Opening the dossier…
Opening the dossier…
Contractor dossier
142 projects on file, including joint ventures this contractor is part of.
Total projects
142
Total budget
₱3.2B
Average progress
97.7%
Completion rate
89.4%
Average risk score
36.6
Medium risk on average, out of 100
Flagged as unusual
8
5.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 110 | ₱2.2B | 35.7 | 5 | 98.4% |
| Region XIII | 25 | ₱897.4M | 41.1 | 2 | 95.6% |
| Region X | 6 | ₱37.6M | 24.3 | 1 | 95.0% |
| Negros Island Region | 1 | ₱48.2M | 94.0 | 0 | 87.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 58 | ₱273.8M | 21.8 | 0 | 100.0% |
| Roads | 29 | ₱773.4M | 43.9 | 0 | 95.8% |
| Bridges | 27 | ₱604.3M | 37.1 | 0 | 97.8% |
| Flood Control and Drainage | 15 | ₱921.7M | 49.0 | 2 | 97.9% |
| OTHER | 4 | ₱260.4M | 71.0 | 3 | 94.7% |
| GAA 2025 OO-1 | 3 | ₱186M | 93.1 | 2 | 83.0% |
| GAA 2025 SSP | 2 | ₱32.3M | 84.5 | 1 | 85.0% |
| Water Provision and Storage | 2 | ₱51.5M | 27.3 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱95M | 88.0 | 0 | 91.1% |
| Bridges, Roads | 1 | ₱27.2M | 47.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25KA0031CONSTRUCTION OF CONCRETE BRIDGE, BARANGAY CANDELARIA TO BARANGAY KAWAYAN AND BARANGAY MABUHAY, SAN FERNANDO, BUKIDNON (PHASE III) | Region X | Bukidnon 1st DEO | On-Going | ₱29.4M | 70% | High risk95 | Flagged0.012 |
| 25GK0122PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD NORTH RD (OLD ROUTE) - K0074 + 000 - K0074 + 800 | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱48.2M | 87% | High risk94 | —-0.006 |
| 25L00122REPLACEMENT (COMPLETION) OF BRIDGE - TUGANAY BR. 2 (B01854MN) ALONG MAHARLIKA HIGHWAY (PHASE II), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱104.5M | 82% | High risk94 | Flagged0.014 |
| 25L00062RECONSTRUCTION TO CONCRETE PAVEMENT - MAHARLIKA HIGHWAY - K1469+530-K1469+800, K1469+870-K1470+168, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱33.3M | 80% | High risk91 | Flagged0.006 |
| 24LA0151IMPROVEMENT, REHAB DRAINAGE ALONG MAHARLIKA HIGHWAY, POBLACION, NABUNTURAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱47.5M | 82% | High risk88 | Flagged0.063 |
| 25NH0016CONST. OF FLOOD MITIGATION STRUCTURE ALONG TANDAG RIVER, BRGY. QUEZON, TANDAG CITY, SURIGAO DEL SUR, PHASE 2 | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95M | 91% | High risk88 | —-0.000 |
| 24LI0121PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MONTEVISTA - COMPOSTELA - MATI BDRY. RD K1428+000 - K1432+070, K1432+215 - K1434+000, K1478+794 - K1479+555, K1479+588 - K1481+062 (SECTION 1) | Region XI | Davao de Oro 2nd DEO | Completed | ₱144.7M | 100% | High risk79 | Flagged0.002 |
| 24NH0110IMPROVEMENT OF DPWH SURIGAO DEL SUR 1ST DEO BUILDING, SAN AGUSTIN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱39.2M | 97% | High risk74 | Flagged0.012 |
| 25NH0010CONST. (COMPLETION) OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. SANTA CRUZ, MARIHATAG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱2.9M | 100% | High risk74 | —-0.010 |
| 23LF0164CONSTRUCTION OF FLOOD CONTROL ALONG MANAY RIVER, MANAY, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱96.5M | 100% | High risk68 | Flagged0.005 |
| 23L00041REPLACEMENT (COMPLETION) OF TUGANAY BR. (B00017MN) ALONG DAANG MAHARLIKA (MN), DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱201.7M | 100% | High risk64 | —-0.018 |
| 20L00008WIDENING OF BRIDGE-OSMEÑA BRIDGE (B00082MN) ALONG MONTEVISTA-COMPOSTELA-MATI BDRY. ROAD, COMPOSTELA VALLEY | Region XI | Region XI | Completed | ₱120.1M | 100% | High risk63 | —-0.024 |
| 24L00091REPLACEMENT OF BRIDGE - TUGANAY BR. 2 (PARTIAL SUBSTRUCTURE ONLY) (B01854MN) ALONG MAHARLIKA HIGHWAY (MN), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱112.1M | 96% | High risk62 | —-0.004 |
| 25LF0054CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MAHAN-UB RIVER (MAGUM SECTION), BAGANGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱94.9M | 77% | High risk62 | —-0.014 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24LA0151IMPROVEMENT, REHAB DRAINAGE ALONG MAHARLIKA HIGHWAY, POBLACION, NABUNTURAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱47.5M | 82% | High risk88 | Flagged0.063 |
| 25L00122REPLACEMENT (COMPLETION) OF BRIDGE - TUGANAY BR. 2 (B01854MN) ALONG MAHARLIKA HIGHWAY (PHASE II), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱104.5M | 82% | High risk94 | Flagged0.014 |
| 25KA0031CONSTRUCTION OF CONCRETE BRIDGE, BARANGAY CANDELARIA TO BARANGAY KAWAYAN AND BARANGAY MABUHAY, SAN FERNANDO, BUKIDNON (PHASE III) | Region X | Bukidnon 1st DEO | On-Going | ₱29.4M | 70% | High risk95 | Flagged0.012 |
| 24NH0110IMPROVEMENT OF DPWH SURIGAO DEL SUR 1ST DEO BUILDING, SAN AGUSTIN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱39.2M | 97% | High risk74 | Flagged0.012 |
| 25L00062RECONSTRUCTION TO CONCRETE PAVEMENT - MAHARLIKA HIGHWAY - K1469+530-K1469+800, K1469+870-K1470+168, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱33.3M | 80% | High risk91 | Flagged0.006 |
| 23LF0164CONSTRUCTION OF FLOOD CONTROL ALONG MANAY RIVER, MANAY, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱96.5M | 100% | High risk68 | Flagged0.005 |
| 23NH0113CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAGO RIVER BASIN, BRGY. BANGSUD, TAGO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱106.1M | 100% | Medium risk59 | Flagged0.003 |
| 24LI0121PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MONTEVISTA - COMPOSTELA - MATI BDRY. RD K1428+000 - K1432+070, K1432+215 - K1434+000, K1478+794 - K1479+555, K1479+588 - K1481+062 (SECTION 1) | Region XI | Davao de Oro 2nd DEO | Completed | ₱144.7M | 100% | High risk79 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25KA0031CONSTRUCTION OF CONCRETE BRIDGE, BARANGAY CANDELARIA TO BARANGAY KAWAYAN AND BARANGAY MABUHAY, SAN FERNANDO, BUKIDNON (PHASE III) | Region X | Bukidnon 1st DEO | On-Going | ₱29.4M | 70% | High risk95 | Flagged0.012 |
| 2 | 25GK0122PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD NORTH RD (OLD ROUTE) - K0074 + 000 - K0074 + 800 | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱48.2M | 87% | High risk94 | —-0.006 |
| 3 | 25L00122REPLACEMENT (COMPLETION) OF BRIDGE - TUGANAY BR. 2 (B01854MN) ALONG MAHARLIKA HIGHWAY (PHASE II), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱104.5M | 82% | High risk94 | Flagged0.014 |
| 4 | 25L00062RECONSTRUCTION TO CONCRETE PAVEMENT - MAHARLIKA HIGHWAY - K1469+530-K1469+800, K1469+870-K1470+168, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱33.3M | 80% | High risk91 | Flagged0.006 |
| 5 | 24LA0151IMPROVEMENT, REHAB DRAINAGE ALONG MAHARLIKA HIGHWAY, POBLACION, NABUNTURAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱47.5M | 82% | High risk88 | Flagged0.063 |
| 6 | 25NH0016CONST. OF FLOOD MITIGATION STRUCTURE ALONG TANDAG RIVER, BRGY. QUEZON, TANDAG CITY, SURIGAO DEL SUR, PHASE 2 | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95M | 91% | High risk88 | —-0.000 |
| 7 | 24LI0121PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MONTEVISTA - COMPOSTELA - MATI BDRY. RD K1428+000 - K1432+070, K1432+215 - K1434+000, K1478+794 - K1479+555, K1479+588 - K1481+062 (SECTION 1) | Region XI | Davao de Oro 2nd DEO | Completed | ₱144.7M | 100% | High risk79 | Flagged0.002 |
| 8 | 24NH0110IMPROVEMENT OF DPWH SURIGAO DEL SUR 1ST DEO BUILDING, SAN AGUSTIN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱39.2M | 97% | High risk74 | Flagged0.012 |
| 9 | 25NH0010CONST. (COMPLETION) OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. SANTA CRUZ, MARIHATAG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱2.9M | 100% | High risk74 | —-0.010 |
| 10 | 23LF0164CONSTRUCTION OF FLOOD CONTROL ALONG MANAY RIVER, MANAY, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱96.5M | 100% | High risk68 | Flagged0.005 |
| 11 | 23L00041REPLACEMENT (COMPLETION) OF TUGANAY BR. (B00017MN) ALONG DAANG MAHARLIKA (MN), DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱201.7M | 100% | High risk64 | —-0.018 |
| 12 | 20L00008WIDENING OF BRIDGE-OSMEÑA BRIDGE (B00082MN) ALONG MONTEVISTA-COMPOSTELA-MATI BDRY. ROAD, COMPOSTELA VALLEY | Region XI | Region XI | Completed | ₱120.1M | 100% | High risk63 | —-0.024 |
| 13 | 24L00091REPLACEMENT OF BRIDGE - TUGANAY BR. 2 (PARTIAL SUBSTRUCTURE ONLY) (B01854MN) ALONG MAHARLIKA HIGHWAY (MN), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱112.1M | 96% | High risk62 | —-0.004 |
| 14 | 25LF0054CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MAHAN-UB RIVER (MAGUM SECTION), BAGANGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱94.9M | 77% | High risk62 | —-0.014 |
| 15 | 23NH0113CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAGO RIVER BASIN, BRGY. BANGSUD, TAGO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱106.1M | 100% | Medium risk59 | Flagged0.003 |
| 16 | 21LA0204ASPHALT OVERLAY - AT SPECIFIC LOCATIONS ALONG DAANG MAHARLIKA (MN) (S00126MN) MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱71.7M | 100% | Medium risk53 | —-0.074 |
| 17 | 25LF0024CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CATEEL RIVER, BARANGAY ARAGON, CATEEL, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱81.7M | 91% | Medium risk51 | —-0.021 |
| 18 | 24LF0087SURIGAO DEL SUR BDRY- DAVAO OR COASTAL RD- K1674+221 - K1676+062, K1676+240 - K1678+336, TARRAGONA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.074 |
| 19 | 19LA0160CONSTRUCTION OF REVETMENT ALONG MANAT RIVER LEADING TO AGUSAN RIVER, BRGY. BANKEROHAN, MONTEVISTA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱72.2M | 100% | Medium risk51 | —-0.061 |
| 20 | 21L00066RECONSTRUCTION TO CONCRETE PAVEMENT ALONG DAANG MAHARLIKA (MN) (S00060MN), K1455 + 346 - K1456 + 010, DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱48.2M | 100% | Medium risk51 | —-0.080 |
| 21 | 22LC0032REHABILITATION OF FLOOD CONTROL STRUCTURE, SAN ISIDRO CREEK PROTECTING AGUSAN - DAVAO ROAD, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱56.9M | 100% | Medium risk49 | —-0.069 |
| 22 | 25NH0044CONSTRUCTION OF DIKE ALONG TAGO RIVER BASIN, BARANGAY BANGSUD, TAGO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95M | 100% | Medium risk48 | —-0.025 |
| 23 | 24LF0071SURIGAO DEL SUR BDRY-DAVAO OR COASTAL RD-K1644+080-K1645+520, MANAY, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱43.8M | 100% | Medium risk48 | —-0.076 |
| 24 | 19LA0306WIDENING OF PERMANENT BRIDGE-MAITUM BR. (B00061MN) ALONG DAANG MAHARLIKA (MN), COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱27.2M | 100% | Medium risk47 | —-0.061 |
| 25 | 24LF0025QUINONOAN BR. (B00116MN) ALONG SURIGAO DEL SUR BDRY-DAVAO OR COASTAL RD, MANAY, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.048 |