Contractor dossier
492 projects on file, including joint ventures this contractor is part of.
Total projects
492
Total budget
₱12.2B
Average progress
97.7%
Completion rate
91.9%
Average risk score
29.7
Low risk on average, out of 100
Flagged as unusual
33
6.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 476 | ₱12.1B | 29.8 | 33 | 97.6% |
| Region VII | 16 | ₱54.7M | 26.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 199 | ₱4.9B | 24.9 | 1 | 100.0% |
| Buildings and Facilities | 123 | ₱610.5M | 15.2 | 0 | 100.0% |
| Flood Control and Drainage | 78 | ₱3.2B | 29.9 | 0 | 99.6% |
| OTHER | 23 | ₱1.4B | 78.3 | 12 | 90.2% |
| Bridges | 23 | ₱527.3M | 30.3 | 0 | 100.0% |
| Water Provision and Storage | 17 | ₱84.3M | 18.0 | 0 | 100.0% |
| GAA 2025 SSP | 14 | ₱418.2M | 92.7 | 13 | 63.3% |
| GAA 2025 OO-2 | 11 | ₱712.6M | 88.9 | 4 | 75.6% |
| GAA 2025 OO-1 | 4 | ₱303.7M | 91.1 | 3 | 75.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MC0044CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER, PACKAGE 2, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱112.2M | 53% | High risk95 | Flagged0.038 |
| 25MD0050ROAD WIDENING - DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT), VILLARICA, MIDSAYAP, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱84.2M | 23% | High risk94 | Flagged0.029 |
| 25MD0029MIDSAYAP - LIBUNGAN BYPASS ROAD, COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱140.4M | 88% | High risk94 | Flagged0.019 |
| 25MC0046CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER, PACKAGE 4, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱31.5M | 91% | High risk94 | Flagged0.015 |
| 25MC0071CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ILOMAVIS, KIDAPAWAN CITY | Region XII | Cotabato 2nd DEO | On-Going | ₱4.8M | 99% | High risk93 | Flagged0.011 |
| 25MC0080CONSTRUCTION OF ROAD, BARANGAY LUVIMIN, KIDAPAWAN CITY | Region XII | Cotabato 2nd DEO | On-Going | ₱9.6M | 18% | High risk93 | Flagged0.039 |
| 25MD0049CONSTRUCTION OF FLOOD CONTROL STRUCTURE, LIBUNGAN RIVER, CAMANSI BRIDGE (UPSTREAM, DOWNSTREAM AND BOTH SIDES), CAMANSI, ALAMADA, COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱93.6M | 43% | High risk93 | Flagged0.006 |
| 25MC0042CONSTRUCTION OF ROAD - BENOLIGAN - ONICA - DALAPITAN ROAD, KIDAPAWAN CITY AND MATALAM, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱28.5M | 92% | High risk93 | Flagged0.017 |
| 25MD0038CONSTRUCTION OF BALOGO RIVER FLOOD CONTROL STRUCTURE, ANICK SECTION, BARANGAY ANICK, PIGCAWAYAN, COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱94.4M | 94% | High risk93 | —-0.006 |
| 25MD0034CONSTRUCTION OF BRIDGE APPROACHES AT RARADANGAN TO MACABASA, ALAMADA, NORTH COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱56.1M | 100% | High risk93 | —-0.020 |
| 25MD0039CONSTRUCTION OF BRIDGE APPROACHES CONNECTING CAMANSI AND BARANGAY PACAO, ALAMADA, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱56.1M | 36% | High risk93 | Flagged0.032 |
| 25MD0061CONSTRUCTION OF BRIDGE APPROACHES AT POLAYAGAN TO MAPUROK, ALAMADA, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱56.1M | 22% | High risk93 | Flagged0.038 |
| 25MD0031CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BALOGO RIVER, UPSTREAM OF BALOGO BRIDGE, BARANGAY BALOGO, PIGCAWAYAN, COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱94.7M | 87% | High risk93 | —-0.004 |
| 25MC0082CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) PHASE 1, BARANGAY SAGUING, MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱5.8M | 9% | High risk93 | Flagged0.043 |
| 25MC0091CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY DAGUPAN, MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱4.8M | 31% | High risk92 | Flagged0.034 |
| 25MC0040CONSTRUCTION OF CONCRETE ROAD - BINOLIGAN - AMAZION, KIDAPAWAN CITY, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱38M | 77% | High risk92 | Flagged0.024 |
| 25MC0013RECONSTRUCTION TO CONCRETE PAVEMENT ALONG PACO - ROXAS - ARAKAN VALLEY - JCT DAVAO - BUKIDNON RD - K1659 + 667 - K1660 + 263, K1660 + 286 - K1661 + 134, ANTIPAS, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱26.5M | 90% | High risk92 | Flagged0.002 |
| 25MC0068CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY INDANGAN, KIDAPAWAN CITY | Region XII | Cotabato 2nd DEO | On-Going | ₱4.8M | 92% | High risk92 | Flagged0.015 |
| 25MD0065CONSTRUCTION OF LIBUNGAN RIVER FLOOD CONTROL PROJECT (UPSTREAM AND DOWNSTREAM OF MAPUROK BRIDGE - POLAYAGAN SECTION), POLAYAGAN, ALAMADA, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱74.9M | 42% | High risk92 | Flagged0.003 |
| 25MD0046INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (PAVEMENT MARKINGS, ROAD SIGNS, GUARDRAILS) ALONG MIDSAYAP-MAKAR RD, MIDSAYAP, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱4.9M | 95% | High risk91 | Flagged0.012 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MC0102CONSTRUCTION OF SCHOOL BUILDING (ONE (1) STOREY THREE (3) CLASSROOM), AT ASUNCION ELEMENTARY SCHOOL, BARANGAY POBLACION, MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱7.2M | 52% | High risk87 | Flagged0.058 |
| 25MC0104CONSTRUCTION OF SCHOOL BUILDING (ONE (1) STOREY TWO (2) CLASSROOM), AT NEW CEBU ELEMENTARY SCHOOL, BARANGAY NEW CEBU MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱4.8M | 45% | High risk81 | Flagged0.057 |
| 25MC0103CONSTRUCTION OF SCHOOL BUILDING (ONE (1) STOREY THREE (3) CLASSROOM), AT STO. NIÑO ELEMENTARY SCHOOL, BARANGAY STO. NIÑO MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱7.2M | 78% | High risk87 | Flagged0.051 |
| 17MC0193REHABILITATION OF MALABUAN-BATO-MALUNGON-LACOBE FMR, MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Terminated | ₱63.8M | 100% | Medium risk52 | Flagged0.046 |
| 25MC0082CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) PHASE 1, BARANGAY SAGUING, MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱5.8M | 9% | High risk93 | Flagged0.043 |
| 25MC0080CONSTRUCTION OF ROAD, BARANGAY LUVIMIN, KIDAPAWAN CITY | Region XII | Cotabato 2nd DEO | On-Going | ₱9.6M | 18% | High risk93 | Flagged0.039 |
| 25MC0044CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER, PACKAGE 2, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱112.2M | 53% | High risk95 | Flagged0.038 |
| 25MD0061CONSTRUCTION OF BRIDGE APPROACHES AT POLAYAGAN TO MAPUROK, ALAMADA, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱56.1M | 22% | High risk93 | Flagged0.038 |
| 25MC0091CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY DAGUPAN, MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱4.8M | 31% | High risk92 | Flagged0.034 |
| 25MD0039CONSTRUCTION OF BRIDGE APPROACHES CONNECTING CAMANSI AND BARANGAY PACAO, ALAMADA, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱56.1M | 36% | High risk93 | Flagged0.032 |
| 25MD0050ROAD WIDENING - DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT), VILLARICA, MIDSAYAP, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱84.2M | 23% | High risk94 | Flagged0.029 |
| 25MC0040CONSTRUCTION OF CONCRETE ROAD - BINOLIGAN - AMAZION, KIDAPAWAN CITY, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱38M | 77% | High risk92 | Flagged0.024 |
| 25MD0056CONSTRUCTION OF RETAINING WALL ALONG KITAO CREEK, CENTRAL KATINGAWAN, MIDSAYAP, COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱4.9M | 71% | High risk91 | Flagged0.022 |
| 25MD0029MIDSAYAP - LIBUNGAN BYPASS ROAD, COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱140.4M | 88% | High risk94 | Flagged0.019 |
| 25MC0042CONSTRUCTION OF ROAD - BENOLIGAN - ONICA - DALAPITAN ROAD, KIDAPAWAN CITY AND MATALAM, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱28.5M | 92% | High risk93 | Flagged0.017 |
| 25MC0046CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER, PACKAGE 4, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱31.5M | 91% | High risk94 | Flagged0.015 |
| 25MC0068CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY INDANGAN, KIDAPAWAN CITY | Region XII | Cotabato 2nd DEO | On-Going | ₱4.8M | 92% | High risk92 | Flagged0.015 |
| 16MD0110CONST. OF SINAPANGAN-KALUNGKUNGAN FMR, SINPAPANGAN, LIBUNGAN, COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱24.3M | 100% | High risk83 | Flagged0.013 |
| 25MD0059JCT. DAVAO - COTABATO (CROSSING BAGUER) - SITIO DALUMANGKOM - SITIO LAMPAKI ROAD, PIGKAWAYAN, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱65.5M | 58% | High risk78 | Flagged0.013 |
| 24MD0049MIDSAYAP - LIBUNGAN BYPASS ROAD, COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱106.1M | 92% | High risk81 | Flagged0.013 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 23MD0059CONSTRUCTION OF PUROK 3 - PUROK 9, MALAMOTE TO BARANGAY PENTIL ROAD, MIDSAYAP AND ALEOSAN, NORTH COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱96.5M | 100% | Medium risk40 | —-0.078 |
| 77 | 20MC0016OFF-CARRIAGEWAY IMPROVEMENT: FLARING OF INTERSECTIONS / IMPROVEMENT OF INTERSECTIONS- ALONG DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT) (S00682MN) K1618 + 317, KIDAPAWAN CITY, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱19.6M | 100% | Medium risk40 | —-0.052 |
| 78 | 17MC0084ROAD WIDENING - DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT) K1617+690-K1618+083 | Region XII | Cotabato 2nd DEO | Completed | ₱24.3M | 100% | Medium risk40 | —-0.054 |
| 79 | 22MD0082CONSTRUCTION OF CONCRETE ROAD - SITIO LAMPAKI-CAMPO 3 AGRI-TOURIST ROAD PASSING THROUGH LAMPAKI 7 FALLS, BRGY. KIMARAYAG, PIGCAWAYAN, NORTH COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱96.5M | 100% | Medium risk40 | —-0.075 |
| 80 | 23MD0071CONSTRUCTION OF CONCRETE ROAD - JCT. DAVAO - COTABATO (CROSSING BAGUER) - SITIO DALUMANGKOM - SITIO LAMPAKI ROAD, ALAMADA, NORTH COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱95.5M | 100% | Medium risk40 | —-0.078 |
| 81 | 17MC0070ROAD UPGRADING GRAVEL TO PAVED - KIDAPAWAN-ILOMAVIS TOURIST RD - K1635+067-K1635+246 | Region XII | Cotabato 2nd DEO | Completed | ₱6.7M | 100% | Medium risk40 | —-0.053 |
| 82 | 20MD0111CONCRETING OF ILBOCEAN-ANONANG-BARONGIS ROAD, BRGY. ILBOCEAN, ANONANG, MIDSAYAP/BARONGIS, LIBUNGAN, NORTH COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱14.5M | 100% | Medium risk39 | —-0.057 |
| 83 | 20MD0012ROAD WIDENING ALONG BANISILAN-GUILING-ALAMADA-LIBUNGAN ROAD, LIBUNGAN, NORTH COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱33M | 100% | Medium risk39 | —-0.056 |
| 84 | 24MD0018JCT. DAVAO-COTABATO (CROSSING BAGUER)-SITIO DALUMANGKOM-SITIO LAMPAKI ROAD, ALAMADA, NORTH COTABATO, PACKAGE I, ALAMADA, COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱95.5M | 100% | Medium risk39 | —-0.078 |
| 85 | 17MD0051WIDENING OF PERMANENT BRIDGES, MANUANGAN BR (B00316MN) INCLUDING ROW-TO MORE THAN 2 LANES ALONG DVO- | Region XII | Cotabato 1st DEO | Completed | ₱19.6M | 100% | Medium risk38 | —-0.033 |
| 86 | 22MB0013CONSTRUCTION OF CONCRETE REVETMENT LOWER KLINAN - MABUHAY (SILWAY RIVER BASIN), STA. 0+694 - STA.1+318, BRGY. MABUHAY, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱86.8M | 100% | Medium risk38 | —-0.060 |
| 87 | 24MD0009CONSTRUCTION OF STA. CRUZ - DUALING ROAD, ALEOSAN, COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱4.9M | 100% | Medium risk38 | —-0.052 |
| 88 | 17MC0074REPLACEMENT OF BRIDGE -PATULANGON BR. (B00230MN) ALONG DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT) | Region XII | Cotabato 2nd DEO | Completed | ₱37.2M | 100% | Medium risk37 | —-0.026 |
| 89 | 17MD0057WIDENING OF PERMANENT BRIDGES, BULANAN BR. 1(B00309MN) INCLUDING ROW - TO MORE THAN 2 LANES ALONG DV | Region XII | Cotabato 1st DEO | Completed | ₱32.8M | 100% | Medium risk37 | —-0.021 |
| 90 | 17MD0052WIDENING OF PERMANENT BRIDGES, BULUAN BR. 2 (B01814MN) INCLUDING ROW- TO MORE THAN 2 LANES ALONG DVO | Region XII | Cotabato 1st DEO | Completed | ₱16.9M | 100% | Medium risk37 | —-0.034 |
| 91 | 17MC0062WIDENING OF BRIDGE - PAMINTUAN BR. (B01806MN) ALONG MAKILALA-ALLAH VALLEY RD | Region XII | Cotabato 2nd DEO | Completed | ₱23.5M | 100% | Medium risk37 | —-0.032 |
| 92 | 17MD0035WIDENING OF PERMANENT BRIDGES, BULUAN BR 1 (B00315MN) INCLUDING ROW TO MORE THAN 2LANES ALONG DVO-CO | Region XII | Cotabato 1st DEO | Completed | ₱11.3M | 100% | Medium risk36 | —-0.034 |
| 93 | 20MC0005ROAD WIDENING - ALONG MAKILALA ALLAH VALLEY RD (S00692MN) K1617+120 TO K1619+623 MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱91.7M | 100% | Medium risk36 | —-0.076 |
| 94 | 21MH0025CONSTRUCTION OF RIVER BANK PROTECTION/FLOOD CONTROL, BRGY. BIWANG, BAGUMBAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱67.5M | 100% | Medium risk35 | —-0.072 |
| 95 | 21MB0014CONCRETING OF ROAD INCLUDING DRAINAGE, ALONG NURSERY ROAD TO JCT. ALBERT MORROW BOULEVARD, BARANGAY KATANGAWAN, GENERAL SANTOS CITY, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱67.6M | 100% | Medium risk35 | —-0.079 |
| 96 | 21MC0051REHABILITATION OF SLOPE PROTECTION OF PATULANGON BR, SINALLANGAN BR, BALUGAN BR, BULATUKAN BR, MALASILA BR, TULUAN BR, LAMITAN BR, MALAANG BR, AND SAGUING BR, ALONG DAVAO - COTABATO RD (JCT DIGOS - COTABATO SECT) PRIMARY NATIONAL ROAD (WITHIN MAKILALA SEC | Region XII | Cotabato 2nd DEO | Completed | ₱57.8M | 100% | Medium risk35 | —-0.064 |
| 97 | 24MC0064CONSTRUCTION OF ROAD - BENOLIGAN-ONICA-DALAPITAN ROAD, KIDAPAWAN CITY AND MATALAM, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱86.3M | 100% | Medium risk34 | —-0.075 |
| 98 | 24MC0062CONSTRUCTION OF CONCRETE ROAD - BINOLIGAN-AMAZION, KIDAPAWAN CITY, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱82M | 100% | Medium risk34 | —-0.077 |
| 99 | 24MD0038ROAD WIDENING - PRIMARY ROAD - ALONG DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT.), PIKIT, COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱78.6M | 100% | Medium risk34 | —-0.082 |
| 100 | 22MC0019ROAD WIDENING - PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1634 + 916 - K1636 + 870, PRES. ROXAS, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱71.3M | 100% | Medium risk34 | —-0.076 |