Contractor dossier
492 projects on file, including joint ventures this contractor is part of.
Total projects
492
Total budget
₱12.2B
Average progress
97.7%
Completion rate
91.9%
Average risk score
29.7
Low risk on average, out of 100
Flagged as unusual
33
6.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 476 | ₱12.1B | 29.8 | 33 | 97.6% |
| Region VII | 16 | ₱54.7M | 26.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 199 | ₱4.9B | 24.9 | 1 | 100.0% |
| Buildings and Facilities | 123 | ₱610.5M | 15.2 | 0 | 100.0% |
| Flood Control and Drainage | 78 | ₱3.2B | 29.9 | 0 | 99.6% |
| OTHER | 23 | ₱1.4B | 78.3 | 12 | 90.2% |
| Bridges | 23 | ₱527.3M | 30.3 | 0 | 100.0% |
| Water Provision and Storage | 17 | ₱84.3M | 18.0 | 0 | 100.0% |
| GAA 2025 SSP | 14 | ₱418.2M | 92.7 | 13 | 63.3% |
| GAA 2025 OO-2 | 11 | ₱712.6M | 88.9 | 4 | 75.6% |
| GAA 2025 OO-1 | 4 | ₱303.7M | 91.1 | 3 | 75.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MC0044CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER, PACKAGE 2, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱112.2M | 53% | High risk95 | Flagged0.038 |
| 25MD0050ROAD WIDENING - DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT), VILLARICA, MIDSAYAP, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱84.2M | 23% | High risk94 | Flagged0.029 |
| 25MD0029MIDSAYAP - LIBUNGAN BYPASS ROAD, COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱140.4M | 88% | High risk94 | Flagged0.019 |
| 25MC0046CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER, PACKAGE 4, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱31.5M | 91% | High risk94 | Flagged0.015 |
| 25MC0071CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ILOMAVIS, KIDAPAWAN CITY | Region XII | Cotabato 2nd DEO | On-Going | ₱4.8M | 99% | High risk93 | Flagged0.011 |
| 25MC0080CONSTRUCTION OF ROAD, BARANGAY LUVIMIN, KIDAPAWAN CITY | Region XII | Cotabato 2nd DEO | On-Going | ₱9.6M | 18% | High risk93 | Flagged0.039 |
| 25MD0049CONSTRUCTION OF FLOOD CONTROL STRUCTURE, LIBUNGAN RIVER, CAMANSI BRIDGE (UPSTREAM, DOWNSTREAM AND BOTH SIDES), CAMANSI, ALAMADA, COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱93.6M | 43% | High risk93 | Flagged0.006 |
| 25MC0042CONSTRUCTION OF ROAD - BENOLIGAN - ONICA - DALAPITAN ROAD, KIDAPAWAN CITY AND MATALAM, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱28.5M | 92% | High risk93 | Flagged0.017 |
| 25MD0038CONSTRUCTION OF BALOGO RIVER FLOOD CONTROL STRUCTURE, ANICK SECTION, BARANGAY ANICK, PIGCAWAYAN, COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱94.4M | 94% | High risk93 | —-0.006 |
| 25MD0034CONSTRUCTION OF BRIDGE APPROACHES AT RARADANGAN TO MACABASA, ALAMADA, NORTH COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱56.1M | 100% | High risk93 | —-0.020 |
| 25MD0039CONSTRUCTION OF BRIDGE APPROACHES CONNECTING CAMANSI AND BARANGAY PACAO, ALAMADA, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱56.1M | 36% | High risk93 | Flagged0.032 |
| 25MD0061CONSTRUCTION OF BRIDGE APPROACHES AT POLAYAGAN TO MAPUROK, ALAMADA, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱56.1M | 22% | High risk93 | Flagged0.038 |
| 25MD0031CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BALOGO RIVER, UPSTREAM OF BALOGO BRIDGE, BARANGAY BALOGO, PIGCAWAYAN, COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱94.7M | 87% | High risk93 | —-0.004 |
| 25MC0082CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) PHASE 1, BARANGAY SAGUING, MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱5.8M | 9% | High risk93 | Flagged0.043 |
| 25MC0091CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY DAGUPAN, MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱4.8M | 31% | High risk92 | Flagged0.034 |
| 25MC0040CONSTRUCTION OF CONCRETE ROAD - BINOLIGAN - AMAZION, KIDAPAWAN CITY, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱38M | 77% | High risk92 | Flagged0.024 |
| 25MC0013RECONSTRUCTION TO CONCRETE PAVEMENT ALONG PACO - ROXAS - ARAKAN VALLEY - JCT DAVAO - BUKIDNON RD - K1659 + 667 - K1660 + 263, K1660 + 286 - K1661 + 134, ANTIPAS, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱26.5M | 90% | High risk92 | Flagged0.002 |
| 25MC0068CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY INDANGAN, KIDAPAWAN CITY | Region XII | Cotabato 2nd DEO | On-Going | ₱4.8M | 92% | High risk92 | Flagged0.015 |
| 25MD0065CONSTRUCTION OF LIBUNGAN RIVER FLOOD CONTROL PROJECT (UPSTREAM AND DOWNSTREAM OF MAPUROK BRIDGE - POLAYAGAN SECTION), POLAYAGAN, ALAMADA, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱74.9M | 42% | High risk92 | Flagged0.003 |
| 25MD0046INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (PAVEMENT MARKINGS, ROAD SIGNS, GUARDRAILS) ALONG MIDSAYAP-MAKAR RD, MIDSAYAP, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱4.9M | 95% | High risk91 | Flagged0.012 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MC0102CONSTRUCTION OF SCHOOL BUILDING (ONE (1) STOREY THREE (3) CLASSROOM), AT ASUNCION ELEMENTARY SCHOOL, BARANGAY POBLACION, MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱7.2M | 52% | High risk87 | Flagged0.058 |
| 25MC0104CONSTRUCTION OF SCHOOL BUILDING (ONE (1) STOREY TWO (2) CLASSROOM), AT NEW CEBU ELEMENTARY SCHOOL, BARANGAY NEW CEBU MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱4.8M | 45% | High risk81 | Flagged0.057 |
| 25MC0103CONSTRUCTION OF SCHOOL BUILDING (ONE (1) STOREY THREE (3) CLASSROOM), AT STO. NIÑO ELEMENTARY SCHOOL, BARANGAY STO. NIÑO MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱7.2M | 78% | High risk87 | Flagged0.051 |
| 17MC0193REHABILITATION OF MALABUAN-BATO-MALUNGON-LACOBE FMR, MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Terminated | ₱63.8M | 100% | Medium risk52 | Flagged0.046 |
| 25MC0082CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) PHASE 1, BARANGAY SAGUING, MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱5.8M | 9% | High risk93 | Flagged0.043 |
| 25MC0080CONSTRUCTION OF ROAD, BARANGAY LUVIMIN, KIDAPAWAN CITY | Region XII | Cotabato 2nd DEO | On-Going | ₱9.6M | 18% | High risk93 | Flagged0.039 |
| 25MC0044CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER, PACKAGE 2, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱112.2M | 53% | High risk95 | Flagged0.038 |
| 25MD0061CONSTRUCTION OF BRIDGE APPROACHES AT POLAYAGAN TO MAPUROK, ALAMADA, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱56.1M | 22% | High risk93 | Flagged0.038 |
| 25MC0091CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY DAGUPAN, MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱4.8M | 31% | High risk92 | Flagged0.034 |
| 25MD0039CONSTRUCTION OF BRIDGE APPROACHES CONNECTING CAMANSI AND BARANGAY PACAO, ALAMADA, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱56.1M | 36% | High risk93 | Flagged0.032 |
| 25MD0050ROAD WIDENING - DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT), VILLARICA, MIDSAYAP, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱84.2M | 23% | High risk94 | Flagged0.029 |
| 25MC0040CONSTRUCTION OF CONCRETE ROAD - BINOLIGAN - AMAZION, KIDAPAWAN CITY, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱38M | 77% | High risk92 | Flagged0.024 |
| 25MD0056CONSTRUCTION OF RETAINING WALL ALONG KITAO CREEK, CENTRAL KATINGAWAN, MIDSAYAP, COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱4.9M | 71% | High risk91 | Flagged0.022 |
| 25MD0029MIDSAYAP - LIBUNGAN BYPASS ROAD, COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱140.4M | 88% | High risk94 | Flagged0.019 |
| 25MC0042CONSTRUCTION OF ROAD - BENOLIGAN - ONICA - DALAPITAN ROAD, KIDAPAWAN CITY AND MATALAM, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱28.5M | 92% | High risk93 | Flagged0.017 |
| 25MC0046CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER, PACKAGE 4, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱31.5M | 91% | High risk94 | Flagged0.015 |
| 25MC0068CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY INDANGAN, KIDAPAWAN CITY | Region XII | Cotabato 2nd DEO | On-Going | ₱4.8M | 92% | High risk92 | Flagged0.015 |
| 16MD0110CONST. OF SINAPANGAN-KALUNGKUNGAN FMR, SINPAPANGAN, LIBUNGAN, COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱24.3M | 100% | High risk83 | Flagged0.013 |
| 25MD0059JCT. DAVAO - COTABATO (CROSSING BAGUER) - SITIO DALUMANGKOM - SITIO LAMPAKI ROAD, PIGKAWAYAN, NORTH COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱65.5M | 58% | High risk78 | Flagged0.013 |
| 24MD0049MIDSAYAP - LIBUNGAN BYPASS ROAD, COTABATO | Region XII | Cotabato 1st DEO | On-Going | ₱106.1M | 92% | High risk81 | Flagged0.013 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 20MC0006ROAD WIDENING -ON SPECIFIC LOCATIONS ALONG PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD (S00701MN) K1630+524 TO K1634+212, PRES. ROXAS, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱81.1M | 100% | Medium risk34 | —-0.079 |
| 102 | 21MD0068CONSTRUCTION OF CONCRETE ROAD ALONG SITIO LAMPAKI-CAMPO 3 AGRI-TOURIST ROAD PASSING THROUGH LAMPAKI 7 FALLS, BRGY. KIMARAYAG, PIGCAWAYAN, NORTH COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱70.1M | 100% | Medium risk33 | —-0.084 |
| 103 | 22MH0022CONSTRUCTION OF RIVER BANK PROTECTION AT BRGY. BARANAYAN, PALIMBANG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱67.6M | 100% | Medium risk33 | —-0.066 |
| 104 | 24MD0031JCT. MIMBALAWAG-BAROWIN-BASAQUE ROAD IN SUPPORT OF BANANA, COFFEE AND HIGHLAND VEGETABLE PRODUCTION AND MARKETING, ALAMADA, NORTH COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱76.8M | 100% | Medium risk33 | —-0.082 |
| 105 | 22MC0091REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - MAGPET-NOWA-DOROLUMAN-GREENFIELD RD - K1657 + 880-K1658+260, ARAKAN, NORTH COTABATO (RE-PUBLISHED) | Region XII | Cotabato 2nd DEO | Completed | ₱69.5M | 100% | Medium risk33 | —-0.079 |
| 106 | 24MD0052LIBUNGAN RIVER FLOOD CONTROL PROJECT (PUROK 3 SECTION), NALIN, MIDSAYAP, COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱57.9M | 100% | Medium risk32 | —-0.072 |
| 107 | 24MD0051LIBUNGAN RIVER FLOOD CONTROL PROJECT (ABAGA SECTION-PHASE VIII), ABAGA, LIBUNGAN, COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱57.9M | 100% | Medium risk32 | —-0.075 |
| 108 | 20MD0006ROAD WIDENING ALONG MIDSAYAP-MAKAR ROAD, BRGY. POBLACION, MIDSAYAP, NORTH COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱66.2M | 100% | Medium risk32 | —-0.084 |
| 109 | 21MD0025LIBUNGAN FLOOD CONTROL (GUMAGA SECTION-PHASE II) ALONG LIBUNGAN RIVER, GUMAGA, LIBUNGAN, COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱55.5M | 100% | Medium risk32 | —-0.074 |
| 110 | 20MC0004ROAD WIDENING ALONG DAVAO-COTABATO RD (JCT. DIGOS-COTABATO SECT) K1624+702-K1626+684, KIDAPAWAN CITY, COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱63.7M | 100% | Medium risk32 | —-0.083 |
| 111 | 19MD0130CONSTRUCTION OF CONCRETE BRIDGE LINDONGAN FLAT SLAB BRIDGE ALONG DAVAO-COTABATO RD., LINDONGAN, ALEOSAN, COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱68.6M | 100% | Medium risk32 | —-0.051 |
| 112 | 22MD0079CONSTRUCTION OF CONCRETE ROAD, PACAO-KILOYAO-SINAPANGAN ROAD, ALAMADA-LIBUNGAN, NORTH COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱65.6M | 100% | Medium risk32 | —-0.086 |
| 113 | 20MD0016ROAD WIDENING ALONG DUALING-NEW PANAY-MIDSAYAP ROAD, STA. CRUZ, ALEOSAN, NORTH COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱56.9M | 100% | Medium risk31 | —-0.087 |
| 114 | 22MD0085CONSTRUCTION OF BRIDGE CONNECTING BRGY. CAMANSI TO BRGY. PACAO, ALAMADA, NORTH COTABATO | Region XII | Region XII | Completed | ₱86.8M | 100% | Medium risk31 | —-0.044 |
| 115 | 24MC0033CONSTRUCTION OF FLOOD CONTROL DIKE ALONG BULATUKAN RIVER STA. 63+370 - STA. 63+710 R/S, BARANGAY NEW BULATUKAN, MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱48.8M | 99% | Low risk30 | —-0.029 |
| 116 | 24MC0032CONSTRUCTION OF FLOOD CONTROL DIKE ALONG BULATUKAN RIVER STA. 63+370 - STA. 63+710 L/S, BARANGAY KISANTE, MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱48.8M | 100% | Low risk30 | —-0.071 |
| 117 | 22MC0084ROAD WIDENING - KIDAPAWAN-MAGPET-PANGAOAN RD - K1619 + (-554) - K1620 + 000, KIDAPAWAN CITY | Region XII | Cotabato 2nd DEO | Completed | ₱53.5M | 100% | Low risk30 | —-0.076 |
| 118 | 25MD0055CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SALUNAYAN, MIDSAYAP, NORTH COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱4.9M | 100% | Low risk29 | —-0.089 |
| 119 | 24MC0034CONSTRUCTION OF FLOOD CONTROL DIKE ALONG BULATUKAN RIVER, STA. 61+930 - STA. 62+270 R/S, BARANGAY NEW BULATUKAN, MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱48.8M | 100% | Low risk29 | —-0.071 |
| 120 | 24MC0035CONSTRUCTION OF FLOOD CONTROL DIKE ALONG BULATUKAN RIVER, STA. 62+270 - STA. 62+610 R/S, BARANGAY NEW BULATUKAN, MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱48.8M | 100% | Low risk29 | —-0.071 |
| 121 | 20MD0042REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG BANISILAN-GUILING-ALAMADA-LIBUNGAN ROAD, ALAMADA, NORTH COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱52.3M | 100% | Low risk29 | —-0.088 |
| 122 | 22MD0019CONSTRUCTION OF MULTI PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, LIBUNGAN, NORTH COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱4.9M | 100% | Low risk29 | —-0.089 |
| 123 | 22M00017CONSTRUCTION OF ROAD, SAN VICENTE NEW CARIDAD LA ESPERANZA BULAKANON ROAD, STA. 0+000 - STA. 2+434, MAKILALA AND TULUNAN, NORTH COTABATO | Region XII | Region XII | Completed | ₱47.8M | 100% | Low risk29 | —-0.077 |
| 124 | 24MD0021CONSTRUCTION OF CONCRETE ROAD - JCT. DULAO -RICOR - NEW LEON - PATAG, DADO ROAD IN SUPPORT OF BANANA, COFFEE AND HIGHLAND VEGETABLE PRODUCTION AND MARKETING, ALAMADA, NORTH COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱49M | 100% | Low risk29 | —-0.089 |
| 125 | 24MC0052CONSTRUCTION OF REVETMENT ALONG MALASILA RIVER, STA. 41+533 - STA. 42 + 333 R/S, BARANGAY STA. FILOMINA, MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱48.8M | 100% | Low risk29 | —-0.072 |