Contractor dossier
904 projects on file, including joint ventures this contractor is part of.
Total projects
904
Total budget
₱55.2B
Average progress
95.2%
Completion rate
85.4%
Average risk score
48.4
Medium risk on average, out of 100
Flagged as unusual
54
6.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Negros Island Region | 200 | ₱8.9B | 48.7 | 9 | 97.6% |
| Region XI | 187 | ₱9.1B | 47.0 | 3 | 99.1% |
| Region IV-B | 170 | ₱16.7B | 50.6 | 18 | 92.7% |
| Region XII | 118 | ₱7.9B | 37.1 | 2 | 99.9% |
| Region VII | 44 | ₱3.6B | 67.6 | 12 | 74.1% |
| Region I | 31 | ₱995.1M | 46.7 | 1 | 100.0% |
| Region VI | 29 | ₱1.5B | 51.6 | 2 | 96.5% |
| Region XIII | 27 | ₱970.7M | 43.1 | 0 | 99.6% |
| Region X | 25 | ₱959.8M | 38.3 | 0 | 100.0% |
| Region IV-A | 17 | ₱1.4B | 71.2 | 4 | 53.1% |
| Region V | 17 | ₱1.5B | 61.0 | 1 | 87.1% |
| Region IX | 16 | ₱441.2M | 47.3 | 0 | 99.3% |
| National Capital Region | 11 | ₱401M | 48.1 | 0 | 99.4% |
| Region VIII | 5 | ₱176.3M | 44.9 | 0 | 100.0% |
| Region III | 4 | ₱431.7M | 75.3 | 2 | 53.5% |
| Cordillera Administrative Region | 3 | ₱167.5M | 54.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 338 | ₱21.3B | 47.5 | 2 | 97.1% |
| Flood Control and Drainage | 318 | ₱25B | 53.4 | 33 | 91.8% |
| Buildings and Facilities | 138 | ₱3.1B | 32.9 | 1 | 98.8% |
| Bridges | 53 | ₱824.6M | 36.8 | 0 | 100.0% |
| OTHER | 35 | ₱3.4B | 72.0 | 7 | 97.9% |
| GAA 2025 SSP | 10 | ₱938.1M | 95.3 | 10 | 60.4% |
| Water Provision and Storage | 5 | ₱40.3M | 36.5 | 0 | 100.0% |
| GAA 2025 OO-2 | 4 | ₱348.9M | 93.5 | 0 | 90.0% |
| Bridges, Roads | 2 | ₱217.5M | 60.5 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱139.7M | 92.8 | 1 | 3.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GN0079CONSTRUCTION OF SHORELINE PROTECTION ALONG GUIMARAS STRAIT - BRGY. ZONE 1, PULUPANDAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱98.9M | 69% | High risk96 | Flagged0.023 |
| 25GN0076CONSTRUCTION OF SHORELINE PROTECTION ALONG GUIMARAS STRAIT - BRGY. ZONE 3 TO BRGY. ZONE 1, PULUPANDAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱98.9M | 75% | High risk96 | Flagged0.021 |
| 25CP0067CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF ROAD, PHASE I, SITIO TUBIGAN - SITIO CALUMPIT, BRGY. | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 20% | High risk96 | Flagged0.035 |
| 25RI0073CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF DORMITORY IN NEGROS ORIENTAL STATE UNIVERSITY - SIATON CAMPUS, SIATON, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | On-Going | ₱96.4M | 26% | High risk96 | Flagged0.039 |
| 25FD0083CONSTRUCTION OF ROAD, BARANGAY TIBLE, LUPI, CAMARINES SUR | Region V | Camarines Sur 1st DEO | On-Going | ₱139.4M | 35% | High risk95 | Flagged0.030 |
| 25CL0220CONSTRUCTION OF PROTECTIVE DIKE ALONG LAUIS RIVER, CANDELARIA, ZAMBALES (PHASE 1) | Region III | Zambales 1st DEO | On-Going | ₱97.6M | 62% | High risk95 | Flagged0.025 |
| 25GL0093CONSTRUCTION OF BINALBAGAN RIVER BANK SLOPE PROTECTION (DOWNSTREAM OF ALICANTE BRIDGE) ALONG JCT BAGONAWA - LA CASTELLANA - ISABELA RD, LEFT BANK, STA 30+030 - 30+180, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱99M | 96% | High risk95 | Flagged0.014 |
| 25GN0075CONSTRUCTION OF LOCAL ACCESS ROAD WITH SLOPE PROTECTION STRUCTURE AT SITIO CAVAN, BARANGAY TAPONG, PULUPANDAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱74.2M | 46% | High risk95 | Flagged0.023 |
| 25GN0077CONSTRUCTION OF SLOPE PROTECTION STRUCTURES ALONG BAGO RIVER, PUROK MASIM-ONG, BARANGAY UBAY, PULUPANDAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱19.8M | 98% | High risk95 | Flagged0.005 |
| 25EH0022CONSTRUCTION OF CAUSEWAY ALONG PUNTA, LOOC, ROMBLON, TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | On-Going | ₱71.3M | 76% | High risk94 | Flagged0.019 |
| 25GN0050CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PATIC CREEK, VALLADOLID, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱95.5M | 81% | High risk94 | —-0.009 |
| 25HO0012ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL ALONG GINATILAN RIVER (RIGHT SIDE), BARANG | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 99% | High risk94 | —-0.011 |
| 25GL0061CONSTRUCTION OF GUINTUBHAN RIVER BANK SLOPE PROTECTION STRUCTURE UPSTREAM (RIGHT BANK) OF GUINTUBHAN BRIDGE, BARANGAY 2, ISABELA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱96.5M | 92% | High risk94 | —-0.012 |
| 25E00137CONSTRUCTION OF MISSING LINKS/NEW ROADS- ODIONGAN EAST-WEST ROAD, ODIONGAN, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱139.7M | 4% | High risk93 | Flagged0.033 |
| 25GL0062CONSTRUCTION OF BINALBAGAN RIVER BANK SLOPE PROTECTION STRUCTURE ALONG JCT. BAGONAWA - LA CASTELLANA - ISABELA ROAD, PHASE 2, BARANGAY 5 POBLACION, ISABELA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱61.8M | 88% | High risk92 | —-0.015 |
| 23GL0125CONSTRUCTION OF BINALBAGAN RIVERBANK SLOPE PROTECTION AT PUROK TUWAY AND PUROK PUNAW, BARANGAY CANMOROS, BINALBAGAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱48.3M | 100% | High risk87 | Flagged0.047 |
| 23HO0270CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER SITIO CANSIBOG, BARANG | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0271CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER, BARANGAY TUPAS, RONDA, CEBU ( | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0256CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION AT BALA RIVER (DOWNSTREAM RIGHT SIDE), MO | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0272CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER (SITIO CANSIBOG - SITI | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23HO0270CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER SITIO CANSIBOG, BARANG | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0271CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER, BARANGAY TUPAS, RONDA, CEBU ( | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0256CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION AT BALA RIVER (DOWNSTREAM RIGHT SIDE), MO | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0272CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER (SITIO CANSIBOG - SITI | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0255CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION AT BALA RIVER (DOWNSTREAM LEFT SIDE), MOAL | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0288CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION AT BALA RIVER (UPSTREAM RIGHT | Region VII | Cebu 7th DEO | On-Going | ₱94.5M | 0% | High risk87 | Flagged0.072 |
| 23HO0313CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BALA RIVER, SITIO LAWAAN (UPSTRE | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.072 |
| 23HO0311CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BALA RIVER, SITIO KANDUONG (DOWN | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.072 |
| 23HO0310CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BALA RIVER, SITIO KANDUONG (DOWN | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.072 |
| 23HO0287CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION AT BALA RIVER (UPSTREAM LEFT | Region VII | Cebu 7th DEO | On-Going | ₱94.5M | 0% | High risk87 | Flagged0.072 |
| 23HO0312CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BALA RIVER, SITIO LAWAAN (UPSTRE | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.072 |
| 21L00110CONSTRUCTION OF ROAD (INCLUDING BRIDGE), BUTAY, BARANGAY PICHON, CARAGA, DAVAO ORIENTAL | Region XI | Region XI | On-Going | ₱122.3M | 93% | High risk80 | Flagged0.051 |
| 23GL0125CONSTRUCTION OF BINALBAGAN RIVERBANK SLOPE PROTECTION AT PUROK TUWAY AND PUROK PUNAW, BARANGAY CANMOROS, BINALBAGAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱48.3M | 100% | High risk87 | Flagged0.047 |
| 25RI0073CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF DORMITORY IN NEGROS ORIENTAL STATE UNIVERSITY - SIATON CAMPUS, SIATON, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | On-Going | ₱96.4M | 26% | High risk96 | Flagged0.039 |
| 24E00195SUSTAINABLE INFRASTRUCTRE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COPASTAL ROAD, PHASE 2, STA. MARIA, TABLAS ISLAND, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱241.2M | 80% | High risk83 | Flagged0.037 |
| 25CP0067CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF ROAD, PHASE I, SITIO TUBIGAN - SITIO CALUMPIT, BRGY. | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 20% | High risk96 | Flagged0.035 |
| 24E00193SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD, PHASE 2, BRGY. TUGDAN, TABLAS ISLAND, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱241.2M | 87% | High risk83 | Flagged0.034 |
| 24E00099FLOOD MANAGEMENT PROGRAM- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF DUBDUBAN FLOOD CONTROL STRUCTURE (UPSTREAM), SAN AGUSTIN, TABLAS ISLAND, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱241.2M | 87% | High risk83 | Flagged0.034 |
| 25E00137CONSTRUCTION OF MISSING LINKS/NEW ROADS- ODIONGAN EAST-WEST ROAD, ODIONGAN, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱139.7M | 4% | High risk93 | Flagged0.033 |
| 25FD0083CONSTRUCTION OF ROAD, BARANGAY TIBLE, LUPI, CAMARINES SUR | Region V | Camarines Sur 1st DEO | On-Going | ₱139.4M | 35% | High risk95 | Flagged0.030 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 726 | 18EH0032CONSTRUCTION OF NEW PERMANENT BRIDGES - STO.NIÑ0 BR. ALONG TABLAS CIRCUMFERENTIAL ROAD, TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱17.2M | 100% | Medium risk38 | —-0.047 |
| 727 | 19EH0062REPLACEMENT OF PERMANENT WEAK BRIDGE - COLIS BRIDGE (B00020TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱16.2M | 100% | Medium risk38 | —-0.052 |
| 728 | 18EH0069REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - BANGON BR. 2 (B00044TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱5.7M | 100% | Medium risk38 | —-0.055 |
| 729 | 19EH0050PAVING OF UNPAVED ROADS OF LUBI - BINOOG ROAD,K0067 + 662 - K0068 + 319 (AS PER RBIA) K0067 + 468.18 - K0068 + 313.64 (AS PER SURVEY), TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱39.3M | 100% | Medium risk37 | —-0.092 |
| 730 | 18EH0053OFF-CARRIAGEWAY IMPROVEMENT OF PARPAGOHA (MARIGONDON)-BINOOG RD - K0017 + (-272) - K0020 + 023, K0020 + 126 - K0020 + 633, TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱38M | 100% | Medium risk37 | —-0.092 |
| 731 | 19HL0101CONSTRUCTION OF 4 STY 4 LAB SCHOOL BUILDING (2 REG WORKSHOP, 1 SCI-LAB, 1 ICT) @ DON EMILIO MACIAS MNHS (SAN FRANCISCO NHS), SANTA CATALINA, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱17.6M | 100% | Medium risk37 | —-0.039 |
| 732 | 18NH0050NRJ LEADING TO LASWITAN SALT LAKE ACCESS ROAD, BRGY. MADRELIÑO, CORTES,SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱10.6M | 100% | Medium risk37 | —-0.078 |
| 733 | 17LC0153CONCRETING OF LAUD TO BOROBOR FMR, BRGY. LUNA, KAPALONG, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱13.9M | 100% | Medium risk37 | —-0.003 |
| 734 | 18HL0091CONSTRUCTION OF 4 STY, 4 LAB (2 REG WORKSHOP, 2 SCI-LAB) @ MARIA MACAHIG NATIONAL HIGH SCHOOL, SIATON, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱17.4M | 100% | Medium risk37 | —-0.034 |
| 735 | 18HL0083CONSTRUCTION OF 4 STY, 4 LAB (2 REG. WORKSHOP, 2 ICT) @ MAGLINAO NATIONAL HIGH SCHOOL, BASAY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱18.4M | 100% | Medium risk37 | —-0.039 |
| 736 | 18HL0090CONSTRUCTION OF 4 STY, 4 LAB (2 REG. WORKSHOP, 2 SCI. LAB) @ BAL-OS NATIONAL HIGH SCHOOL, BASAY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱18.3M | 100% | Medium risk37 | —-0.039 |
| 737 | 18HL0100CONSTRUCTION OF 4 STY, 4 LAB (2 REG WORKSHOP, 2 SCI-LAB) @ GREGORIO ELMAGA MHS, ZAMBOANGUITA, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱17.5M | 100% | Medium risk37 | —-0.040 |
| 738 | 18EH0117CONSTRUCTION AND COMPLETION OF SCHOOL BUILDING IN THE ELEMENTARY AND SECONDARY CLASSROOMS, LUMBANG EAST NATIONAL SCHOOL - 3STY12CL, LUMBANG EAST, CAJIDIOCAN, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱27.7M | 100% | Medium risk37 | —-0.045 |
| 739 | 18EH0027PREVENTIVE MAINTENANCE ALONG LOOC (COGON - TULAY) - ODIONGAN ROAD, TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱10.6M | 100% | Medium risk36 | —-0.092 |
| 740 | 18EH0049CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO SEAPORTS - CARMEN PORT ROAD (DRAINAGE CONSTRUCTION), CARMEN, SAN AGUSTIN, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱19.2M | 100% | Medium risk36 | —-0.091 |
| 741 | 18EH0051REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE OF TABLAS CIRCUMFERENTIAL ROAD, K0069 + 000 - K0069 + 600, TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱23.7M | 100% | Medium risk36 | —-0.090 |
| 742 | 18EH0137CONSTRUCTION AND COMPLETION OF SCHOOL BUILDINGS IN THE ELEMENTARY AND SECONDARY CLASSROOMS, ESTEBAN MADRONA NATIONAL HIGH SCHOOL - 3STY12CL, SAN AGUSTIN, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱26.8M | 100% | Medium risk36 | —-0.043 |
| 743 | 19EH0034CONSTRUCTION OF TIMBAON ACCESS ROAD, STA. 00 + 223 - 00+ 339.50, STA. 00 + 455 - 00 + 517.90, STA. 00 + 000 - 00 + 134, ODIONGAN, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱4.9M | 100% | Medium risk36 | —-0.091 |
| 744 | 20EH0027CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. AZAGRA, SAN FERNANDO, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱4.9M | 100% | Medium risk36 | —-0.085 |
| 745 | 19HL0105CONSTRUCTION OF 2 STY 6 CL SCHOOL BUILDING @ DAWIS ELEMENTARY SCHOOL, CITY OF BAYAWAN (TULONG), NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱15.9M | 100% | Medium risk36 | —-0.043 |
| 746 | 21NI0062CONSTRUCTION OF RIVER BANK PROTECTION ALONG HINATUAN RIVER, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱39M | 100% | Medium risk36 | —-0.056 |
| 747 | 19EH0061CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE LOCAL PROJECTS - BACHAWAN TO ILAYA ROAD LEADING TO TRANGKALAN FALLS, SAN AGUSTIN, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱9.6M | 100% | Medium risk36 | —-0.087 |
| 748 | 18HK0096CONSTRUCTION OF TWO (2) STOREY EIGHT (8) CLASSROOM SCHOOL BUILDING AT AZAGRA HIGH SCHOOL, TANJAY CITY (9.50MX46.00M) | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱16.9M | 100% | Medium risk36 | —-0.040 |
| 749 | 21EH0118OFF-CARRIAGEWAY IMPROVEMENT ALONG TABLAS CIRCUMFERENTIAL ROAD, K0016+966 - K0017+120, K0017+240 - K0017+955 (AS PER ACTUAL)/ K0016+1075 - K0017+117, K0017+237 - K0018+023(AS PER RBIA), TABLAS, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱6.5M | 100% | Medium risk36 | —-0.090 |
| 750 | 19EH0140CONSTRUCTION OF MULTI - PURPOSE BUILDING, BRGY. ANAHAO, ODIONGAN, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱4.9M | 100% | Medium risk36 | —-0.087 |