Opening the dossier…
Opening the dossier…
Contractor dossier
904 projects on file, including joint ventures this contractor is part of.
Total projects
904
Total budget
₱55.2B
Average progress
95.2%
Completion rate
85.4%
Average risk score
48.4
Medium risk on average, out of 100
Flagged as unusual
54
6.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Negros Island Region | 200 | ₱8.9B | 48.7 | 9 | 97.6% |
| Region XI | 187 | ₱9.1B | 47.0 | 3 | 99.1% |
| Region IV-B | 170 | ₱16.7B | 50.6 | 18 | 92.7% |
| Region XII | 118 | ₱7.9B | 37.1 | 2 | 99.9% |
| Region VII | 44 | ₱3.6B | 67.6 | 12 | 74.1% |
| Region I | 31 | ₱995.1M | 46.7 | 1 | 100.0% |
| Region VI | 29 | ₱1.5B | 51.6 | 2 | 96.5% |
| Region XIII | 27 | ₱970.7M | 43.1 | 0 | 99.6% |
| Region X | 25 | ₱959.8M | 38.3 | 0 | 100.0% |
| Region IV-A | 17 | ₱1.4B | 71.2 | 4 | 53.1% |
| Region V | 17 | ₱1.5B | 61.0 | 1 | 87.1% |
| Region IX | 16 | ₱441.2M | 47.3 | 0 | 99.3% |
| National Capital Region | 11 | ₱401M | 48.1 | 0 | 99.4% |
| Region VIII | 5 | ₱176.3M | 44.9 | 0 | 100.0% |
| Region III | 4 | ₱431.7M | 75.3 | 2 | 53.5% |
| Cordillera Administrative Region | 3 | ₱167.5M | 54.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 338 | ₱21.3B | 47.5 | 2 | 97.1% |
| Flood Control and Drainage | 318 | ₱25B | 53.4 | 33 | 91.8% |
| Buildings and Facilities | 138 | ₱3.1B | 32.9 | 1 | 98.8% |
| Bridges | 53 | ₱824.6M | 36.8 | 0 | 100.0% |
| OTHER | 35 | ₱3.4B | 72.0 | 7 | 97.9% |
| GAA 2025 SSP | 10 | ₱938.1M | 95.3 | 10 | 60.4% |
| Water Provision and Storage | 5 | ₱40.3M | 36.5 | 0 | 100.0% |
| GAA 2025 OO-2 | 4 | ₱348.9M | 93.5 | 0 | 90.0% |
| Bridges, Roads | 2 | ₱217.5M | 60.5 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱139.7M | 92.8 | 1 | 3.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GN0079CONSTRUCTION OF SHORELINE PROTECTION ALONG GUIMARAS STRAIT - BRGY. ZONE 1, PULUPANDAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱98.9M | 69% | High risk96 | Flagged0.023 |
| 25GN0076CONSTRUCTION OF SHORELINE PROTECTION ALONG GUIMARAS STRAIT - BRGY. ZONE 3 TO BRGY. ZONE 1, PULUPANDAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱98.9M | 75% | High risk96 | Flagged0.021 |
| 25CP0067CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF ROAD, PHASE I, SITIO TUBIGAN - SITIO CALUMPIT, BRGY. | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 20% | High risk96 | Flagged0.035 |
| 25RI0073CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF DORMITORY IN NEGROS ORIENTAL STATE UNIVERSITY - SIATON CAMPUS, SIATON, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | On-Going | ₱96.4M | 26% | High risk96 | Flagged0.039 |
| 25FD0083CONSTRUCTION OF ROAD, BARANGAY TIBLE, LUPI, CAMARINES SUR | Region V | Camarines Sur 1st DEO | On-Going | ₱139.4M | 35% | High risk95 | Flagged0.030 |
| 25CL0220CONSTRUCTION OF PROTECTIVE DIKE ALONG LAUIS RIVER, CANDELARIA, ZAMBALES (PHASE 1) | Region III | Zambales 1st DEO | On-Going | ₱97.6M | 62% | High risk95 | Flagged0.025 |
| 25GL0093CONSTRUCTION OF BINALBAGAN RIVER BANK SLOPE PROTECTION (DOWNSTREAM OF ALICANTE BRIDGE) ALONG JCT BAGONAWA - LA CASTELLANA - ISABELA RD, LEFT BANK, STA 30+030 - 30+180, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱99M | 96% | High risk95 | Flagged0.014 |
| 25GN0075CONSTRUCTION OF LOCAL ACCESS ROAD WITH SLOPE PROTECTION STRUCTURE AT SITIO CAVAN, BARANGAY TAPONG, PULUPANDAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱74.2M | 46% | High risk95 | Flagged0.023 |
| 25GN0077CONSTRUCTION OF SLOPE PROTECTION STRUCTURES ALONG BAGO RIVER, PUROK MASIM-ONG, BARANGAY UBAY, PULUPANDAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱19.8M | 98% | High risk95 | Flagged0.005 |
| 25EH0022CONSTRUCTION OF CAUSEWAY ALONG PUNTA, LOOC, ROMBLON, TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | On-Going | ₱71.3M | 76% | High risk94 | Flagged0.019 |
| 25GN0050CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PATIC CREEK, VALLADOLID, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱95.5M | 81% | High risk94 | —-0.009 |
| 25HO0012ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL ALONG GINATILAN RIVER (RIGHT SIDE), BARANG | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 99% | High risk94 | —-0.011 |
| 25GL0061CONSTRUCTION OF GUINTUBHAN RIVER BANK SLOPE PROTECTION STRUCTURE UPSTREAM (RIGHT BANK) OF GUINTUBHAN BRIDGE, BARANGAY 2, ISABELA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱96.5M | 92% | High risk94 | —-0.012 |
| 25E00137CONSTRUCTION OF MISSING LINKS/NEW ROADS- ODIONGAN EAST-WEST ROAD, ODIONGAN, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱139.7M | 4% | High risk93 | Flagged0.033 |
| 25GL0062CONSTRUCTION OF BINALBAGAN RIVER BANK SLOPE PROTECTION STRUCTURE ALONG JCT. BAGONAWA - LA CASTELLANA - ISABELA ROAD, PHASE 2, BARANGAY 5 POBLACION, ISABELA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱61.8M | 88% | High risk92 | —-0.015 |
| 23GL0125CONSTRUCTION OF BINALBAGAN RIVERBANK SLOPE PROTECTION AT PUROK TUWAY AND PUROK PUNAW, BARANGAY CANMOROS, BINALBAGAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱48.3M | 100% | High risk87 | Flagged0.047 |
| 23HO0270CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER SITIO CANSIBOG, BARANG | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0271CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER, BARANGAY TUPAS, RONDA, CEBU ( | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0256CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION AT BALA RIVER (DOWNSTREAM RIGHT SIDE), MO | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0272CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER (SITIO CANSIBOG - SITI | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23HO0270CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER SITIO CANSIBOG, BARANG | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0271CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER, BARANGAY TUPAS, RONDA, CEBU ( | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0256CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION AT BALA RIVER (DOWNSTREAM RIGHT SIDE), MO | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0272CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER (SITIO CANSIBOG - SITI | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0255CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION AT BALA RIVER (DOWNSTREAM LEFT SIDE), MOAL | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0288CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION AT BALA RIVER (UPSTREAM RIGHT | Region VII | Cebu 7th DEO | On-Going | ₱94.5M | 0% | High risk87 | Flagged0.072 |
| 23HO0313CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BALA RIVER, SITIO LAWAAN (UPSTRE | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.072 |
| 23HO0311CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BALA RIVER, SITIO KANDUONG (DOWN | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.072 |
| 23HO0310CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BALA RIVER, SITIO KANDUONG (DOWN | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.072 |
| 23HO0287CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION AT BALA RIVER (UPSTREAM LEFT | Region VII | Cebu 7th DEO | On-Going | ₱94.5M | 0% | High risk87 | Flagged0.072 |
| 23HO0312CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BALA RIVER, SITIO LAWAAN (UPSTRE | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.072 |
| 21L00110CONSTRUCTION OF ROAD (INCLUDING BRIDGE), BUTAY, BARANGAY PICHON, CARAGA, DAVAO ORIENTAL | Region XI | Region XI | On-Going | ₱122.3M | 93% | High risk80 | Flagged0.051 |
| 23GL0125CONSTRUCTION OF BINALBAGAN RIVERBANK SLOPE PROTECTION AT PUROK TUWAY AND PUROK PUNAW, BARANGAY CANMOROS, BINALBAGAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱48.3M | 100% | High risk87 | Flagged0.047 |
| 25RI0073CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF DORMITORY IN NEGROS ORIENTAL STATE UNIVERSITY - SIATON CAMPUS, SIATON, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | On-Going | ₱96.4M | 26% | High risk96 | Flagged0.039 |
| 24E00195SUSTAINABLE INFRASTRUCTRE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COPASTAL ROAD, PHASE 2, STA. MARIA, TABLAS ISLAND, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱241.2M | 80% | High risk83 | Flagged0.037 |
| 25CP0067CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF ROAD, PHASE I, SITIO TUBIGAN - SITIO CALUMPIT, BRGY. | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 20% | High risk96 | Flagged0.035 |
| 24E00193SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD, PHASE 2, BRGY. TUGDAN, TABLAS ISLAND, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱241.2M | 87% | High risk83 | Flagged0.034 |
| 24E00099FLOOD MANAGEMENT PROGRAM- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF DUBDUBAN FLOOD CONTROL STRUCTURE (UPSTREAM), SAN AGUSTIN, TABLAS ISLAND, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱241.2M | 87% | High risk83 | Flagged0.034 |
| 25E00137CONSTRUCTION OF MISSING LINKS/NEW ROADS- ODIONGAN EAST-WEST ROAD, ODIONGAN, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱139.7M | 4% | High risk93 | Flagged0.033 |
| 25FD0083CONSTRUCTION OF ROAD, BARANGAY TIBLE, LUPI, CAMARINES SUR | Region V | Camarines Sur 1st DEO | On-Going | ₱139.4M | 35% | High risk95 | Flagged0.030 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 451 | 19EH0070CONST/IMPRVMT. OF ACCESS RD LEADING TO DECLARED TOURISM DESTINATIONS-MALBOG JCT.STA.FE-GUINBIRAYAN | Region IV-B | Romblon DEO | Completed | ₱65.5M | 100% | Medium risk47 | —-0.086 |
| 452 | 22LC0080CONSTRUCTION OF SITIO NASILABAN ROAD LEADING TO BALAY LUPOWANAN, COCONUT INDUSTRIES, BARANGAY PALMA GIL, TALAINGOD, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.053 |
| 453 | 20GJ0087CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING, JARO NATIONAL HIGH SCHOOL, BRGY. CUARTERO, JARO, ILOILO CITY | Region VI | Iloilo City DEO | Completed | ₱7.8M | 100% | Medium risk47 | —-0.080 |
| 454 | 24LI0029OFF- CARRIAGEWAY IMPROVEMENT: CONSTRUCTION OF TRAFFIC ISLAND - BENIGNO S. AQUINO JR. NATIONAL HIGHWAY (S01432MN) - K1608+660 - K1612+060, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱44.1M | 100% | Medium risk46 | —-0.079 |
| 455 | 18LA0075ROAD WIDENING (4-6 LANE) INCLUDING DRAINAGE AND RROW ALONG DAANG MAHARLIKA, NEW SIBONGA SECTION, NABUNTURAN, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱29.7M | 100% | Medium risk46 | —-0.085 |
| 456 | 21M00024CONSTRUCTION OF CONCRETE REVETMENT, SILWAY RIVER, BARANGAY DADIANGAS NORTH, GENERAL SANTOS CITY, PACKAGE 2 | Region XII | Region XII | Completed | ₱96.1M | 100% | Medium risk46 | —-0.053 |
| 457 | 21LC0006DAANG MAHARLIKA (MN) - K1450+972.10 - K1451+415 L/S, K1451+018.10-K1451+415 R/S | Region XI | Davao del Norte DEO | Completed | ₱29.4M | 100% | Medium risk46 | —-0.088 |
| 458 | 22LC0083CONSTRUCTION OF FEEDER ROAD 1 - SITIO NORDIDA, NEW VISAYAS TO PUROK MAGUINTALUNAN LEADING TO BANANA PACKING HOUSES, BANANA PLANTATIONS AND POMELO FARM, STO. TOMAS, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱36.4M | 100% | Medium risk46 | —-0.091 |
| 459 | 19LC0397IMPROVEMENT OF ROAD, PUROK 7 - PUROK 11 WITH BRIDGE COMPONENT, BRGY. NEW CAMILING, CARMEN, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱8.6M | 100% | Medium risk46 | —-0.058 |
| 460 | 23LI0107CONSTRUCTION OF ROAD, BARANGAY CONCEPCION TO BARANGAY DAUMAN, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱39.2M | 100% | Medium risk46 | —-0.082 |
| 461 | 20LH0028REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG DAVAO-BUKIDNON RD- K1641+614-K1641+668 | Region XI | Davao City 2nd DEO | Completed | ₱32.6M | 100% | Medium risk46 | —-0.092 |
| 462 | 21LG0010ROAD JUNCTION PRRD TO BRGY. SITE , BRGY. SAN JOSE CONNECTING LUPON PUBLIC TERMINAL AND BANANA AND COCONUT PROCESSING SITES IN SUPPORT OF AGRIBUSINESS: BANANA AND CACAO INDUSTRIES , LUPON , DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱12M | 100% | Medium risk46 | —-0.078 |
| 463 | 20LB0089CONSTRUCTION OF CONCRETE ROAD - SITIO BINATON - SITIO POLOKON - JCT. KTC ROAD LEADING TO MEGKAWAYAN PEAK RESORT AND REMY AREJA'S RESORT, BRGY. MALABOG, PAQUIBATO DISTRICT, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱29.4M | 100% | Medium risk46 | —-0.092 |
| 464 | 19LB0039CONSTRUCTION OF FLOOD MITIGATION STRUCTURES -MATINA RIVER, MATINA PANGI SECTION, RIGHT BANK, BRGY. MATINA PANGI, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱50.2M | 100% | Medium risk46 | —-0.073 |
| 465 | 21LA0232CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ALONG DAANG MAHARLIKA (MN) (S00126MN) MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱36.4M | 100% | Medium risk46 | —-0.081 |
| 466 | 18M00008ROAD WIDENING- DEMOLOC LITTLE BAGUIO-ALABEL ROAD, K1658+861+K1661+751, K1658+(-783)-K1658+627, ALABEL, SARANGANI | Region XII | Region XII | Completed | ₱105.9M | 100% | Medium risk46 | —-0.023 |
| 467 | 21LB0013CONSTRUCTION OF ESPLANADE ALONG DAVAO RIVER, BRGY. 1-A AND 2-A SECTION, LEFT BANK, DAVAO CITY (STA. 2+173 - STA. 2+478) | Region XI | Davao City DEO | Completed | ₱48M | 100% | Medium risk46 | —-0.076 |
| 468 | 21LC0200CONSTRUCTION OF CONCRETE REVETMENT ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN SECTION, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱48.1M | 100% | Medium risk46 | —-0.073 |
| 469 | 18LC0122REHABILITATION OF ROAD BRGY. SABANGAN, SAN ISIDRO- BRGY.CEBULIDA, LACK WITH BRIDGE COMPONENT AT SABANGAN ,SAN ISIDRO, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱28.5M | 100% | Medium risk46 | —-0.088 |
| 470 | 18EH0067OFF-CARRIAGEWAY IMPROVEMENT OF TABLAS CIRCUMFERENTIAL RD, K0050 + 000 - K0052 + 477, K0054 + 000 - K0055 + 134, K0083 + 000 - K0083 + 990, K0084 + 560 - K0086 + 792, K0091 + 048 - K0091 + 670, K0096 + 000 - K0097 + 254, K0102 + 894 - K0103 + 045.70 , TABL | Region IV-B | Romblon DEO | Completed | ₱81.8M | 100% | Medium risk46 | —-0.080 |
| 471 | 21LD0024CONSTRUCTION OF CONCRETE ROAD - JCT. TRES DE MAYO-BRGY. GOMA ROAD LEADING TO MAHILAK FALLS, BRGY. GOMA, DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱7.4M | 100% | Medium risk46 | —-0.087 |
| 472 | 25GK0041CONSTRUCTION OF BREAKWATER, BARANGAY CHAMBERY, MANAPLA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.065 |
| 473 | 18EH0064OFF - CARRIAGEWAY IMPROVEMENT OF TABLAS CIRCUMFERENTIAL RD, K0006 + 454 - K0007 + 000, K0008 + 000 - K0008 + 984.09, K0013 + 000 - K0013 + 580, K0013 + 612.75 - K0013 + 672.75, K0015 + 000 - K0016 + 086.15, K0016 + 522.11 - K0016 + 920, K0024 + 833.03 - K | Region IV-B | Romblon DEO | Completed | ₱65.4M | 100% | Medium risk46 | —-0.087 |
| 474 | 24OF0060PREVENTIVE MAINTENANCE OF ROAD: CONCRETE REBLOCKING - PAYATAS RD - K0026 + 500 - K0027 + 559, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱14.6M | 100% | Medium risk46 | —-0.096 |
| 475 | 19LG0051CONSTRUCTION OF CONCRETE ROAD-CONCRETING OF LOPEZ SUBDIVISION, BRGY. MATIAO, MATI, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱5.9M | 100% | Medium risk46 | —-0.077 |