Contractor dossier
253 projects on file, including joint ventures this contractor is part of.
Total projects
253
Total budget
₱6.6B
Average progress
98.1%
Completion rate
89.7%
Average risk score
45.5
Medium risk on average, out of 100
Flagged as unusual
14
5.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IX | 246 | ₱6.4B | 45.9 | 13 | 98.1% |
| Region X | 5 | ₱70.7M | 26.6 | 1 | 95.2% |
| Negros Island Region | 2 | ₱74.5M | 45.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 112 | ₱1.5B | 34.7 | 5 | 99.9% |
| Roads | 63 | ₱1.4B | 49.9 | 0 | 100.0% |
| Flood Control and Drainage | 33 | ₱2.3B | 61.1 | 1 | 94.3% |
| Bridges | 22 | ₱772.1M | 52.7 | 3 | 94.7% |
| Water Provision and Storage | 13 | ₱77.3M | 36.5 | 0 | 100.0% |
| OTHER | 7 | ₱231.2M | 78.8 | 3 | 81.4% |
| GAA 2025 SSP | 3 | ₱246.1M | 94.3 | 2 | 85.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25J00104ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD, BARANGAY BALAKAN-BARANGAY CALUCAP ROAD, SALUG, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱153M | 79% | High risk96 | Flagged0.032 |
| 25KA0035INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG JCT SH AGLAYAN-ZAMBOANGUITA RD - K1518 + 000 - K1536 + 000BRGY. AGLAYAN, MALAYBALAY CITY - BRGY. LAMBAGAN, CABANGLASAN, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱64.2M | 76% | High risk95 | Flagged0.011 |
| 25JF0022CONSTRUCTION OF RIVER WALL, BRGY. CAMANGA, SIAY, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱28.9M | 100% | High risk92 | —-0.018 |
| 24JA0160CONSTRUCTION OF DRAINAGE STRUCTURE AT LUSTRE ROAD (SANTA CATALINA-ZONE IV) PACKAGE 1 ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱38.6M | 70% | High risk88 | Flagged0.061 |
| 17JA0049: CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS, PAGADIAN-ZAMBOANGA CITY ROAD, K1933+000 TO K1934+200 | Region IX | Zamboanga City 2nd DEO | Terminated | ₱10.2M | 100% | High risk78 | Flagged0.014 |
| 23JA0070CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS- WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM IN BRGY. SINUNUC, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱9.8M | 100% | High risk78 | —-0.023 |
| 24JJ0003PAVING OF UNPAVED ROADS - SECONDARY ROADS, LILOY- SIOCON RD- K2048 + 196.10 - K2049 + 500 | Region IX | Zamboanga del Norte 4th DEO | On-Going | ₱38.9M | 0% | High risk78 | Flagged0.036 |
| 22JF0054CONSTRUCTION OF CAUSEWAY APPROACH-PHASE IV OF THE KALIANTANA BRIDGE, NAGA, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱48.7M | 100% | High risk77 | —-0.030 |
| 16JB0069CONSTRUCTION/EXTENSION OF FLOOD CONTROL STRUCTURE ALONG DOHINOB RIVER, ROXAS, ZAMBOANGA DEL NORTE 2ND LD. | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱38.4M | 100% | High risk76 | —-0.023 |
| 17JG0024ROAD UPGRADING (UNPAVED TO PAVED) ALONG IMELDA-BAYOG-KUMALARANG-LAPUYAN-MARGOSATUBIG ROAD (PANG-PANG SECTION) (S01184MN) CHAINAGE 14556 - CHAINAGE 16256, PANG-PANG SECTION, LAPUYAN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱46.5M | 100% | High risk76 | —-0.011 |
| 24J00156CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PULIRAN RIVER, PULIRAN BR. SECTION PACKAGE 1, SIBUCO, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱162.3M | 96% | High risk76 | —-0.012 |
| 24J00157CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PULIRAN RIVER, PULIRAN BR. SECTION PACKAGE 2, SIBUCO, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱164M | 98% | High risk76 | —-0.014 |
| 24J00034CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER (DOWNSTREAM), SIOCON, ZAMBOANGA DEL NORTE, PACKAGE 2 | Region IX | Region IX | On-Going | ₱137.9M | 100% | High risk74 | —-0.019 |
| 24J00020CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DIPOLOG RIVER, (SIANIB SECTION), POLANCO ZAMBOANGA DEL NORTE | Region IX | Region IX | Completed | ₱149.6M | 100% | High risk74 | —-0.054 |
| 25J00010CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG DIPOLOG RIVER, POBLACION NORTH SECTION, BARANGAY POBLACION NORTH, POLANCO, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱153.7M | 95% | High risk74 | —-0.021 |
| 25J00009CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAYAWAN RIVER, DAPDAP BRIDGE UPSTREAM, POLANCO, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱153.7M | 96% | High risk74 | —-0.021 |
| 24J00019CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DIPOLOG RIVER, (CONACON-GUINLES SECTION), POLANCO ZAMBOANGA DEL NORTE | Region IX | Region IX | Completed | ₱149.6M | 100% | High risk74 | —-0.054 |
| 22JF0026CONSTRUCTION OF RIVER WALL, BARANGAY BALAGON, SIAY, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱96M | 100% | High risk73 | —-0.064 |
| 24J00032CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SALUG RIVER AT SALUG BR. SECTION (B00528MN) ALONG SINDANGAN-LILOY ROAD (S01142MN), SALUG, ZAMBOANGA DEL NORTE, PACKAGE 1 | Region IX | Region IX | On-Going | ₱128.8M | 97% | High risk73 | —-0.016 |
| 24JD0045CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KIPIT RIVER, GUTALAC, ZAMBOANGA DEL NORTE (UPSTREAM) STA. 0 + 204 - 0 + 604 | Region IX | Zamboanga del Norte 3rd DEO | On-Going | ₱95.5M | 100% | High risk73 | —-0.029 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24JA0160CONSTRUCTION OF DRAINAGE STRUCTURE AT LUSTRE ROAD (SANTA CATALINA-ZONE IV) PACKAGE 1 ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱38.6M | 70% | High risk88 | Flagged0.061 |
| 24JA0159RECONSTRUCTION /REHABILITATION OF DRAINAGE STRUCTURE AT BARANGAY KASANYANGAN, ZAMBOANGA CITY PACKAGE 1 | Region IX | Zamboanga City 2nd DEO | On-Going | ₱38.6M | 0% | High risk64 | Flagged0.043 |
| 20JA0009WIDENING OF PERMANENT BRIDGES - TALISAYAN BR. (B01160MN) ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA RD | Region IX | Zamboanga City 2nd DEO | On-Going | ₱19.7M | 0% | Medium risk58 | Flagged0.039 |
| 24JJ0003PAVING OF UNPAVED ROADS - SECONDARY ROADS, LILOY- SIOCON RD- K2048 + 196.10 - K2049 + 500 | Region IX | Zamboanga del Norte 4th DEO | On-Going | ₱38.9M | 0% | High risk78 | Flagged0.036 |
| 25J00104ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD, BARANGAY BALAKAN-BARANGAY CALUCAP ROAD, SALUG, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱153M | 79% | High risk96 | Flagged0.032 |
| 18JE0244CONSTRUCTION OF CONCRETE BRIDGE, DIPOLO RIVER-GUINTANANAN, BRGY., GUINTANANAN, DUMINGAG, ZAMBOANGA DEL SUR. | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱58.8M | 100% | Medium risk56 | Flagged0.014 |
| 17JA0049: CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS, PAGADIAN-ZAMBOANGA CITY ROAD, K1933+000 TO K1934+200 | Region IX | Zamboanga City 2nd DEO | Terminated | ₱10.2M | 100% | High risk78 | Flagged0.014 |
| 25KA0035INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG JCT SH AGLAYAN-ZAMBOANGUITA RD - K1518 + 000 - K1536 + 000BRGY. AGLAYAN, MALAYBALAY CITY - BRGY. LAMBAGAN, CABANGLASAN, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱64.2M | 76% | High risk95 | Flagged0.011 |
| 23JA0103CONSTRUCTION OF FOUR (4) STOREY TWELVE (12) CLASSROOM SCHOOL BUILDING, DON GREGORIO EVANGELISTA MEMORIAL SCHOOL, ZAMBOANGA CITY, ZAMBOANGA DEL SUR | Region IX | Zamboanga City 2nd DEO | On-Going | ₱36.6M | 100% | Medium risk53 | Flagged0.009 |
| 17JA0140CONSTRUCTION OF FOUR (4) STOREY TWELVE (12) CLASSROOM SCHOOL BUILDING AT SINUNUC NATIONAL HIGH SCHOOL, ZMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱32M | 100% | Medium risk41 | Flagged0.009 |
| 17JA0153CONSTRUCTION OF THREE (3) STOREY FIFTEEN (15) CLASSROOM SCHOOL BUILDING AT CULIANAN LEARNING CENTER E-IMPACT | Region IX | Zamboanga City 2nd DEO | Completed | ₱33.8M | 100% | Medium risk42 | Flagged0.003 |
| 16JA0129CONSTRUCTION OF FOUR (4) STOREY SIXTEEN (16) CLASSROOM SCHOOL BUILDING AT RAMON ENRIQUEZ HIGH SCHOOL BRGY. LABUAN, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱27.5M | 100% | Medium risk42 | Flagged0.002 |
| 17JA0144CONSTRUCTION OF FOUR (4) STOREY TWELVE (12) CLASSROOM SCHOOL BUILDING AT REGIONAL SCIENCE HIGH SCHOOL, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱31.3M | 100% | Medium risk42 | Flagged0.001 |
| 22JB0007WIDENING OF BRIDGE - TAMILOCAN BRIDGE (B01194MN) ALONG DIPOLOG-OROQUIETA NATIONAL ROAD. | Region IX | Zamboanga del Norte 2nd DEO | On-Going | ₱49.5M | 82% | Medium risk58 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 21JC0023PAVING OF UNPAVED ROADS - SECONDARY ROADS, SIOCON-SIRAWAI-SIBUCO-LIMPAPA RD - (S01165MN) CHAINAGE 15775 - CHAINAGE 17000, (S01165MN) CHAINAGE 8183 - CHAINAGE 9380, (S01165MN) CHAINAGE 9995 - CHAINAGE 10460, ZN. | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱83.6M | 100% | High risk63 | —-0.073 |
| 27 | 23JJ0046CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG SIOCON-SIRAWAI-SIBUCO-LIMPAPA RD (S01165MN), CHAINAGE 2575- CHAINAGE 2700 | Region IX | Zamboanga del Norte 4th DEO | Completed | ₱67.6M | 100% | High risk63 | —-0.017 |
| 28 | 21JF0013CONSTRUCTION OF RIVER WALL ALONG SIBUGUEY RIVER, BRGY. MINSULAO TO BRGY. PARUK, SIAY, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱86.4M | 100% | High risk62 | —-0.065 |
| 29 | 20JC0006ROAD UPGRADING AND ROAD WIDENING (2-LANE ASPHALT TO 4-LANE CONCRETE) ALONG SINDANGAN - LILOY ROAD, K1930+(-892) - K1930+781, LEON B. POSTIGO , ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱78.6M | 100% | High risk62 | —-0.077 |
| 30 | 21JC0026CONSTRUCTION OF NEW BRIDGES, LINGAYON BR. ALONG ZAMBOANGA WEST COASTAL RD (LIMPAPA-SIBUCO SECT), ZN. | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱57.9M | 100% | High risk61 | —-0.048 |
| 31 | 22JC0021CONSTRUCTION OF NEW BRIDGES, LINGAYON BR. ALONG ZAMBOANGA WEST COASTAL RD (LIMPAPA - SIBUCO SECT), ZN. | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱57.9M | 100% | High risk61 | —-0.049 |
| 32 | 22JC0005CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LABASON BYPASS ROAD, (LABASON BR. 2), ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱62.7M | 100% | High risk61 | —-0.041 |
| 33 | 23JI0012CONSTRUCTION OF FLOOD CONTROL STRUCTURE (REVETMENT WALL) ALONG SIBUGUEY RIVER (UPSTREAM), BARANGAY SAMPOLI A, DIPLAHAN, ZAMBOANGA SIBUGAY (PACKAGE 1) | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱57.8M | 100% | High risk61 | —-0.072 |
| 34 | 22JC0039ROAD WIDENING - PRIMARY ROADS, SINDANGAN - LILOY RD - K1948 + 738 - K1951 + 000, ZN. | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱64M | 100% | High risk61 | —-0.080 |
| 35 | 17JF0026ROAD CONCRETING OF BRGY. LINGUISAN, TUNGAWAN, Z.S | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱19.3M | 100% | High risk60 | —-0.001 |
| 36 | 24JF0011CONSTRUCTION OF RIVERWALL ALONG THE SIBUGUEY RIVER, BARANGAY MINSULAO TO BARANGAY PARUK (PHASE II), SIAY, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱58.6M | 100% | High risk60 | —-0.073 |
| 37 | 24JJ0020REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS, SIOCON-SIRAWAI-SIBUCO-LIMPAPA RD - K2104 + 831 - K2104 + 906, K2105 + 393 - K2105 + 447 | Region IX | Zamboanga del Norte 4th DEO | Completed | ₱49M | 100% | Medium risk59 | —-0.074 |
| 38 | 23JJ0022CONSTRUCTION OF NEW BRIDGES -LINGAYON BR. ALONG ZAMBOANGA WEST COASTAL ROAD (LIMPAPA-SIBUCO SECT) (PHASE III) | Region IX | Zamboanga del Norte 4th DEO | Completed | ₱54M | 100% | Medium risk59 | —-0.048 |
| 39 | 23JD0035WIDENING OF PERMANENT BRIDGES, GATAS BR. (B00535MN) ALONG LILOY-IPIL RD, KALAWIT, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱56M | 100% | Medium risk59 | —-0.050 |
| 40 | 22JB0007WIDENING OF BRIDGE - TAMILOCAN BRIDGE (B01194MN) ALONG DIPOLOG-OROQUIETA NATIONAL ROAD. | Region IX | Zamboanga del Norte 2nd DEO | On-Going | ₱49.5M | 82% | Medium risk58 | Flagged0.000 |
| 41 | 22JC0060PAVING OF UNPAVED ROADS - SECONDARY ROADS, ZAMBOANGA WEST COASTAL ROAD (LIMPAPA - SIBUCO SECTION) S01148MN CHAINAGE 6663-CHAINAGE 6788.60, CHAINAGE 11580 - CHAINAGE 12041.66, AND CHAINAGE 12840 - CHAINAGE 13067.81 , ZN. | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱20.6M | 100% | Medium risk58 | —-0.080 |
| 42 | 22JI0023CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - NRJ LANAO-PAGADIAN-ZAMBOANGA CITY RD TO BAWANG PROVINCIAL ROAD LEADING TOSILUPA BEACH, BRGY. BAWANG, BUUG, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱49M | 100% | Medium risk58 | —-0.084 |
| 43 | 20JA0009WIDENING OF PERMANENT BRIDGES - TALISAYAN BR. (B01160MN) ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA RD | Region IX | Zamboanga City 2nd DEO | On-Going | ₱19.7M | 0% | Medium risk58 | Flagged0.039 |
| 44 | 25JF0021CONSTRUCTION OF RIVER WALL, BRGY. BALAGON, SIAY, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | On-Going | ₱52.9M | 100% | Medium risk58 | —-0.043 |
| 45 | 22JC0041ROAD WIDENING - SECONDARY ROADS, LILOY - SIOCON RD - K 1968 + 456 - K1970+000, ZN. | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱53.1M | 100% | Medium risk57 | —-0.075 |
| 46 | 20JB0010CONSTRUCTION / IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM NRJ LEADING TO MORIAS FALLS, BRGY. MIATAN, KATIPUNAN, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱47.5M | 100% | Medium risk57 | —-0.071 |
| 47 | 22JF0004WIDENING OF PERMANENT BRIDGES BAGA BR. (B00495MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY RD. ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱55.1M | 100% | Medium risk57 | —-0.053 |
| 48 | 17JB0009COMPLETION/IMPROVEMENT OF SINDANGAN CULTURAL AND SPORTS CENTER, SINDANGAN, ZAMBOANGA DEL NORTE. | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱4.8M | 100% | Medium risk56 | —-0.060 |
| 49 | 23JC0045REHABILITATION/MAJOR REPAIR OF MULTI-PURPOSE BUILDING -REHABILITATION OF MULTI-PURPOSE BUILDING (MUNICIPAL BUS TERMINAL), SINDANGAN, ZAMBOANGA DEL NORTE. | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱52.5M | 100% | Medium risk56 | —-0.065 |
| 50 | 20JF0038COMPLETION OF CAUSEWAY APPROACH - PHASE III OF THE KALIANTANA BRIDGE, NAGA, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱49M | 100% | Medium risk56 | —-0.083 |