Contractor dossier
143 projects on file, including joint ventures this contractor is part of.
Total projects
143
Total budget
₱8B
Average progress
88.6%
Completion rate
68.5%
Below 70%
Average risk score
56.2
Medium risk on average, out of 100
Flagged as unusual
16
11.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 84 | ₱5.6B | 60.1 | 12 | 85.4% |
| Region VII | 52 | ₱2.1B | 50.7 | 4 | 94.0% |
| Negros Island Region | 7 | ₱292M | 50.5 | 0 | 88.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 45 | ₱1.7B | 49.0 | 2 | 92.1% |
| Flood Control and Drainage | 37 | ₱2.8B | 55.2 | 0 | 92.8% |
| Bridges | 27 | ₱1.3B | 50.7 | 0 | 89.4% |
| Buildings and Facilities | 10 | ₱306.8M | 43.7 | 2 | 85.1% |
| OTHER | 9 | ₱576.9M | 71.1 | 4 | 88.5% |
| GAA 2025 OO-2 | 6 | ₱768M | 93.6 | 2 | 70.9% |
| GAA 2025 SSP | 4 | ₱403.4M | 95.6 | 4 | 52.2% |
| GAA 2025 OO-1 | 3 | ₱144.9M | 92.8 | 2 | 65.3% |
| Bridges, Roads | 2 | ₱115.4M | 60.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25I00106SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BY-PASSES/DIVERSION ROAD ALONG BRGY. KILIM - SITIO TIPAY ROAD JUNCTION ORMOC - BAYBAY - SOUTHERN LEYTE BOUNDARY ROAD TO B | Region VIII | Region VIII | On-Going | ₱148.3M | 13% | High risk96 | Flagged0.045 |
| 25I00105SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BY-PASSES/DIVERSION ROAD ALONG BRGY. KILIM - SITIO TIPAY ROAD JUNCTION ORMOC - BAYBAY - SOUTHERN LEYTE BOUNDARY ROAD TO B | Region VIII | Region VIII | On-Going | ₱163.8M | 20% | High risk96 | Flagged0.043 |
| 25IG0033INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING, PAVEMENT MARKINGS) ALONG ORMOC-BAYBAY-SOUTHERN LEYTE BDRY RD - K1061 + 000 - K1068 + 500 | Region VIII | Leyte 5th DEO | On-Going | ₱44.5M | 83% | High risk96 | Flagged0.011 |
| 25IG0038INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING, PAVEMENT MARKINGS) ALONG TACLOBAN-BAYBAY SOUTH RD - K0992 + 800 - K1000 + 250 | Region VIII | Leyte 5th DEO | On-Going | ₱46.8M | 93% | High risk95 | Flagged0.008 |
| 25IF0008CONSTRUCTION OF NATUBGAN FLOOD CONTROL (DOWNSTREAM) BARANGAY NATUBGAN, KANANGA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱96.4M | 84% | High risk94 | —-0.008 |
| 25IF0024CONSTRUCTION OF TUGBONG FLOOD CONTROL (DOWNSTREAM) BARANGAY TUGBONG, KANANGA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱96.4M | 83% | High risk94 | —-0.009 |
| 25IF0016CONSTRUCTION OF CANAWAGAN FLOOD CONTROL (UPSTREAM) POBLACION AND BRGY. NATUBGAN, KANANGA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱96.4M | 80% | High risk94 | —-0.008 |
| 25HC0046ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- BRIDGE PROGRAM- REPLACEMENT OF PERMANENT WEAK BRIDGES- HINLAYAGAN BR. (B00136BH) ALONG LOAY INTERIOR RD, TRINIDAD, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱53M | 47% | High risk94 | Flagged0.014 |
| 25I00046CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANGON RIVER (UPSTREAM), BARANGAY LIBERTAD, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱191.3M | 47% | High risk94 | Flagged0.017 |
| 25I00041CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANGON RIVER (DOWNSTREAM), BARANGAY LIBERTAD, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱191.3M | 55% | High risk94 | Flagged0.015 |
| 25HC0047ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- BRIDGE PROGRAM- REPLACEMENT OF PERMANENT WEAK BRIDGES- CAMBANGAY BR. (B00138BH) ALONG LOAY INTERIOR RD, SAN MIGUEL, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱48.9M | 49% | High risk93 | Flagged0.013 |
| 25HC0041ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SUMAK RIVER, CLARIN, BOH | Region VII | Bohol 2nd DEO | On-Going | ₱96.3M | 77% | High risk93 | —-0.005 |
| 25IF0048ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - LIBUNGAO - MATAG-OB - PALOMPON RD - K0991+460 - K0992+000 | Region VIII | Leyte 4th DEO | On-Going | ₱43M | 100% | High risk91 | —-0.012 |
| 24IC0084CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PALO - PASTRANA - STA. FE BY-PASS ROAD, LEYTE, PALO, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱144.7M | 54% | High risk83 | Flagged0.029 |
| 23I00116ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS CABUNGA-AN - TABUNOK - CONSUEGRA RD K1030+000 - K1031+050, LEYTE 3RD LD | Region VIII | Region VIII | On-Going | ₱94.1M | 95% | High risk83 | Flagged0.018 |
| 23IF0027CONSTRUCTION OF NEW BRIDGES - RIZAL BR. ALONG KANANGA-TUNGONAN HOT SPRING ROAD | Region VIII | Leyte 4th DEO | Completed | ₱38.4M | 100% | High risk77 | —-0.023 |
| 24HB0134CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND / OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF BAGUMBAYAN-TIGBAO | Region VII | Bohol 3rd DEO | On-Going | ₱96.4M | 58% | High risk77 | Flagged0.023 |
| 24HC0076CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF BRIDGE LEADING TO UBAY PORT | Region VII | Bohol 2nd DEO | On-Going | ₱77.1M | 89% | High risk74 | Flagged0.010 |
| 25HJ0145ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-DUMAGUETE NORTH RD (JCT. BAIS-KABANKALAN-NEGROS OCC BDRY) K0126+933-K0127+900, GUIHULNGAN CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | On-Going | ₱55.5M | 56% | High risk69 | —-0.024 |
| 24I00007CONSTRUCTION OF LIBERTAD FLOOD CONTROL STRUCTURE ALONG BANGON RIVER, BARANGAY LIBERTAD, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱160.5M | 96% | High risk68 | —-0.014 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19I00107REHABILITATION OF THE OFFICE BUILDINGS FACILITIES AND STRUCTURES OF DA-RFO 8 IN KANHURAW HILL, TACLOBAN CITY, LEYTE | Region VIII | Region VIII | On-Going | ₱142M | 92% | High risk65 | Flagged0.061 |
| 25I00106SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BY-PASSES/DIVERSION ROAD ALONG BRGY. KILIM - SITIO TIPAY ROAD JUNCTION ORMOC - BAYBAY - SOUTHERN LEYTE BOUNDARY ROAD TO B | Region VIII | Region VIII | On-Going | ₱148.3M | 13% | High risk96 | Flagged0.045 |
| 25I00105SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BY-PASSES/DIVERSION ROAD ALONG BRGY. KILIM - SITIO TIPAY ROAD JUNCTION ORMOC - BAYBAY - SOUTHERN LEYTE BOUNDARY ROAD TO B | Region VIII | Region VIII | On-Going | ₱163.8M | 20% | High risk96 | Flagged0.043 |
| 24IM0092CONCRETING OF BRGY. SAN ROQUE FMR PHASE 2, BRGY. SAN ROQUE, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱99.4M | 0% | High risk65 | Flagged0.038 |
| 24IC0084CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PALO - PASTRANA - STA. FE BY-PASS ROAD, LEYTE, PALO, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱144.7M | 54% | High risk83 | Flagged0.029 |
| 24HB0134CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND / OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF BAGUMBAYAN-TIGBAO | Region VII | Bohol 3rd DEO | On-Going | ₱96.4M | 58% | High risk77 | Flagged0.023 |
| 23IM0083CONCRETING OF BRGY. 100 SAN ROQUE FMR, BRGY. 100 SAN ROQUE, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱99.4M | 100% | High risk65 | Flagged0.018 |
| 23I00116ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS CABUNGA-AN - TABUNOK - CONSUEGRA RD K1030+000 - K1031+050, LEYTE 3RD LD | Region VIII | Region VIII | On-Going | ₱94.1M | 95% | High risk83 | Flagged0.018 |
| 25I00046CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANGON RIVER (UPSTREAM), BARANGAY LIBERTAD, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱191.3M | 47% | High risk94 | Flagged0.017 |
| 25I00041CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANGON RIVER (DOWNSTREAM), BARANGAY LIBERTAD, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱191.3M | 55% | High risk94 | Flagged0.015 |
| 25HC0046ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- BRIDGE PROGRAM- REPLACEMENT OF PERMANENT WEAK BRIDGES- HINLAYAGAN BR. (B00136BH) ALONG LOAY INTERIOR RD, TRINIDAD, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱53M | 47% | High risk94 | Flagged0.014 |
| 25HC0047ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- BRIDGE PROGRAM- REPLACEMENT OF PERMANENT WEAK BRIDGES- CAMBANGAY BR. (B00138BH) ALONG LOAY INTERIOR RD, SAN MIGUEL, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱48.9M | 49% | High risk93 | Flagged0.013 |
| 25IG0033INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING, PAVEMENT MARKINGS) ALONG ORMOC-BAYBAY-SOUTHERN LEYTE BDRY RD - K1061 + 000 - K1068 + 500 | Region VIII | Leyte 5th DEO | On-Going | ₱44.5M | 83% | High risk96 | Flagged0.011 |
| 24HC0076CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF BRIDGE LEADING TO UBAY PORT | Region VII | Bohol 2nd DEO | On-Going | ₱77.1M | 89% | High risk74 | Flagged0.010 |
| 25IG0038INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING, PAVEMENT MARKINGS) ALONG TACLOBAN-BAYBAY SOUTH RD - K0992 + 800 - K1000 + 250 | Region VIII | Leyte 5th DEO | On-Going | ₱46.8M | 93% | High risk95 | Flagged0.008 |
| 22IF0100CONSTRUCTION OF ISABEL PORT, ISABEL, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱18M | 59% | Medium risk53 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 25IF0037INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING, PAVEMENT MARKINGS) ALONG ORMOC - BAYBAY - SOUTHERN LEYTE BDRY RD - K1015+612 - K1017+046 | Region VIII | Leyte 4th DEO | On-Going | ₱12.1M | 0% | Medium risk47 | —-0.030 |
| 102 | 25IA0071CONSTRUCTION OF BOOL WEST FLOOD CONTROL STRUCTURE, PHASE I, CULABA, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱29.4M | 100% | Medium risk47 | —-0.050 |
| 103 | 19HA0014CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL ALONG TAGBILARAN NORTH ROAD FOR BARANGAYS TULTUGAN, BINOGAWAN, DESAMPARADOS, BENTIG AND ABUCAYAN NORTE ALL IN CALAPE, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱42.6M | 100% | Medium risk47 | —-0.077 |
| 104 | 20HI0051CONSTRUCTION OF 4STY12CL SB, BAGALNGA INTEGRATED SCHOOL, COMPOSTELA, CEBU | Region VII | Cebu 5th DEO | Completed | ₱36M | 100% | Medium risk47 | —-0.029 |
| 105 | 17IF0040CONSTRUCTION AND MAINTENANCE OF BRIDGE ALONG NATIONAL ROADS - WIDENING OF PERMANENT BRIDGES TO MORE THAN 2 LANES, TULAY DE PERDON (B00563LT) ALONG ORMOC - BAYBAY SO. LEYTE BDRY. ROAD | Region VIII | Leyte 4th DEO | Completed | ₱37.2M | 100% | Medium risk47 | —-0.019 |
| 106 | 18IG0050CONSTRUCTION/REHABILITATION OF CADAC-AN FLOOD STRUCTURES (DIKING SYSTEM MOUTH TO 5KM UPSTREAM), ABUYOG, LEYTE | Region VIII | Leyte 5th DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.071 |
| 107 | 18IG0051CONSTRUCTION/REHABILITATION OF MAHAPLAG FLOOD CONTROL STRUCTURES, MAHAPLAG, LEYTE | Region VIII | Leyte 5th DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.079 |
| 108 | 19HI0064CONSTRUCTION OF 4STY12CL, TILTILON ES, LILOAN, CEBU | Region VII | Cebu 5th DEO | Completed | ₱32.3M | 100% | Medium risk46 | —-0.040 |
| 109 | 24HC0020ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS -FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, CALUNASAN BRIDGE FLOOD CONTRO | Region VII | Bohol 2nd DEO | Completed | ₱48.4M | 100% | Medium risk46 | —-0.072 |
| 110 | 24HC0040ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, SALOG BRIDGE FLOOD CONTROL, G | Region VII | Bohol 2nd DEO | Completed | ₱48.4M | 100% | Medium risk46 | —-0.075 |
| 111 | 20ID0012CONSTRUCTION OF SLOPE PROTECTION STRUCTURE,BRGY. POBLACION DISTRICT 1, JARO, LEYTE | Region VIII | Leyte 2nd DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.079 |
| 112 | 23HC0069ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- BRIDGE PROGRAM- REPLACEMENT OF PERMANENT WEAK BRIDGES - DITTA BR. (B00131BH) ALONG TAGBILARAN EAST RD (TAGBILARAN-JAGNA), UBAY, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱36.3M | 100% | Medium risk46 | —-0.052 |
| 113 | 23HC0036ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, | Region VII | Bohol 2nd DEO | Completed | ₱49M | 100% | Medium risk46 | —-0.068 |
| 114 | 23HC0003ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, | Region VII | Bohol 2nd DEO | Completed | ₱49M | 100% | Medium risk46 | —-0.074 |
| 115 | 23HC0041ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF ANDES BRIDGE RIVER CONTROL | Region VII | Bohol 2nd DEO | Completed | ₱49M | 100% | Medium risk46 | —-0.075 |
| 116 | 25HB0067OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES - CAMAYAON BR. (B00082BH) ALONG LOAY INTERIOR RD. STA.166+490-STA.166+628.89-NATIONAL ROAD STA.166+628.89-STA.166+638.89-BRIDGE STA.166+638.89-STA. | Region VII | Bohol 3rd DEO | On-Going | ₱39.1M | 35% | Medium risk46 | —-0.008 |
| 117 | 18HC0097CONSTRUCTION OF NEW PERMANENT BRIDGE, KATUBOAN BR. ALONG JCT. (LIR) BUENAVISTA-CARMEN-DANAO-JETAFE ROAD (PHASE II), DAGOHOY, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱36.8M | 100% | Medium risk46 | —-0.043 |
| 118 | 20HI0012CONSTRUCTION OF CONCRETE ROAD - COGON - PROVINCIAL ROAD (GUIMBAL-DAPDAP-TAG-UBI) LEADING TO TOURIST DESTINATION AT MYSTICAL ROCK, COMPOSTELA, CEBU | Region VII | Cebu 5th DEO | Completed | ₱23.3M | 100% | Medium risk46 | —-0.096 |
| 119 | 21HI0020CONSTRUCTION OF CONCRETE ROAD - PROVINCIAL ROAD CONNECTING POBLACION AND CABADIANGAN IN SUPPORT OF STEEL ASIA, INOSA FEED MILL, POULTRY AND PIGGERY INDUSTRIES, COMPOSTELA, CEBU | Region VII | Cebu 5th DEO | Completed | ₱21.2M | 100% | Medium risk46 | —-0.096 |
| 120 | 21HI0015CONSTRUCTION OF CONCRETE ROAD - POBLACION-DANASAN ROAD LEADING TO DANASAN ECO PARK, DANAO CITY, CEBU | Region VII | Cebu 5th DEO | Completed | ₱9.3M | 100% | Medium risk46 | —-0.097 |
| 121 | 22HJ0001ASSET PRESERVATION PROGRAM/REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS - VALLEHERMOSO-CANLAON CITY-LA CASTELLANA RD - K0152 + 953 - K0153 + 080, VALLEHERMOSO, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱38.2M | 100% | Medium risk46 | —-0.089 |
| 122 | 21HI0013CONSTRUCTION OF CONCRETE ROAD - COGON-PROVINCIAL ROAD (GUIMBAL-DAPDAP-TAG-UBI) LEADING TO TOURIST DESTINATION AT MYSTICAL ROCK, COMPOSTELA, CEBU | Region VII | Cebu 5th DEO | Completed | ₱9.3M | 100% | Medium risk45 | —-0.097 |
| 123 | 21HB0170LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL BRIDGES - CONSTRUCTION OF ABACHANAN BRIDGE AT ABACHANAN, SIERRA BULLONES, BOHOL, STA. 1+005.00 - STA. 1+055.00 | Region VII | Bohol 3rd DEO | Completed | ₱19.8M | 100% | Medium risk45 | —-0.041 |
| 124 | 20HI0019CONSTRUCTION OF CONCRETE ROAD - PROVINCIAL ROAD CONNECTING POBLACION AND CABADIANGAN IN SUPPORT OF STEEL ASIA, INOSA FEED MILL, POULTRY & PIGGERY INDUSTRIES, COMPOSTELA, CEBU | Region VII | Cebu 5th DEO | Completed | ₱14M | 100% | Medium risk45 | —-0.089 |
| 125 | 19HB0014BRIDGE - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, BILAR BRIDGE (B00083BH) ALONG LOAY INTERIOR ROAD, BILAR, BOHOL, K0177+557 | Region VII | Bohol 3rd DEO | Completed | ₱7.4M | 100% | Medium risk45 | —-0.057 |