Opening the dossier…
Opening the dossier…
Contractor dossier
904 projects on file, including joint ventures this contractor is part of.
Total projects
904
Total budget
₱55.2B
Average progress
95.2%
Completion rate
85.4%
Average risk score
48.4
Medium risk on average, out of 100
Flagged as unusual
54
6.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Negros Island Region | 200 | ₱8.9B | 48.7 | 9 | 97.6% |
| Region XI | 187 | ₱9.1B | 47.0 | 3 | 99.1% |
| Region IV-B | 170 | ₱16.7B | 50.6 | 18 | 92.7% |
| Region XII | 118 | ₱7.9B | 37.1 | 2 | 99.9% |
| Region VII | 44 | ₱3.6B | 67.6 | 12 | 74.1% |
| Region I | 31 | ₱995.1M | 46.7 | 1 | 100.0% |
| Region VI | 29 | ₱1.5B | 51.6 | 2 | 96.5% |
| Region XIII | 27 | ₱970.7M | 43.1 | 0 | 99.6% |
| Region X | 25 | ₱959.8M | 38.3 | 0 | 100.0% |
| Region IV-A | 17 | ₱1.4B | 71.2 | 4 | 53.1% |
| Region V | 17 | ₱1.5B | 61.0 | 1 | 87.1% |
| Region IX | 16 | ₱441.2M | 47.3 | 0 | 99.3% |
| National Capital Region | 11 | ₱401M | 48.1 | 0 | 99.4% |
| Region VIII | 5 | ₱176.3M | 44.9 | 0 | 100.0% |
| Region III | 4 | ₱431.7M | 75.3 | 2 | 53.5% |
| Cordillera Administrative Region | 3 | ₱167.5M | 54.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 338 | ₱21.3B | 47.5 | 2 | 97.1% |
| Flood Control and Drainage | 318 | ₱25B | 53.4 | 33 | 91.8% |
| Buildings and Facilities | 138 | ₱3.1B | 32.9 | 1 | 98.8% |
| Bridges | 53 | ₱824.6M | 36.8 | 0 | 100.0% |
| OTHER | 35 | ₱3.4B | 72.0 | 7 | 97.9% |
| GAA 2025 SSP | 10 | ₱938.1M | 95.3 | 10 | 60.4% |
| Water Provision and Storage | 5 | ₱40.3M | 36.5 | 0 | 100.0% |
| GAA 2025 OO-2 | 4 | ₱348.9M | 93.5 | 0 | 90.0% |
| Bridges, Roads | 2 | ₱217.5M | 60.5 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱139.7M | 92.8 | 1 | 3.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GN0079CONSTRUCTION OF SHORELINE PROTECTION ALONG GUIMARAS STRAIT - BRGY. ZONE 1, PULUPANDAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱98.9M | 69% | High risk96 | Flagged0.023 |
| 25GN0076CONSTRUCTION OF SHORELINE PROTECTION ALONG GUIMARAS STRAIT - BRGY. ZONE 3 TO BRGY. ZONE 1, PULUPANDAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱98.9M | 75% | High risk96 | Flagged0.021 |
| 25CP0067CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF ROAD, PHASE I, SITIO TUBIGAN - SITIO CALUMPIT, BRGY. | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 20% | High risk96 | Flagged0.035 |
| 25RI0073CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF DORMITORY IN NEGROS ORIENTAL STATE UNIVERSITY - SIATON CAMPUS, SIATON, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | On-Going | ₱96.4M | 26% | High risk96 | Flagged0.039 |
| 25FD0083CONSTRUCTION OF ROAD, BARANGAY TIBLE, LUPI, CAMARINES SUR | Region V | Camarines Sur 1st DEO | On-Going | ₱139.4M | 35% | High risk95 | Flagged0.030 |
| 25CL0220CONSTRUCTION OF PROTECTIVE DIKE ALONG LAUIS RIVER, CANDELARIA, ZAMBALES (PHASE 1) | Region III | Zambales 1st DEO | On-Going | ₱97.6M | 62% | High risk95 | Flagged0.025 |
| 25GL0093CONSTRUCTION OF BINALBAGAN RIVER BANK SLOPE PROTECTION (DOWNSTREAM OF ALICANTE BRIDGE) ALONG JCT BAGONAWA - LA CASTELLANA - ISABELA RD, LEFT BANK, STA 30+030 - 30+180, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱99M | 96% | High risk95 | Flagged0.014 |
| 25GN0075CONSTRUCTION OF LOCAL ACCESS ROAD WITH SLOPE PROTECTION STRUCTURE AT SITIO CAVAN, BARANGAY TAPONG, PULUPANDAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱74.2M | 46% | High risk95 | Flagged0.023 |
| 25GN0077CONSTRUCTION OF SLOPE PROTECTION STRUCTURES ALONG BAGO RIVER, PUROK MASIM-ONG, BARANGAY UBAY, PULUPANDAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱19.8M | 98% | High risk95 | Flagged0.005 |
| 25EH0022CONSTRUCTION OF CAUSEWAY ALONG PUNTA, LOOC, ROMBLON, TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | On-Going | ₱71.3M | 76% | High risk94 | Flagged0.019 |
| 25GN0050CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PATIC CREEK, VALLADOLID, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱95.5M | 81% | High risk94 | —-0.009 |
| 25HO0012ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL ALONG GINATILAN RIVER (RIGHT SIDE), BARANG | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 99% | High risk94 | —-0.011 |
| 25GL0061CONSTRUCTION OF GUINTUBHAN RIVER BANK SLOPE PROTECTION STRUCTURE UPSTREAM (RIGHT BANK) OF GUINTUBHAN BRIDGE, BARANGAY 2, ISABELA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱96.5M | 92% | High risk94 | —-0.012 |
| 25E00137CONSTRUCTION OF MISSING LINKS/NEW ROADS- ODIONGAN EAST-WEST ROAD, ODIONGAN, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱139.7M | 4% | High risk93 | Flagged0.033 |
| 25GL0062CONSTRUCTION OF BINALBAGAN RIVER BANK SLOPE PROTECTION STRUCTURE ALONG JCT. BAGONAWA - LA CASTELLANA - ISABELA ROAD, PHASE 2, BARANGAY 5 POBLACION, ISABELA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱61.8M | 88% | High risk92 | —-0.015 |
| 23GL0125CONSTRUCTION OF BINALBAGAN RIVERBANK SLOPE PROTECTION AT PUROK TUWAY AND PUROK PUNAW, BARANGAY CANMOROS, BINALBAGAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱48.3M | 100% | High risk87 | Flagged0.047 |
| 23HO0270CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER SITIO CANSIBOG, BARANG | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0271CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER, BARANGAY TUPAS, RONDA, CEBU ( | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0256CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION AT BALA RIVER (DOWNSTREAM RIGHT SIDE), MO | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0272CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER (SITIO CANSIBOG - SITI | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23HO0270CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER SITIO CANSIBOG, BARANG | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0271CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER, BARANGAY TUPAS, RONDA, CEBU ( | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0256CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION AT BALA RIVER (DOWNSTREAM RIGHT SIDE), MO | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0272CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER (SITIO CANSIBOG - SITI | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0255CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION AT BALA RIVER (DOWNSTREAM LEFT SIDE), MOAL | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0288CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION AT BALA RIVER (UPSTREAM RIGHT | Region VII | Cebu 7th DEO | On-Going | ₱94.5M | 0% | High risk87 | Flagged0.072 |
| 23HO0313CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BALA RIVER, SITIO LAWAAN (UPSTRE | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.072 |
| 23HO0311CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BALA RIVER, SITIO KANDUONG (DOWN | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.072 |
| 23HO0310CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BALA RIVER, SITIO KANDUONG (DOWN | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.072 |
| 23HO0287CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION AT BALA RIVER (UPSTREAM LEFT | Region VII | Cebu 7th DEO | On-Going | ₱94.5M | 0% | High risk87 | Flagged0.072 |
| 23HO0312CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BALA RIVER, SITIO LAWAAN (UPSTRE | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.072 |
| 21L00110CONSTRUCTION OF ROAD (INCLUDING BRIDGE), BUTAY, BARANGAY PICHON, CARAGA, DAVAO ORIENTAL | Region XI | Region XI | On-Going | ₱122.3M | 93% | High risk80 | Flagged0.051 |
| 23GL0125CONSTRUCTION OF BINALBAGAN RIVERBANK SLOPE PROTECTION AT PUROK TUWAY AND PUROK PUNAW, BARANGAY CANMOROS, BINALBAGAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱48.3M | 100% | High risk87 | Flagged0.047 |
| 25RI0073CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF DORMITORY IN NEGROS ORIENTAL STATE UNIVERSITY - SIATON CAMPUS, SIATON, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | On-Going | ₱96.4M | 26% | High risk96 | Flagged0.039 |
| 24E00195SUSTAINABLE INFRASTRUCTRE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COPASTAL ROAD, PHASE 2, STA. MARIA, TABLAS ISLAND, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱241.2M | 80% | High risk83 | Flagged0.037 |
| 25CP0067CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF ROAD, PHASE I, SITIO TUBIGAN - SITIO CALUMPIT, BRGY. | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 20% | High risk96 | Flagged0.035 |
| 24E00193SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD, PHASE 2, BRGY. TUGDAN, TABLAS ISLAND, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱241.2M | 87% | High risk83 | Flagged0.034 |
| 24E00099FLOOD MANAGEMENT PROGRAM- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF DUBDUBAN FLOOD CONTROL STRUCTURE (UPSTREAM), SAN AGUSTIN, TABLAS ISLAND, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱241.2M | 87% | High risk83 | Flagged0.034 |
| 25E00137CONSTRUCTION OF MISSING LINKS/NEW ROADS- ODIONGAN EAST-WEST ROAD, ODIONGAN, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱139.7M | 4% | High risk93 | Flagged0.033 |
| 25FD0083CONSTRUCTION OF ROAD, BARANGAY TIBLE, LUPI, CAMARINES SUR | Region V | Camarines Sur 1st DEO | On-Going | ₱139.4M | 35% | High risk95 | Flagged0.030 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 376 | 17LB0022CONST. OF PANACAN RIVER FLOOD CONTROL(SLOPE PROTECTION)PANACAN STA. 0+555 TO STA. 0+780,RIGHT BANK, | Region XI | Davao City DEO | Completed | ₱19.6M | 100% | Medium risk50 | —-0.042 |
| 377 | 19AF0048CONST OF SHORE PRO/SEAWALL(FR SITE OF AGOO MUN PORT OF NWARD TO ARINGAY) SAN ISIDRO-SAN NICOLAS WEST | Region I | La Union 2nd DEO | Completed | ₱56M | 100% | Medium risk50 | —-0.064 |
| 378 | 22LA0121CONSTRUCTION OF REVETMENT ALONG PAGTULIAN RIVER, STA. 0+000 - STA. 0+750 (BS), BUKAL, NABUNTURAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱57.2M | 100% | Medium risk50 | —-0.066 |
| 379 | 23HJ0048ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES TALAPTAP BR. (B00093NR) ALONG DUMAGUETE NORTH RD (JCT BAIS-KABANKALAN-NEGROS OCC BDRY), BINDOY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱54M | 100% | Medium risk50 | —-0.044 |
| 380 | 17OE0071MFO 2 - FLOOD MANAGEMENT SERVICES CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF PUMPING STATION, RETARDING POND/RIVERWALL PACKAGE II VALENCIA PUMPING STATION, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱46.8M | 100% | Medium risk50 | —-0.056 |
| 381 | 20HL0024NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING - SECONDARY ROADS : DUMAGUETE SOUTH ROAD - K0107 + 386 - K0108 + 538, BAYAWAN CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱54.3M | 100% | Medium risk50 | —-0.083 |
| 382 | 17OE0073MFO 2 - FLOOD MANAGEMENT SERVICES CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS INSTALLATION OF ADDITIONAL PUMP BALUT PUMPING STATION, TONDO, MANILA CITY TONDO, MANILA | National Capital Region | North Manila DEO | Completed | ₱46.8M | 100% | Medium risk50 | —-0.062 |
| 383 | 23OF0059CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND TRIBUTARIES AT BARANGAY HOLY SPIRIT, QUEZON CITY (PHASE 8) | National Capital Region | Quezon City 1st DEO | Completed | ₱48.5M | 100% | Medium risk50 | —-0.087 |
| 384 | 21LB0114CONSTRUCTION OF DRAINAGE STRUCTURE - JADE VALLEY SECTION TO OUTFALL, DAVAO CITY (STA. 0+473 - STA. 0+950, STA. 0+000 - STA. 0+288, STA. 0+000 - STA. 0+185, STA. 0+000 - STA. 0+493) | Region XI | Davao City DEO | Completed | ₱57.9M | 100% | Medium risk49 | —-0.058 |
| 385 | 17NF0174PREVENTIVE MAINTENANCE, ASPHALT OVERLAY OF SURIGAO WHARF ROAD K1123+641 - K1125+068, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱23.9M | 100% | Medium risk49 | —-0.054 |
| 386 | 21HL0040001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS: RECONSTRUCTION TO CONCRETE PAVEMENT - DUMAGUETE SOUTH RD- K0083 + 1969 - K0085 + 347, K0085 + 9 | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.088 |
| 387 | 21LG0077CONSTRUCTION OF MULTI-PURPOSE BUILDINGS, CITY OF MATI, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱32M | 100% | Medium risk49 | —-0.077 |
| 388 | 18L00175CONSTRUCTION OF EVACUATION CENTER, BARANGAY LACARON, LAWRCO, MALITA, DAVAO OCCIDENTAL | Region XI | Region XI | Completed | ₱34.7M | 100% | Medium risk49 | —-0.079 |
| 389 | 18OF0040ROAD IMPROVEMENT OF D. TUAZON ST., Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱46.8M | 100% | Medium risk49 | —-0.094 |
| 390 | 22LC0036CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAUG RIVER, PROTECTING TAGUM-PANABO CIRCUMFERENTIAL ROAD, ASUNCION, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱57.9M | 100% | Medium risk49 | —-0.068 |
| 391 | 20M00055PAVING OF UNPAVED ROADS - SNA-LEBAK-KALAMANSIG ROAD, K1891 + 286 - K1893 + 686, KALAMANSIG, SULTAN KUDARAT | Region XII | Region XII | Completed | ₱144.7M | 100% | Medium risk49 | —-0.054 |
| 392 | 24GK0180CONSTRUCTION OF BENJAMIN J. BAUTISTA DIVERSION ROAD, BRGY. STO NINO - BRGY. TUBURAN, ENRIQUE B. MAGALONA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱49.5M | 100% | Medium risk49 | —-0.091 |
| 393 | 23OF0061CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY COMMONWEALTH, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.086 |
| 394 | 19M00029PAVING OF UNPAVED ROADS-SNA-LEBAK-KALAMANSIG RD, K1874+689-K1877+058, SENATOR NINOY AQUINO, SULTAN KUDARAT | Region XII | Region XII | Completed | ₱144.8M | 100% | Medium risk49 | —-0.063 |
| 395 | 17LA0007ROAD UPGRADING (GRAVEL TO PAVED) ALONG COMPOSTELA-CATEEL ROAD, PANANSALAN SECTION, COMPOSTELA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱84.9M | 100% | Medium risk49 | —-0.033 |
| 396 | 24GL0088INSTALLATION OF ROADWAY LIGHTING STRUCTURES ALONG HINIGARAN-ISABELA RD., ISABELA-LIBAS NEGROS OCCIDENTAL BDRY RD AND ISABELA POBLACION, ISABELA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.089 |
| 397 | 24JD0025CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) SAN ROQUE - OVERVIEW ROAD IN SUPPORT TO RUBBER AND COCONUT INDUSTRIES, LILOY, ZA | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱4.8M | 100% | Medium risk49 | —-0.082 |
| 398 | 21HL0014001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION - REHABILITATION /RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS: CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - STA. CATALINA-PAMPLONA- | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.089 |
| 399 | 18HL0064CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS: MALABUGAS PROPER-HABHABAN-SAN ROQUE ROAD LEADING TO HABHABAN CAVE, BRGY. MALABUGAS, BAYAWAN (TULONG), NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱50.9M | 100% | Medium risk49 | —-0.086 |
| 400 | 18A00009NETWORK DEVELOPMENT-ROAD WIDENING - PRIMARY ROADS - MANILA NORTH RD - K0221+085 - K0222+613, K0222+626 - K0223+000 | Region I | Region I | Completed | ₱54M | 100% | Medium risk48 | —-0.084 |