BULACAN | Region III | Region III | On-Going | ₱95.1M | 0% | High risk76 | —-0.007 |
| 24C00480SUSTAINABLE INFRAS. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS RDS. AND/OR BR. FR. THE NAT'L. RD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BLDGS./FACILITIES-CONSTRUCTION OF ROAD,SITIO CUCONG-SITIO TALAMSI II, BARANGAY KALAWAKAN,DONA REMEDIOS TRINIDAD,BULACAN | Region III | Region III | On-Going | ₱95.1M | 0% | High risk76 | —-0.007 |
| 24C00498BASIC INFRASTRUCTURE PROGRAM-BIP-ACESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD BARANGAY SUMANDIG-GABIHANAT BARANGAY SUMANDIG, SAN ILDEFONSO, BULACAN | Region III | Region III | On-Going | ₱97.5M | 82% | High risk76 | —-0.028 |
| 24OD0312CONSTRUCTION OF FLOOD CONTROL RIVER WALL (RIGHT BANK), BARANGAY MALINTA, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱142.2M | 100% | High risk72 | —-0.008 |
| 23CC0164SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES ALONG PLARIDEL BYPASS ROAD - K0035+(-602) - K0043+878, PLARIDEL AND BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk72 | —-0.028 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 21O00121CONSTRUCTION OF NEW COA BUILDING WITH BASEMENT, CENTRAL OFFICE COMPOUND, COMMONWEALTH AVENUE, QUEZON CITY | National Capital Region | National Capital Region | On-Going | ₱959.9M | 42% | High risk63 | Flagged0.051 |
| 25E00080CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG PANGALAAN RIVER, (LEFT SIDE), BRGY. SAMPAGUITA, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱276.2M | 25% | High risk78 | Flagged0.032 |
| 25O00018RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - MAGALLANES FLYOVER (SB) CUBAO-PASAY (B03219LZ) ALONG EPIFANIO DELOS SANTOS AVE (EDSA) (PHASE II) | National Capital Region | National Capital Region | On-Going | ₱235.9M | 16% | High risk94 | Flagged0.032 |
| 24OH0158REHABILITATION OF RIZAL MEMORIAL SPORTS COMPLEX | National Capital Region | South Manila DEO | On-Going | ₱194.7M | 40% | High risk64 | Flagged0.030 |
| 24OF0304CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY GULOD, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱47.7M | 0% | Medium risk57 | Flagged0.030 |
| 25E00087CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG PANGALAAN RIVER, BRGY. SAMPAGUITA, PHASE 2, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230M | 25% | High risk78 | Flagged0.029 |
| 25OF0163REHABILITATION OF ROAD ALONG BARANGAY LAGRO, PACKAGE 1A, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱94.5M | 47% | High risk95 | Flagged0.026 |
| 25OF0162REHABILITATION OF ROAD ALONG BARANGAY BAGBAG, PACKAGE 1A, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱94.6M | 46% | High risk95 | Flagged0.026 |
| 25OF0165REHABILITATION OF ROAD ALONG BARANGAY STA. MONICA, PACKAGE 1A, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱94.4M | 43% | High risk95 | Flagged0.026 |
| 25OF0136IMPROVEMENT OF ROADS AT BARANGAY LAGRO, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱97M | 51% | High risk95 | Flagged0.025 |
| 24OD0304CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BAGUMBONG DULO TO PALMERA CREEK, BARANGAY 171, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱94.8M | 100% | High risk67 | Flagged0.023 |
| 25O00017RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - EDSA-KALAYAAN-FORT BONIFACIO FLYOVER (EB) BUENDIA TO FORT BONIFACIO (B02321LZ) ALONG EDSA-KALAYAAN-FORT BONIFACIO FLYOVER (EAST BOUND) | National Capital Region | National Capital Region | On-Going | ₱141.6M | 0% | High risk94 | Flagged0.023 |
| 25OE0120CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 153, ZONE 14, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱19.4M | 44% | High risk93 | Flagged0.018 |
| 25OF0109IMPROVEMENT OF ROAD AT BARANGAY STA. MONICA, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱48.1M | 61% | High risk94 | Flagged0.016 |
| 25OF0110REHABILITATION OF ROAD AT BARANGAY GREATER LAGRO, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱47.4M | 57% | High risk94 | Flagged0.015 |
| 24D00241CONSTRUCTION OF MULTI-PURPOSE BUILDING (DORMITORY) - BATANGAS STATE UNIVERSITY | Region IV-A | Region IV-A | On-Going | ₱38.8M | 30% | Medium risk48 | Flagged0.012 |
| 23OF0200REHABILITATION OF FLOOD CONTROL STRUCTURE, BRGY. PASONG PUTIK, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱38.2M | 100% | Medium risk52 | Flagged0.012 |
| 24O00053CONSTRUCTION OF DPWH NCR REGIONAL OFFICE BUILDING, PHASE III, JW DIOKNO BLVD., PASAY CITY | National Capital Region | National Capital Region | On-Going | ₱423.9M | 10% | High risk65 | Flagged0.008 |
| 25OF0149PREVENTIVE MAINTENANCE - TERTIARY ROADS - REGALADO AVE (NORTH) - K0024 + (-758) - K0025 + 1012, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱94.6M | 56% | High risk94 | Flagged0.001 |
| 24D00243CONSTRUCTION OF THREE (3) STOREY LEARNING CENTER BUILDING, BATSTATEU SAN JUAN - BATANGAS STATE UNIVERSITY | Region IV-A | Region IV-A | On-Going | ₱19.4M | 62% | Medium risk44 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 226 | 20OE0113REHABILITATION OF SCHOOL BUILDING AT JUAN LUNA ELEMENTARY SCHOOL, BARANGAY 396, MANILA | National Capital Region | North Manila DEO | Completed | ₱2M | 100% | Low risk23 | —-0.100 |
| 227 | 20OE0147REHABILITATION OF SCHOOL BUILDING AT TRINIDAD TECSON ELEMENTARY SCHOOL, BARANGAY 412, MANILA | National Capital Region | North Manila DEO | Completed | ₱2M | 100% | Low risk23 | —-0.103 |
| 228 | 20OE0133REHABILITATION OF SCHOOL BUILDING AT CLARO M. RECTO HIGH SCHOOL, BARANGAY 412, MANILA | National Capital Region | North Manila DEO | Completed | ₱2M | 100% | Low risk23 | —-0.098 |
| 229 | 19OE0074LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES: SCHOOL BUILDINGS - CONSTRUCTION / IMPROVEMENT OF SCHOOL BUILDING, MOISES SALVADOR ELEMENTARY SCHOOL, BARANGAY 412, MANILA | National Capital Region | North Manila DEO | Completed | ₱1.9M | 100% | Low risk23 | —-0.102 |
| 230 | 20OE0130REHABILITATION OF SCHOOL BUILDING AT LEGARDA ELEMENTARY SCHOOL, BARANGAY 521, MANILA | National Capital Region | North Manila DEO | Completed | ₱2M | 100% | Low risk23 | —-0.101 |
| 231 | 19OE0070LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - SCHOOL BUILDINGS- CONSTRUCTION / IMPROVEMENT OF SCHOOL BUILDING, PEDRO PELAEZ ELEMENTARY SCHOOL, BARANGAY 570, MANILA | National Capital Region | North Manila DEO | Completed | ₱1.9M | 100% | Low risk23 | —-0.104 |
| 232 | 20OE0131REHABILITATION OF SCHOOL BUILDING AT DR. BENIGNO ALDANA ELEMENTARY SCHOOL, BARANGAY 422, MANILA | National Capital Region | North Manila DEO | Completed | ₱2M | 100% | Low risk23 | —-0.103 |
| 233 | 19OE0069LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM -BUILDINGS AND OTHER STRUCTURES - SCHOOL BUILDINGS- CONSTRUCTION / IMPROVEMENT OF SCHOOL BUILDING, P. BURGOS ELEMENTARY SCHOOL, BARANGAY 581, MANILA | National Capital Region | North Manila DEO | Completed | ₱1.9M | 100% | Low risk23 | —-0.102 |
| 234 | 20OE0109REHABILITATION OF SCHOOL BUILDING AT PEDRO PELAEZ ELEMENTARY SCHOOL, BARANGAY 570, MANILA | National Capital Region | North Manila DEO | Completed | ₱2M | 100% | Low risk23 | —-0.103 |
| 235 | 20OE0115REHABILITATION OF SCHOOL BUILDING AT MOISES SALVADOR ELEMENTARY SCHOOL, BARANGAY 412, MANILA | National Capital Region | North Manila DEO | Completed | ₱2M | 100% | Low risk23 | —-0.101 |
| 236 | 19OE0087LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDING AND OTHER STRUCTURES - SCHOOLBUILDINGS - CONSTRUCTION / IMPROVEMENT OF SCHOOL BUILDING, DR. BENIGNO ALDANA ELEMENTARY SCHOOL, BARANGAY 422, MANILA | National Capital Region | North Manila DEO | Completed | ₱1.9M | 100% | Low risk23 | —-0.102 |
| 237 | 19OE0080LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - SCHOOL BUILDINGS- CONSTRUCTION / IMPROVEMENT OF SCHOOL BUILDING, ANTONIO MACEDA ELEMENTARY SCHOOL, BARANGAY581, MANILA | National Capital Region | North Manila DEO | Completed | ₱1.9M | 100% | Low risk23 | —-0.102 |
| 238 | 20OE0110REHABILITATION OF SCHOOL BUILDING AT ANTONIO MACEDA HIGH SCHOOL, BARANGAY 581, MANILA | National Capital Region | North Manila DEO | Completed | ₱2M | 100% | Low risk23 | —-0.103 |
| 239 | 20OE0111REHABILITATION OF SCHOOL BUILDING AT ANTONIO MACEDA ELEMENTARY SCHOOL, BARANGAY 581, MANILA | National Capital Region | North Manila DEO | Completed | ₱2M | 100% | Low risk23 | —-0.103 |
| 240 | 19OE0086LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - SCHOOLBUILDINGS - CONSTRUCTION / IMPROVEMENT OF SCHOOL TRINIDAD TECSON ELEMENTARY SCHOOL, BARANGAY 412, MANILA | National Capital Region | North Manila DEO | Completed | ₱1.9M | 100% | Low risk23 | —-0.101 |
| 241 | 25O00074INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (PAVEMENT MARKINGS) ALONG EDSA/ORTIGAS FLYOVER (S03978LZ) - CHAINAGE 0 - CHAINAGE 348 | National Capital Region | National Capital Region | On-Going | ₱1.2M | 0% | Low risk22 | —-0.036 |
| 242 | 19OE0088LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDING AND OTHER STRUCTURES - SCHOOLBUILDINGS - CONSTRUCTION / IMPROVEMENT OF SCHOOL BUILDING, GEN. MIGUEL MALVAR ELEMENTARY SCHOOL, BARANGAY 581, MANILA | National Capital Region | North Manila DEO | Completed | ₱1.9M | 100% | Low risk22 | —-0.102 |
| 243 | 19OE0068LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES: SCHOOL BUILDINGS- CONSTRUCTION / IMPROVEMENT OF SCHOOL BUILDING, GEN. LICERIO GERONIMO ELEMENTARY SCHOOL, BARANGAY, 412, MANILA | National Capital Region | North Manila DEO | Completed | ₱1.9M | 100% | Low risk22 | —-0.102 |
| 244 | 19OE0092LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - SCHOOLBUILDINGS - CONSTRUCTION / IMPROVEMENT OF SCHOOL BUILDING, CLARO M. RECTO HIGH SCHOOL, BARANGAY 412, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱1.9M | 100% | Low risk22 | —-0.102 |
| 245 | 19OE0091LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - SCHOOLBUILDINGS- CONSTRUCTION / IMPROVEMENT OF SCHOOL BUILDING, ANTONIO MACEDA HIGH SCHOOL, BARANGAY 581, MANILA | National Capital Region | North Manila DEO | Completed | ₱1.9M | 100% | Low risk22 | —-0.103 |
| 246 | 21OE0092REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES, RAMON MAGSAYSAY BR. 1 (BO1781LZ) ALONG R. MAGSAYSAY BLVD | National Capital Region | North Manila DEO | Completed | ₱964.6K | 100% | Low risk20 | —-0.064 |
| 247 | 16OF0156IMPROVEMENT OF MPB FOR BRGY. NORTH FAIRVIEW, NOVALICHES, Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱1.5M | 100% | Low risk18 | —-0.072 |
| 248 | 20CC0050REHABILITATION OF LOCAL ROAD LOLOMBOY, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱1.9M | 100% | Low risk13 | —-0.103 |