Contractor dossier
248 projects on file, including joint ventures this contractor is part of.
Total projects
248
Total budget
₱17B
Average progress
76.7%
Completion rate
62.9%
Below 70%
Average risk score
52.9
Medium risk on average, out of 100
Flagged as unusual
21
8.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 195 | ₱12.2B | 52.9 | 17 | 76.5% |
| Region III | 26 | ₱1.8B | 49.0 | 0 | 80.5% |
| Region IV-A | 15 | ₱1.3B | 54.9 | 2 | 74.6% |
| Region IV-B | 8 | ₱1.4B | 63.8 | 2 | 60.7% |
| Region VI | 3 | ₱144.7M | 49.6 | 0 | 100.0% |
| Negros Island Region | 1 | ₱51.1M | 49.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 94 | ₱4.6B | 43.3 | 6 | 84.3% |
| Flood Control and Drainage | 63 | ₱5.8B | 59.6 | 4 | 75.6% |
| Roads | 50 | ₱4B | 54.6 | 0 | 65.8% |
| Bridges | 23 | ₱1.2B | 49.2 | 0 | 80.0% |
| GAA 2025 SSP | 7 | ₱495.5M | 94.5 | 7 | 49.8% |
| OTHER | 6 | ₱460.1M | 64.6 | 1 | 100.0% |
| GAA 2025 OO-1 | 3 | ₱472.1M | 94.3 | 3 | 24.1% |
| GAA 2025 OO-2 | 1 | ₱16.3M | 80.6 | 0 | 81.4% |
| Water Provision and Storage | 1 | ₱4.5M | 25.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OF0163REHABILITATION OF ROAD ALONG BARANGAY LAGRO, PACKAGE 1A, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱94.5M | 47% | High risk95 | Flagged0.026 |
| 25OF0165REHABILITATION OF ROAD ALONG BARANGAY STA. MONICA, PACKAGE 1A, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱94.4M | 43% | High risk95 | Flagged0.026 |
| 25OF0162REHABILITATION OF ROAD ALONG BARANGAY BAGBAG, PACKAGE 1A, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱94.6M | 46% | High risk95 | Flagged0.026 |
| 25OF0136IMPROVEMENT OF ROADS AT BARANGAY LAGRO, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱97M | 51% | High risk95 | Flagged0.025 |
| 25OF0110REHABILITATION OF ROAD AT BARANGAY GREATER LAGRO, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱47.4M | 57% | High risk94 | Flagged0.015 |
| 25O00017RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - EDSA-KALAYAAN-FORT BONIFACIO FLYOVER (EB) BUENDIA TO FORT BONIFACIO (B02321LZ) ALONG EDSA-KALAYAAN-FORT BONIFACIO FLYOVER (EAST BOUND) | National Capital Region | National Capital Region | On-Going | ₱141.6M | 0% | High risk94 | Flagged0.023 |
| 25O00018RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - MAGALLANES FLYOVER (SB) CUBAO-PASAY (B03219LZ) ALONG EPIFANIO DELOS SANTOS AVE (EDSA) (PHASE II) | National Capital Region | National Capital Region | On-Going | ₱235.9M | 16% | High risk94 | Flagged0.032 |
| 25OF0109IMPROVEMENT OF ROAD AT BARANGAY STA. MONICA, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱48.1M | 61% | High risk94 | Flagged0.016 |
| 25OF0149PREVENTIVE MAINTENANCE - TERTIARY ROADS - REGALADO AVE (NORTH) - K0024 + (-758) - K0025 + 1012, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱94.6M | 56% | High risk94 | Flagged0.001 |
| 25OE0120CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 153, ZONE 14, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱19.4M | 44% | High risk93 | Flagged0.018 |
| 25OE0133REHABILITATION OF DRAINAGE ALONG P. SANCHEZ ST., MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱16.3M | 81% | High risk81 | —-0.019 |
| 25E00080CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG PANGALAAN RIVER, (LEFT SIDE), BRGY. SAMPAGUITA, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱276.2M | 25% | High risk78 | Flagged0.032 |
| 25E00087CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG PANGALAAN RIVER, BRGY. SAMPAGUITA, PHASE 2, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230M | 25% | High risk78 | Flagged0.029 |
| 24C00479SUSTAINABLE INFRAS. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS RDS. AND/OR BR. FR. THE NAT'L. RD./S LEADING TO MAJOR/ STRATEGIC PUBLIC BLDGS./ FACILITIES-CONSTRUCTION OF ROAD,SITIO CALUMPIT-SITIO CULAGO,BARANGAY KALAWAKAN,DONA REMEDIOS TRINIDAD,BULACAN | Region III | Region III | On-Going | ₱95.1M | 0% | High risk76 | —-0.006 |
| 24C00483SUSTAINABLE INFRAS. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS RDS. AND/OR BR. FR. THE NAT'L. RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BLDGS./FACILITIES-CONSTRUCTION OF ROAD,SITIO TUBIGAN-SITIO CULAGO,BARANGAY KALAWAKAN,DONA REMEDIOS TRINIDAD,BULACAN | Region III | Region III | On-Going | ₱95.1M | 0% | High risk76 | —-0.007 |
| 24C00482SUSTAINABLE INFRAS. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS RDS. AND/OR BR. FR. THE NAT'L RD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BLDGS./ FACILITIES-CONSTRUCTION OF ROAD,SITIO KALAYAKN-SITIO PURUMUGAN,BARANGAY KALAWAKAN,DONA REMEDIOS TRINIDAD,BULACAN | Region III | Region III | On-Going | ₱95.1M | 0% | High risk76 | —-0.007 |
| 24C00480SUSTAINABLE INFRAS. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS RDS. AND/OR BR. FR. THE NAT'L. RD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BLDGS./FACILITIES-CONSTRUCTION OF ROAD,SITIO CUCONG-SITIO TALAMSI II, BARANGAY KALAWAKAN,DONA REMEDIOS TRINIDAD,BULACAN | Region III | Region III | On-Going | ₱95.1M | 0% | High risk76 | —-0.007 |
| 24C00498BASIC INFRASTRUCTURE PROGRAM-BIP-ACESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD BARANGAY SUMANDIG-GABIHANAT BARANGAY SUMANDIG, SAN ILDEFONSO, BULACAN | Region III | Region III | On-Going | ₱97.5M | 82% | High risk76 | —-0.028 |
| 24OD0312CONSTRUCTION OF FLOOD CONTROL RIVER WALL (RIGHT BANK), BARANGAY MALINTA, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱142.2M | 100% | High risk72 | —-0.008 |
| 23CC0164SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES ALONG PLARIDEL BYPASS ROAD - K0035+(-602) - K0043+878, PLARIDEL AND BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk72 | —-0.028 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 21O00121CONSTRUCTION OF NEW COA BUILDING WITH BASEMENT, CENTRAL OFFICE COMPOUND, COMMONWEALTH AVENUE, QUEZON CITY | National Capital Region | National Capital Region | On-Going | ₱959.9M | 42% | High risk63 | Flagged0.051 |
| 25E00080CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG PANGALAAN RIVER, (LEFT SIDE), BRGY. SAMPAGUITA, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱276.2M | 25% | High risk78 | Flagged0.032 |
| 25O00018RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - MAGALLANES FLYOVER (SB) CUBAO-PASAY (B03219LZ) ALONG EPIFANIO DELOS SANTOS AVE (EDSA) (PHASE II) | National Capital Region | National Capital Region | On-Going | ₱235.9M | 16% | High risk94 | Flagged0.032 |
| 24OH0158REHABILITATION OF RIZAL MEMORIAL SPORTS COMPLEX | National Capital Region | South Manila DEO | On-Going | ₱194.7M | 40% | High risk64 | Flagged0.030 |
| 24OF0304CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY GULOD, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱47.7M | 0% | Medium risk57 | Flagged0.030 |
| 25E00087CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG PANGALAAN RIVER, BRGY. SAMPAGUITA, PHASE 2, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230M | 25% | High risk78 | Flagged0.029 |
| 25OF0163REHABILITATION OF ROAD ALONG BARANGAY LAGRO, PACKAGE 1A, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱94.5M | 47% | High risk95 | Flagged0.026 |
| 25OF0162REHABILITATION OF ROAD ALONG BARANGAY BAGBAG, PACKAGE 1A, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱94.6M | 46% | High risk95 | Flagged0.026 |
| 25OF0165REHABILITATION OF ROAD ALONG BARANGAY STA. MONICA, PACKAGE 1A, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱94.4M | 43% | High risk95 | Flagged0.026 |
| 25OF0136IMPROVEMENT OF ROADS AT BARANGAY LAGRO, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱97M | 51% | High risk95 | Flagged0.025 |
| 24OD0304CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BAGUMBONG DULO TO PALMERA CREEK, BARANGAY 171, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱94.8M | 100% | High risk67 | Flagged0.023 |
| 25O00017RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - EDSA-KALAYAAN-FORT BONIFACIO FLYOVER (EB) BUENDIA TO FORT BONIFACIO (B02321LZ) ALONG EDSA-KALAYAAN-FORT BONIFACIO FLYOVER (EAST BOUND) | National Capital Region | National Capital Region | On-Going | ₱141.6M | 0% | High risk94 | Flagged0.023 |
| 25OE0120CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 153, ZONE 14, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱19.4M | 44% | High risk93 | Flagged0.018 |
| 25OF0109IMPROVEMENT OF ROAD AT BARANGAY STA. MONICA, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱48.1M | 61% | High risk94 | Flagged0.016 |
| 25OF0110REHABILITATION OF ROAD AT BARANGAY GREATER LAGRO, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱47.4M | 57% | High risk94 | Flagged0.015 |
| 24D00241CONSTRUCTION OF MULTI-PURPOSE BUILDING (DORMITORY) - BATANGAS STATE UNIVERSITY | Region IV-A | Region IV-A | On-Going | ₱38.8M | 30% | Medium risk48 | Flagged0.012 |
| 23OF0200REHABILITATION OF FLOOD CONTROL STRUCTURE, BRGY. PASONG PUTIK, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱38.2M | 100% | Medium risk52 | Flagged0.012 |
| 24O00053CONSTRUCTION OF DPWH NCR REGIONAL OFFICE BUILDING, PHASE III, JW DIOKNO BLVD., PASAY CITY | National Capital Region | National Capital Region | On-Going | ₱423.9M | 10% | High risk65 | Flagged0.008 |
| 25OF0149PREVENTIVE MAINTENANCE - TERTIARY ROADS - REGALADO AVE (NORTH) - K0024 + (-758) - K0025 + 1012, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱94.6M | 56% | High risk94 | Flagged0.001 |
| 24D00243CONSTRUCTION OF THREE (3) STOREY LEARNING CENTER BUILDING, BATSTATEU SAN JUAN - BATANGAS STATE UNIVERSITY | Region IV-A | Region IV-A | On-Going | ₱19.4M | 62% | Medium risk44 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 21OB0087CONSTRUCTION OF MULTI-PURPOSE BUILDING CAYETANO SPORTS COMPLEX, BAGUMBAYAN, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱95M | 100% | High risk63 | —-0.082 |
| 77 | 24E00156SPECIAL ROAD FUND- MOTOR VEHICLE USER'S FUND (MVUC) AS PER R.A. 11239- INSTALLATION OF ROADWAY LIGHTING STRUCTURES ALONG CALAPAN NORTH ROAD, K008+(-659)-K0028+434 (WITH EXCEPTIONS), ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱187.9M | 93% | High risk63 | —-0.031 |
| 78 | 25OH0110CONSTRUCTION OF MULTI-PURPOSE BUILDING (ATHLETE'S DORM), RIZAL MEMORIAL SPORTS COMPLEX, PABLO OCAMPO ST., CITY OF MANILA (PHASE 2) | National Capital Region | South Manila DEO | On-Going | ₱94.3M | 66% | High risk63 | —-0.042 |
| 79 | 25OF0166REHABILITATION OF ROAD ALONG BARANGAY NOVALICHES PROPER, PACKAGE 1A, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱94.6M | 30% | High risk62 | —-0.040 |
| 80 | 25OF0164REHABILITATION OF ROAD ALONG BARANGAY NAGKAISANG NAYON, PACKAGE 1A, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱94.6M | 30% | High risk62 | —-0.040 |
| 81 | 25OF0151PREVENTIVE MAINTENANCE - SECONDARY ROADS - FAIRVIEW AVENUE (S05456LZ) K0023 + 000 - KM022 + 000, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱94.5M | 29% | High risk61 | —-0.040 |
| 82 | 25OF0209REHABILITATION OF ROAD ALONG BARANGAY PASONG PUTIK, PACKAGE 1A, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱94.6M | 29% | High risk61 | —-0.040 |
| 83 | 25OF0150PREVENTIVE MAINTENANCE - SECONDARY ROADS - FAIRVIEW AVENUE (S05456LZ) K0022 + 000 - K0021 + 000, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱94.6M | 29% | High risk61 | —-0.040 |
| 84 | 25OF0148IMPROVEMENT OF ROAD ALONG BARANGAY PASONG PUTIK, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱94.6M | 29% | High risk61 | —-0.040 |
| 85 | 25OF0091IMPROVEMENT OF ROAD AT BARANGAY FAIRVIEW, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱94.8M | 30% | High risk61 | —-0.040 |
| 86 | 25OF0208REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - FAIRVIEW AVENUE (S05456LZ) KM0021 + 000 - KM0021 + (-800), QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱96M | 27% | High risk61 | —-0.038 |
| 87 | 23OE0185INSTALLATION OF ROAD SAFETY DEVICES (SOLAR LED STREETLIGHTS) ALONG DIMASALANG ST., MANILA | National Capital Region | North Manila DEO | Completed | ₱96.4M | 100% | High risk61 | —-0.087 |
| 88 | 23OE0186INSTALLATION OF ROAD SAFETY DEVICES (SOLAR LED STREETLIGHTS) ALONG A.H. LACSON AVE., MANILA | National Capital Region | North Manila DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.087 |
| 89 | 21G00140INSTALLATION OF SOLAR STREETLIGHTS ALONG BACOLOD SOUTH ROAD | Region VI | Region VI | Completed | ₱96.5M | 100% | Medium risk58 | —-0.072 |
| 90 | 24O00168CONSTRUCTION OF TAGUIG CITY MULTI-PURPOSE FACILITY, BRGY. NAPINDAN, TAGUIG CITY (PHASE 6) | National Capital Region | National Capital Region | On-Going | ₱72.4M | 0% | Medium risk58 | —-0.021 |
| 91 | 23O00056CONSTRUCTION OF MULTI-PURPOSE FACILITY (TAGUIG CITY PAROLA), BRGY. NAPINDAN, TAGUIG CITY (PHASE 5) | National Capital Region | National Capital Region | On-Going | ₱70.8M | 32% | Medium risk58 | —-0.028 |
| 92 | 23O00055CONSTRUCTION OF MULTI-PURPOSE FACILITY (TAGUIG CITY PAROLA), BRGY. NAPINDAN, TAGUIG CITY (PHASE 4) | National Capital Region | National Capital Region | On-Going | ₱70.8M | 31% | Medium risk58 | —-0.028 |
| 93 | 21OF0242CONSTRUCTION OF ROAD AND BRIDGE ALONG TULLAHAN RIVER (BARANGAY CAPRI TO SAN DIONISIO BRIDGE), QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱90.6M | 49% | Medium risk57 | —-0.028 |
| 94 | 22OE0131CONSTRUCTION OF PSG CONCESSIONAIRE BUILDING, MALACAÑANG PARK, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱65.5M | 100% | Medium risk57 | —-0.081 |
| 95 | 24OF0304CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY GULOD, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱47.7M | 0% | Medium risk57 | Flagged0.030 |
| 96 | 22OF0154CONSTRUCTION OF BARANGAY NAGKAISANG NAYON GOVERNMENT CENTER, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱47.2M | 100% | Medium risk56 | —-0.088 |
| 97 | 25O00098CONSTRUCTION OF DPWH NCR REGIONAL OFFICE BUILDING, JW DIOKNO BLVD, PASAY CITY (PHASE IV) | National Capital Region | National Capital Region | On-Going | ₱47.1M | 0% | Medium risk55 | —-0.031 |
| 98 | 25OE0112CONSTRUCTION OF J. ABAD SANTOS GENERAL HOSPITAL (PHASE III), MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱47.4M | 0% | Medium risk55 | —-0.030 |
| 99 | 25OH0091RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-SAN MARCELINO BR. (B02309LZ) ALONG SN MARCELINO ST | National Capital Region | South Manila DEO | On-Going | ₱71.4M | 63% | Medium risk55 | —-0.023 |
| 100 | 25OH0102RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - P. QUIRINO BR.1 (B02304LZ) ALONG PRES. QUIRINO AVE. | National Capital Region | South Manila DEO | On-Going | ₱71.6M | 52% | Medium risk55 | —-0.022 |