904 projects on file, including joint ventures this contractor is part of.
Total projects
904
Total budget
₱55.2B
Average progress
95.2%
Completion rate
85.4%
Average risk score
48.4
Medium risk on average, out of 100
Flagged as unusual
54
6.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Negros Island Region | 200 | ₱8.9B | 48.7 | 9 | 97.6% |
| Region XI | 187 | ₱9.1B | 47.0 | 3 | 99.1% |
| Region IV-B | 170 | ₱16.7B | 50.6 | 18 | 92.7% |
| Region XII | 118 | ₱7.9B | 37.1 | 2 | 99.9% |
| Region VII | 44 | ₱3.6B | 67.6 | 12 | 74.1% |
| Region I | 31 | ₱995.1M | 46.7 | 1 | 100.0% |
| Region VI | 29 | ₱1.5B | 51.6 | 2 | 96.5% |
| Region XIII | 27 | ₱970.7M | 43.1 | 0 | 99.6% |
| Region X | 25 | ₱959.8M | 38.3 | 0 | 100.0% |
| Region IV-A | 17 | ₱1.4B | 71.2 | 4 | 53.1% |
| Region V | 17 | ₱1.5B | 61.0 | 1 | 87.1% |
| Region IX | 16 | ₱441.2M | 47.3 | 0 | 99.3% |
| National Capital Region | 11 | ₱401M | 48.1 | 0 | 99.4% |
| Region VIII | 5 | ₱176.3M | 44.9 | 0 | 100.0% |
| Region III | 4 | ₱431.7M | 75.3 | 2 | 53.5% |
| Cordillera Administrative Region | 3 | ₱167.5M | 54.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 338 | ₱21.3B | 47.5 | 2 | 97.1% |
| Flood Control and Drainage | 318 | ₱25B | 53.4 | 33 | 91.8% |
| Buildings and Facilities | 138 | ₱3.1B | 32.9 | 1 | 98.8% |
| Bridges | 53 | ₱824.6M | 36.8 | 0 | 100.0% |
| OTHER | 35 | ₱3.4B | 72.0 | 7 | 97.9% |
| GAA 2025 SSP | 10 | ₱938.1M | 95.3 | 10 | 60.4% |
| Water Provision and Storage | 5 | ₱40.3M | 36.5 | 0 | 100.0% |
| GAA 2025 OO-2 | 4 | ₱348.9M | 93.5 | 0 | 90.0% |
| Bridges, Roads | 2 | ₱217.5M | 60.5 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱139.7M | 92.8 | 1 | 3.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GN0079CONSTRUCTION OF SHORELINE PROTECTION ALONG GUIMARAS STRAIT - BRGY. ZONE 1, PULUPANDAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱98.9M | 69% | High risk96 | Flagged0.023 |
| 25GN0076CONSTRUCTION OF SHORELINE PROTECTION ALONG GUIMARAS STRAIT - BRGY. ZONE 3 TO BRGY. ZONE 1, PULUPANDAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱98.9M | 75% | High risk96 | Flagged0.021 |
| 25CP0067CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF ROAD, PHASE I, SITIO TUBIGAN - SITIO CALUMPIT, BRGY. | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 20% | High risk96 | Flagged0.035 |
| 25RI0073CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF DORMITORY IN NEGROS ORIENTAL STATE UNIVERSITY - SIATON CAMPUS, SIATON, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | On-Going | ₱96.4M | 26% | High risk96 | Flagged0.039 |
| 25FD0083CONSTRUCTION OF ROAD, BARANGAY TIBLE, LUPI, CAMARINES SUR | Region V | Camarines Sur 1st DEO | On-Going | ₱139.4M | 35% | High risk95 | Flagged0.030 |
| 25CL0220CONSTRUCTION OF PROTECTIVE DIKE ALONG LAUIS RIVER, CANDELARIA, ZAMBALES (PHASE 1) | Region III | Zambales 1st DEO | On-Going | ₱97.6M | 62% | High risk95 | Flagged0.025 |
| 25GL0093CONSTRUCTION OF BINALBAGAN RIVER BANK SLOPE PROTECTION (DOWNSTREAM OF ALICANTE BRIDGE) ALONG JCT BAGONAWA - LA CASTELLANA - ISABELA RD, LEFT BANK, STA 30+030 - 30+180, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱99M | 96% | High risk95 | Flagged0.014 |
| 25GN0075CONSTRUCTION OF LOCAL ACCESS ROAD WITH SLOPE PROTECTION STRUCTURE AT SITIO CAVAN, BARANGAY TAPONG, PULUPANDAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱74.2M | 46% | High risk95 | Flagged0.023 |
| 25GN0077CONSTRUCTION OF SLOPE PROTECTION STRUCTURES ALONG BAGO RIVER, PUROK MASIM-ONG, BARANGAY UBAY, PULUPANDAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱19.8M | 98% | High risk95 | Flagged0.005 |
| 25EH0022CONSTRUCTION OF CAUSEWAY ALONG PUNTA, LOOC, ROMBLON, TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | On-Going | ₱71.3M | 76% | High risk94 | Flagged0.019 |
| 25GN0050CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PATIC CREEK, VALLADOLID, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱95.5M | 81% | High risk94 | —-0.009 |
| 25HO0012ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL ALONG GINATILAN RIVER (RIGHT SIDE), BARANG | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 99% | High risk94 | —-0.011 |
| 25GL0061CONSTRUCTION OF GUINTUBHAN RIVER BANK SLOPE PROTECTION STRUCTURE UPSTREAM (RIGHT BANK) OF GUINTUBHAN BRIDGE, BARANGAY 2, ISABELA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱96.5M | 92% | High risk94 | —-0.012 |
| 25E00137CONSTRUCTION OF MISSING LINKS/NEW ROADS- ODIONGAN EAST-WEST ROAD, ODIONGAN, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱139.7M | 4% | High risk93 | Flagged0.033 |
| 25GL0062CONSTRUCTION OF BINALBAGAN RIVER BANK SLOPE PROTECTION STRUCTURE ALONG JCT. BAGONAWA - LA CASTELLANA - ISABELA ROAD, PHASE 2, BARANGAY 5 POBLACION, ISABELA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱61.8M | 88% | High risk92 | —-0.015 |
| 23GL0125CONSTRUCTION OF BINALBAGAN RIVERBANK SLOPE PROTECTION AT PUROK TUWAY AND PUROK PUNAW, BARANGAY CANMOROS, BINALBAGAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱48.3M | 100% | High risk87 | Flagged0.047 |
| 23HO0270CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER SITIO CANSIBOG, BARANG | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0271CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER, BARANGAY TUPAS, RONDA, CEBU ( | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0256CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION AT BALA RIVER (DOWNSTREAM RIGHT SIDE), MO | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0272CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER (SITIO CANSIBOG - SITI | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23HO0270CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER SITIO CANSIBOG, BARANG | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0271CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER, BARANGAY TUPAS, RONDA, CEBU ( | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0256CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION AT BALA RIVER (DOWNSTREAM RIGHT SIDE), MO | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0272CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER (SITIO CANSIBOG - SITI | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0255CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION AT BALA RIVER (DOWNSTREAM LEFT SIDE), MOAL | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0288CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION AT BALA RIVER (UPSTREAM RIGHT | Region VII | Cebu 7th DEO | On-Going | ₱94.5M | 0% | High risk87 | Flagged0.072 |
| 23HO0313CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BALA RIVER, SITIO LAWAAN (UPSTRE | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.072 |
| 23HO0311CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BALA RIVER, SITIO KANDUONG (DOWN | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.072 |
| 23HO0310CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BALA RIVER, SITIO KANDUONG (DOWN | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.072 |
| 23HO0287CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION AT BALA RIVER (UPSTREAM LEFT | Region VII | Cebu 7th DEO | On-Going | ₱94.5M | 0% | High risk87 | Flagged0.072 |
| 23HO0312CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BALA RIVER, SITIO LAWAAN (UPSTRE | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.072 |
| 21L00110CONSTRUCTION OF ROAD (INCLUDING BRIDGE), BUTAY, BARANGAY PICHON, CARAGA, DAVAO ORIENTAL | Region XI | Region XI | On-Going | ₱122.3M | 93% | High risk80 | Flagged0.051 |
| 23GL0125CONSTRUCTION OF BINALBAGAN RIVERBANK SLOPE PROTECTION AT PUROK TUWAY AND PUROK PUNAW, BARANGAY CANMOROS, BINALBAGAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱48.3M | 100% | High risk87 | Flagged0.047 |
| 25RI0073CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF DORMITORY IN NEGROS ORIENTAL STATE UNIVERSITY - SIATON CAMPUS, SIATON, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | On-Going | ₱96.4M | 26% | High risk96 | Flagged0.039 |
| 24E00195SUSTAINABLE INFRASTRUCTRE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COPASTAL ROAD, PHASE 2, STA. MARIA, TABLAS ISLAND, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱241.2M | 80% | High risk83 | Flagged0.037 |
| 25CP0067CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF ROAD, PHASE I, SITIO TUBIGAN - SITIO CALUMPIT, BRGY. | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 20% | High risk96 | Flagged0.035 |
| 24E00193SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD, PHASE 2, BRGY. TUGDAN, TABLAS ISLAND, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱241.2M | 87% | High risk83 | Flagged0.034 |
| 24E00099FLOOD MANAGEMENT PROGRAM- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF DUBDUBAN FLOOD CONTROL STRUCTURE (UPSTREAM), SAN AGUSTIN, TABLAS ISLAND, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱241.2M | 87% | High risk83 | Flagged0.034 |
| 25E00137CONSTRUCTION OF MISSING LINKS/NEW ROADS- ODIONGAN EAST-WEST ROAD, ODIONGAN, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱139.7M | 4% | High risk93 | Flagged0.033 |
| 25FD0083CONSTRUCTION OF ROAD, BARANGAY TIBLE, LUPI, CAMARINES SUR | Region V | Camarines Sur 1st DEO | On-Going | ₱139.4M | 35% | High risk95 | Flagged0.030 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 276 | 23HO0150ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, DALAGUETE-MANTALONGON-BADIAN RD - K0113 + 520 - K0113 | Region VII | Cebu 7th DEO | Completed | ₱85.4M | 100% | Medium risk54 | —-0.085 |
| 277 | 23HO0157CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF SOLAR LED LIGHTS AND SAFETY BARRIER ALONG SANTANDER-BARILI-TOLEDO RD K0214 + 884 - K0216 + 564 | Region VII | Cebu 7th DEO | Completed | ₱66.2M | 100% | Medium risk54 | —-0.091 |
| 278 | 17GH0046WIDENING OF BRIDGE - BAROTAC VIEJO BR. (B00218PN) ALONG ILOILO EAST COAST-CAPIZ RD, BAROTAC VIEJO, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱16.5M | 100% | Medium risk54 | —-0.028 |
| 279 | 18LA0307OPENING OF PUROK 7 - SALVACION, BRGY. TAMIA - SIDE 4, BRGY. MANGAYON ROAD, MONKAYO, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱58.8M | 100% | Medium risk54 | —-0.012 |
| 280 | 25FN0016OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - ALBAY DIVERSION RD - K0445 + 827 - K0446 + 621 | Region V | Camarines Sur 5th DEO | On-Going | ₱38M | 80% | Medium risk54 | —-0.070 |
| 281 | 17GH0047WIDENING OF BRIDGE - GAAS BR. (B00210PN) ALONG ILOILO EAST COAST-CAPIZ RD, AJUY, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱16.5M | 100% | Medium risk54 | —-0.027 |
| 282 | 17AF0225CONST OF AMBANGONAN DIVERSION DAM, AMBANGONAN, PUGO, LU | Region I | La Union 2nd DEO | Completed | ₱4.7M | 100% | Medium risk54 | Flagged0.002 |
| 283 | 24HO0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG SUBA RIVER (PALANAS SIDE), GI | Region VII | Cebu 7th DEO | Completed | ₱57.9M | 100% | Medium risk54 | —-0.074 |
| 284 | 24LI0025CONSTRUCTION (COMPLETION) OF DPWH DAVAO DE ORO 2ND DEO BUILDING, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱75.4M | 100% | Medium risk54 | —-0.035 |
| 285 | 19AF0074CONST. OF FARMER'S HALL, STA. BARBARA, AGOO. LU | Region I | La Union 2nd DEO | Completed | ₱48M | 100% | Medium risk54 | —-0.076 |
| 286 | 17K00414CONST./ REHAB. OF FLOOD MITIGATION FACILITIES ALONG MAJOR RIVER BASINS AND PRINCIPAL RIVERS | Region X | Region X | Completed | ₱32.1M | 100% | Medium risk54 | —-0.040 |
| 287 | 18LC0006CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD-SURIGAO-DAVAO COASTAL ROAD INCLUDING RROW, K1823+460-K1825+380, TAGUM CITY, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱69.5M | 100% | Medium risk54 | —-0.079 |
| 288 | 22LA0154CONSTRUCTION OF SITIO QUARRY, BRGY. NGAN, COMPOSTELA - UPPER ULIP, MONKAYO ROAD, DAVAO DE ORO, PACKAGE B, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱72.4M | 100% | Medium risk53 | —-0.070 |
| 289 | 24DB0086CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROAD AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BLDGS/ FACILITIES - REHABILITATION OF TALISAY-BIGA ROAD, CALATAGAN, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱79.2M | 100% | Medium risk53 | —-0.065 |
| 290 | 23GO0018CONSTRUCTION OF REVETMENT - CONSTRUCTION OF REVETMENT WITH FLOODWALL IN LOYGOY RIVER, BACOLOD CITY NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | Completed | ₱91.7M | 100% | Medium risk53 | —-0.054 |
| 291 | 17JC0002CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES AT GAYAM BRIDGE ALONG LILOY - SIOCON ROAD (B01174MN) LILOY, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱4.8M | 100% | Medium risk53 | —-0.034 |
| 292 | 18JD0050RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES PULAUAN BRIDGE (BO0588MN) ALONG DIPOLOG-OROQUIETA NATIONAL ROAD, ZN | Region IX | Zamboanga del Norte 1st DEO | Completed | ₱14.5M | 100% | Medium risk53 | —-0.057 |
| 293 | 22L00111REHABILITATION OF THE DPWH COMPONENT AND SUPPLY WAREHOUSE (STORAGE BUILDING), EMD COMPOUND, PANACAN, DAVAO CITY | Region XI | Region XI | Completed | ₱67.5M | 100% | Medium risk53 | —-0.073 |
| 294 | 22LC0063CAPUNGAGAN-MABUHAY-PANDULIAN LEADING TO COCONUT, CACAO, MECHANICAL DRIER, RICE, PACKING HOUSE, KAPALONG, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱67.5M | 100% | Medium risk53 | —-0.081 |
| 295 | 20LE0013CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO PUTING BALAS BEACH RESORT AND KISULAD WHITE SAND BEACHES, BRGY. BASIAWAN, STA. MARIA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱71.1M | 100% | Medium risk53 | —-0.093 |
| 296 | 23LI0103CONSTRUCTION OF ROAD, BARANGAY DAUMAN TO NATIONAL HIGHWAY, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱67.5M | 100% | Medium risk53 | —-0.077 |
| 297 | 17JC0003PROPOSED CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS - REHABILITATION /MAJOR REPAIR OF PERMANENT BRIDGES AT GANASE BRIDGE ALONG LILOY - SIOCON ROAD (B01175MN) LILOY, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱4.8M | 100% | Medium risk53 | —-0.034 |
| 298 | 20LA0155CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - AT SPECIFIC LOCATIONS ALONG DAANG MAHARLIKA (MN) (S00126MN), COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱57.9M | 100% | Medium risk53 | —-0.078 |
| 299 | 19GG0002ROAD WIDENING OF ILOILO - CAPIZ (NEW ROUTE), K0057 + 900 - K0058 + 832, K0058 + 832 - K0060 + 100 | Region VI | Iloilo 2nd DEO | Completed | ₱61M | 100% | Medium risk53 | —-0.081 |
| 300 | 22LD0035CONSTRUCTION OF CONCRETE REVETMENT ALONG PADADA-MAINIT RIVER, DOWNSTREAM MASALAM BRIDGE SECTION, HAGONOY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱77.6M | 100% | Medium risk53 | —-0.069 |