Contractor dossier
492 projects on file, including joint ventures this contractor is part of.
Total projects
492
Total budget
₱12.2B
Average progress
97.7%
Completion rate
91.9%
Average risk score
29.7
Low risk on average, out of 100
Flagged as unusual
33
6.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 476 | ₱12.1B | 29.8 | 33 | 97.6% |
| Region VII | 16 | ₱54.7M | 26.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 199 | ₱4.9B | 24.9 | 1 | 100.0% |
| Buildings and Facilities | 123 | ₱610.5M | 15.2 | 0 | 100.0% |
| Flood Control and Drainage | 78 | ₱3.2B | 29.9 | 0 | 99.6% |
| OTHER | 23 | ₱1.4B | 78.3 | 12 | 90.2% |
| Bridges | 23 | ₱527.3M | 30.3 | 0 | 100.0% |
| Water Provision and Storage | 17 | ₱84.3M | 18.0 | 0 | 100.0% |
| GAA 2025 SSP | 14 | ₱418.2M | 92.7 | 13 | 63.3% |
| GAA 2025 OO-2 | 11 | ₱712.6M | 88.9 | 4 | 75.6% |
| GAA 2025 OO-1 | 4 | ₱303.7M | 91.1 | 3 | 75.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MC0044CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER, PACKAGE 2, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱112.2M | 53% | High risk95 | Flagged0.038 |
| 25MD0050ROAD WIDENING - DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT), VILLARICA, MIDSAYAP, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱84.2M | 23% | High risk94 | Flagged0.029 |
| 25MD0029MIDSAYAP - LIBUNGAN BYPASS ROAD, COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱140.4M | 88% | High risk94 | Flagged0.019 |
| 25MC0046CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER, PACKAGE 4, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱31.5M | 91% | High risk94 | Flagged0.015 |
| 25MC0071CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ILOMAVIS, KIDAPAWAN CITY | Region XII | Cotabato 2nd DEO | On-Going | ₱4.8M | 99% | High risk93 | Flagged0.011 |
| 25MC0080CONSTRUCTION OF ROAD, BARANGAY LUVIMIN, KIDAPAWAN CITY | Region XII | Cotabato 2nd DEO | On-Going | ₱9.6M | 18% | High risk93 | Flagged0.039 |
| 25MD0049CONSTRUCTION OF FLOOD CONTROL STRUCTURE, LIBUNGAN RIVER, CAMANSI BRIDGE (UPSTREAM, DOWNSTREAM AND BOTH SIDES), CAMANSI, ALAMADA, COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱93.6M | 43% | High risk93 | Flagged0.006 |
| 25MC0042CONSTRUCTION OF ROAD - BENOLIGAN - ONICA - DALAPITAN ROAD, KIDAPAWAN CITY AND MATALAM, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱28.5M | 92% | High risk93 | Flagged0.017 |
| 25MD0038CONSTRUCTION OF BALOGO RIVER FLOOD CONTROL STRUCTURE, ANICK SECTION, BARANGAY ANICK, PIGCAWAYAN, COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱94.4M | 94% | High risk93 | —-0.006 |
| 25MD0034CONSTRUCTION OF BRIDGE APPROACHES AT RARADANGAN TO MACABASA, ALAMADA, NORTH COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱56.1M | 100% | High risk93 | —-0.020 |
| 25MD0039CONSTRUCTION OF BRIDGE APPROACHES CONNECTING CAMANSI AND BARANGAY PACAO, ALAMADA, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱56.1M | 36% | High risk93 | Flagged0.032 |
| 25MD0061CONSTRUCTION OF BRIDGE APPROACHES AT POLAYAGAN TO MAPUROK, ALAMADA, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱56.1M | 22% | High risk93 | Flagged0.038 |
| 25MD0031CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BALOGO RIVER, UPSTREAM OF BALOGO BRIDGE, BARANGAY BALOGO, PIGCAWAYAN, COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱94.7M | 87% | High risk93 | —-0.004 |
| 25MC0082CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) PHASE 1, BARANGAY SAGUING, MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱5.8M | 9% | High risk93 | Flagged0.043 |
| 25MC0091CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY DAGUPAN, MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱4.8M | 31% | High risk92 | Flagged0.034 |
| 25MC0040CONSTRUCTION OF CONCRETE ROAD - BINOLIGAN - AMAZION, KIDAPAWAN CITY, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱38M | 77% | High risk92 | Flagged0.024 |
| 25MC0013RECONSTRUCTION TO CONCRETE PAVEMENT ALONG PACO - ROXAS - ARAKAN VALLEY - JCT DAVAO - BUKIDNON RD - K1659 + 667 - K1660 + 263, K1660 + 286 - K1661 + 134, ANTIPAS, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱26.5M | 90% | High risk92 | Flagged0.002 |
| 25MC0068CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY INDANGAN, KIDAPAWAN CITY | Region XII | Cotabato 2nd DEO | On-Going | ₱4.8M | 92% | High risk92 | Flagged0.015 |
| 25MD0065CONSTRUCTION OF LIBUNGAN RIVER FLOOD CONTROL PROJECT (UPSTREAM AND DOWNSTREAM OF MAPUROK BRIDGE - POLAYAGAN SECTION), POLAYAGAN, ALAMADA, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱74.9M | 42% | High risk92 | Flagged0.003 |
| 25MD0046INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (PAVEMENT MARKINGS, ROAD SIGNS, GUARDRAILS) ALONG MIDSAYAP-MAKAR RD, MIDSAYAP, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱4.9M | 95% | High risk91 | Flagged0.012 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MC0102CONSTRUCTION OF SCHOOL BUILDING (ONE (1) STOREY THREE (3) CLASSROOM), AT ASUNCION ELEMENTARY SCHOOL, BARANGAY POBLACION, MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱7.2M | 52% | High risk87 | Flagged0.058 |
| 25MC0104CONSTRUCTION OF SCHOOL BUILDING (ONE (1) STOREY TWO (2) CLASSROOM), AT NEW CEBU ELEMENTARY SCHOOL, BARANGAY NEW CEBU MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱4.8M | 45% | High risk81 | Flagged0.057 |
| 25MC0103CONSTRUCTION OF SCHOOL BUILDING (ONE (1) STOREY THREE (3) CLASSROOM), AT STO. NIÑO ELEMENTARY SCHOOL, BARANGAY STO. NIÑO MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱7.2M | 78% | High risk87 | Flagged0.051 |
| 17MC0193REHABILITATION OF MALABUAN-BATO-MALUNGON-LACOBE FMR, MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Terminated | ₱63.8M | 100% | Medium risk52 | Flagged0.046 |
| 25MC0082CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) PHASE 1, BARANGAY SAGUING, MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱5.8M | 9% | High risk93 | Flagged0.043 |
| 25MC0080CONSTRUCTION OF ROAD, BARANGAY LUVIMIN, KIDAPAWAN CITY | Region XII | Cotabato 2nd DEO | On-Going | ₱9.6M | 18% | High risk93 | Flagged0.039 |
| 25MC0044CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER, PACKAGE 2, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱112.2M | 53% | High risk95 | Flagged0.038 |
| 25MD0061CONSTRUCTION OF BRIDGE APPROACHES AT POLAYAGAN TO MAPUROK, ALAMADA, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱56.1M | 22% | High risk93 | Flagged0.038 |
| 25MC0091CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY DAGUPAN, MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱4.8M | 31% | High risk92 | Flagged0.034 |
| 25MD0039CONSTRUCTION OF BRIDGE APPROACHES CONNECTING CAMANSI AND BARANGAY PACAO, ALAMADA, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱56.1M | 36% | High risk93 | Flagged0.032 |
| 25MD0050ROAD WIDENING - DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT), VILLARICA, MIDSAYAP, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱84.2M | 23% | High risk94 | Flagged0.029 |
| 25MC0040CONSTRUCTION OF CONCRETE ROAD - BINOLIGAN - AMAZION, KIDAPAWAN CITY, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱38M | 77% | High risk92 | Flagged0.024 |
| 25MD0056CONSTRUCTION OF RETAINING WALL ALONG KITAO CREEK, CENTRAL KATINGAWAN, MIDSAYAP, COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱4.9M | 71% | High risk91 | Flagged0.022 |
| 25MD0029MIDSAYAP - LIBUNGAN BYPASS ROAD, COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱140.4M | 88% | High risk94 | Flagged0.019 |
| 25MC0042CONSTRUCTION OF ROAD - BENOLIGAN - ONICA - DALAPITAN ROAD, KIDAPAWAN CITY AND MATALAM, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱28.5M | 92% | High risk93 | Flagged0.017 |
| 25MC0046CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER, PACKAGE 4, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱31.5M | 91% | High risk94 | Flagged0.015 |
| 25MC0068CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY INDANGAN, KIDAPAWAN CITY | Region XII | Cotabato 2nd DEO | On-Going | ₱4.8M | 92% | High risk92 | Flagged0.015 |
| 16MD0110CONST. OF SINAPANGAN-KALUNGKUNGAN FMR, SINPAPANGAN, LIBUNGAN, COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱24.3M | 100% | High risk83 | Flagged0.013 |
| 25MD0059JCT. DAVAO - COTABATO (CROSSING BAGUER) - SITIO DALUMANGKOM - SITIO LAMPAKI ROAD, PIGKAWAYAN, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱65.5M | 58% | High risk78 | Flagged0.013 |
| 24MD0049MIDSAYAP - LIBUNGAN BYPASS ROAD, COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱106.1M | 92% | High risk81 | Flagged0.013 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 401 | 23MC0101COMPLETION OF TWO-STOREY MULTI-PURPOSE BUILDING - BARANGAY POBLACION, ANTIPAS, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱4.8M | 100% | Low risk17 | —-0.043 |
| 402 | 20MD0051CONCRETING OF PUROK 5-9 ROAD, SAN ISIDRO, MIDSAYAP, COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱1.9M | 100% | Low risk17 | —-0.050 |
| 403 | 24MC0089CONSTRUCTION OF 1-STOREY 2 -CLASSROOM SCHOOL BUILDING IN ANTIPAS CENTRAL ELEMENTARY SCHOOL, BARANGAY POBLACION, ANTIPAS, COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱5M | 100% | Low risk16 | —-0.043 |
| 404 | 24MC0096CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN MAKILALA CENTRAL ELEMENTARY SCHOOL, BARANGAY POBLACION, MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱5M | 100% | Low risk16 | —-0.042 |
| 405 | 17MC0146CONSTRUCTION OF 1 UNIT, 1 STOREY 4 CL SCHOOL BUILDING WITH ATTACHED TOILET AT KIMAHURING ES, PRES. ROXAS, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱5M | 100% | Low risk16 | —-0.014 |
| 406 | 17MD0227CLUSTER E - CONST. OF 2UNITS 1STOREY 3CL SCHOOL BUILDING (TOILET ATTACHED), VILLARICA ES, MIDSAYAP, COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱6.9M | 100% | Low risk16 | —-0.019 |
| 407 | 17MC0152CONSTRUCTION OF 1UNIT, 1 STOREY 4 CL SCHOOL BUILDING WITH ATTACHED TOILET AT SUMBAC ES, KIDAPAWAN CITY | Region XII | Cotabato 2nd DEO | Completed | ₱5M | 100% | Low risk15 | —-0.017 |
| 408 | 21MC0066OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING/CONSTRUCTION - MAKILALA-ALLAH VALLEY RD - K1619+643.4 - K1620+016, MAKILALA, NORTH COTABATO (RE-PUBLISHED) | Region XII | Cotabato 2nd DEO | Completed | ₱4.6M | 100% | Low risk14 | —-0.087 |
| 409 | 19HH0111LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURE - MULTI PURPOSE / FACILITIES - REHABILITATION OF MULTI - PURPOSE BUILDING, BRGY. BINALIW, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱1.9M | 100% | Low risk14 | —-0.095 |
| 410 | 19HH0001LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM-BUILDINGS AND OTHER STRUCTURE- MULTI PURPOSE / FACILITIES - REHABILITATION OF MULTI - PURPOSE BUILDING, BRGY. ADLAON, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱985.5K | 100% | Low risk13 | —-0.092 |
| 411 | 19HH0015LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURE - MULTI PURPOSE / FACILITIES - REHABILITATION OF MULTI - PURPOSE BUILDING, BRGY. BACAYAN, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱985.4K | 100% | Low risk13 | —-0.094 |
| 412 | 20MC0130REPAIR/IMPROVEMENT OF POTABLE WATER SYSTEM IN MAKILALA, COTABATO (CLUSTER 1): BARANGAY BATASAN, BARANGAY BIANGAN, BARANGAY BUHAY AND BARANGAY NEW CEBU | Region XII | Region XII | Completed | ₱2.9M | 100% | Low risk13 | —-0.009 |
| 413 | 19HH0078LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURE - MULTI PURPOSE / FACILITIES - REHABILITATION OF MULTI - PURPOSE BUILDING, BRGY. HIPODROMO, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱1.5M | 100% | Low risk13 | —-0.095 |
| 414 | 21MD0055CONSTRUCTION OF SLOPE/CANAL PROTECTION ALONG BARANGAY VILLARICA-CENTRAL KATINGAWAN ROAD, MIDSAYAP, NORTH COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱3.9M | 100% | Low risk13 | —-0.073 |
| 415 | 23MC0016PAVING OF UNPAVED ROAD ALONG KIDAPAWAN-ILOMAVIS TOURIST ROAD - K1636+440 - K1636+513, KIDAPAWAN CITY, COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱2.9M | 100% | Low risk13 | —-0.086 |
| 416 | 19HH0077LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURE - MULTI PURPOSE / FACILITIES - REHABILITATION OF MULTI - PURPOSE BUILDING, BRGY. STO. NINO, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱985K | 100% | Low risk13 | —-0.092 |
| 417 | 24MD0072RAINWATER COLLECTORS IN PUBLIC FACILITIES, SALUNAYAN ES, MIDSAYAP, MALAMOTE ES, MIDSAYAP, SOUTH MANUANGAN CES, PIGCAWAYAN, PRESBITERO CES, PIGCAWAYAN, PIGCAWAYAN HS, ALAMADA, DADO HS, ALAMADA, HAJI ESMAEL MAPUROK EXTENSION ES, ALAMADA, TAWAS- ABAGA ES, AL | Region XII | Cotabato 1st DEO | Completed | ₱2.9M | 100% | Low risk13 | —-0.055 |
| 418 | 22MD0089CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTOR SYSTEM-RAINWATER COLLECTOR SYSTEM, BANUCAGON ES, PIGCAWAYAN, MALU-AO DAY CARE, PIGCAWAYAN, MANUANGAN HS, PIGCAWAYAN, ROGONAN ES, PIGCAWAYAN, NEW IGBARAS HEALTH STATION, P | Region XII | Cotabato 1st DEO | Completed | ₱3.2M | 100% | Low risk12 | —-0.055 |
| 419 | 20MC0093CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS - RAIN WATER COLLECTORS IN PUBLIC FACILITIES (CLUSTER 1, 20 UNITS) | Region XII | Cotabato 2nd DEO | Completed | ₱3.6M | 100% | Low risk12 | —-0.052 |
| 420 | 21MD0035CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG DUALING-NEW PANAY-MIDSAYAP ROAD, ALEOSAN, COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱3.6M | 100% | Low risk12 | —-0.084 |
| 421 | 21MD0019CONCRETING OF POBLACION 5-POBLACION 8, ALONG IRRIGATION ROAD, BARANGAY POBLACION 8, MIDSAYAP, NORTH COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱2.9M | 100% | Low risk12 | —-0.084 |
| 422 | 21MC0096CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM-(RWCS) (CLUSTER 1) | Region XII | Cotabato 2nd DEO | Completed | ₱4.4M | 100% | Low risk12 | —-0.053 |
| 423 | 18MD0001CONCRETING OF BRGY. CAPAYURAN ROAD, CAPAYURAN, PIGCAWAYAN, COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱3.7M | 100% | Low risk12 | —-0.085 |
| 424 | 22MC0101CONSTRUCTION / REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAINWATER COLLECTOR SYSTEM - RAIN WATER COLLECTOR SYSTEM (CLUSTER 1) | Region XII | Cotabato 2nd DEO | Completed | ₱3.2M | 100% | Low risk12 | —-0.052 |
| 425 | 18MC0097REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES-MARBEL BR. (B00342MN) ALONG MATALAM-LAMPAYAN-ANTIPAS ROAD, MATALAM, COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱3.9M | 100% | Low risk11 | —-0.060 |