Contractor dossier
253 projects on file, including joint ventures this contractor is part of.
Total projects
253
Total budget
₱6.6B
Average progress
98.1%
Completion rate
89.7%
Average risk score
45.5
Medium risk on average, out of 100
Flagged as unusual
14
5.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IX | 246 | ₱6.4B | 45.9 | 13 | 98.1% |
| Region X | 5 | ₱70.7M | 26.6 | 1 | 95.2% |
| Negros Island Region | 2 | ₱74.5M | 45.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 112 | ₱1.5B | 34.7 | 5 | 99.9% |
| Roads | 63 | ₱1.4B | 49.9 | 0 | 100.0% |
| Flood Control and Drainage | 33 | ₱2.3B | 61.1 | 1 | 94.3% |
| Bridges | 22 | ₱772.1M | 52.7 | 3 | 94.7% |
| Water Provision and Storage | 13 | ₱77.3M | 36.5 | 0 | 100.0% |
| OTHER | 7 | ₱231.2M | 78.8 | 3 | 81.4% |
| GAA 2025 SSP | 3 | ₱246.1M | 94.3 | 2 | 85.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25J00104ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD, BARANGAY BALAKAN-BARANGAY CALUCAP ROAD, SALUG, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱153M | 79% | High risk96 | Flagged0.032 |
| 25KA0035INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG JCT SH AGLAYAN-ZAMBOANGUITA RD - K1518 + 000 - K1536 + 000BRGY. AGLAYAN, MALAYBALAY CITY - BRGY. LAMBAGAN, CABANGLASAN, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱64.2M | 76% | High risk95 | Flagged0.011 |
| 25JF0022CONSTRUCTION OF RIVER WALL, BRGY. CAMANGA, SIAY, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱28.9M | 100% | High risk92 | —-0.018 |
| 24JA0160CONSTRUCTION OF DRAINAGE STRUCTURE AT LUSTRE ROAD (SANTA CATALINA-ZONE IV) PACKAGE 1 ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱38.6M | 70% | High risk88 | Flagged0.061 |
| 17JA0049: CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS, PAGADIAN-ZAMBOANGA CITY ROAD, K1933+000 TO K1934+200 | Region IX | Zamboanga City 2nd DEO | Terminated | ₱10.2M | 100% | High risk78 | Flagged0.014 |
| 23JA0070CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS- WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM IN BRGY. SINUNUC, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱9.8M | 100% | High risk78 | —-0.023 |
| 24JJ0003PAVING OF UNPAVED ROADS - SECONDARY ROADS, LILOY- SIOCON RD- K2048 + 196.10 - K2049 + 500 | Region IX | Zamboanga del Norte 4th DEO | On-Going | ₱38.9M | 0% | High risk78 | Flagged0.036 |
| 22JF0054CONSTRUCTION OF CAUSEWAY APPROACH-PHASE IV OF THE KALIANTANA BRIDGE, NAGA, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱48.7M | 100% | High risk77 | —-0.030 |
| 16JB0069CONSTRUCTION/EXTENSION OF FLOOD CONTROL STRUCTURE ALONG DOHINOB RIVER, ROXAS, ZAMBOANGA DEL NORTE 2ND LD. | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱38.4M | 100% | High risk76 | —-0.023 |
| 17JG0024ROAD UPGRADING (UNPAVED TO PAVED) ALONG IMELDA-BAYOG-KUMALARANG-LAPUYAN-MARGOSATUBIG ROAD (PANG-PANG SECTION) (S01184MN) CHAINAGE 14556 - CHAINAGE 16256, PANG-PANG SECTION, LAPUYAN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱46.5M | 100% | High risk76 | —-0.011 |
| 24J00156CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PULIRAN RIVER, PULIRAN BR. SECTION PACKAGE 1, SIBUCO, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱162.3M | 96% | High risk76 | —-0.012 |
| 24J00157CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PULIRAN RIVER, PULIRAN BR. SECTION PACKAGE 2, SIBUCO, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱164M | 98% | High risk76 | —-0.014 |
| 24J00034CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER (DOWNSTREAM), SIOCON, ZAMBOANGA DEL NORTE, PACKAGE 2 | Region IX | Region IX | On-Going | ₱137.9M | 100% | High risk74 | —-0.019 |
| 24J00020CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DIPOLOG RIVER, (SIANIB SECTION), POLANCO ZAMBOANGA DEL NORTE | Region IX | Region IX | Completed | ₱149.6M | 100% | High risk74 | —-0.054 |
| 25J00010CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG DIPOLOG RIVER, POBLACION NORTH SECTION, BARANGAY POBLACION NORTH, POLANCO, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱153.7M | 95% | High risk74 | —-0.021 |
| 25J00009CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAYAWAN RIVER, DAPDAP BRIDGE UPSTREAM, POLANCO, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱153.7M | 96% | High risk74 | —-0.021 |
| 24J00019CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DIPOLOG RIVER, (CONACON-GUINLES SECTION), POLANCO ZAMBOANGA DEL NORTE | Region IX | Region IX | Completed | ₱149.6M | 100% | High risk74 | —-0.054 |
| 22JF0026CONSTRUCTION OF RIVER WALL, BARANGAY BALAGON, SIAY, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱96M | 100% | High risk73 | —-0.064 |
| 24J00032CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SALUG RIVER AT SALUG BR. SECTION (B00528MN) ALONG SINDANGAN-LILOY ROAD (S01142MN), SALUG, ZAMBOANGA DEL NORTE, PACKAGE 1 | Region IX | Region IX | On-Going | ₱128.8M | 97% | High risk73 | —-0.016 |
| 24JD0045CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KIPIT RIVER, GUTALAC, ZAMBOANGA DEL NORTE (UPSTREAM) STA. 0 + 204 - 0 + 604 | Region IX | Zamboanga del Norte 3rd DEO | On-Going | ₱95.5M | 100% | High risk73 | —-0.029 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24JA0160CONSTRUCTION OF DRAINAGE STRUCTURE AT LUSTRE ROAD (SANTA CATALINA-ZONE IV) PACKAGE 1 ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱38.6M | 70% | High risk88 | Flagged0.061 |
| 24JA0159RECONSTRUCTION /REHABILITATION OF DRAINAGE STRUCTURE AT BARANGAY KASANYANGAN, ZAMBOANGA CITY PACKAGE 1 | Region IX | Zamboanga City 2nd DEO | On-Going | ₱38.6M | 0% | High risk64 | Flagged0.043 |
| 20JA0009WIDENING OF PERMANENT BRIDGES - TALISAYAN BR. (B01160MN) ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA RD | Region IX | Zamboanga City 2nd DEO | On-Going | ₱19.7M | 0% | Medium risk58 | Flagged0.039 |
| 24JJ0003PAVING OF UNPAVED ROADS - SECONDARY ROADS, LILOY- SIOCON RD- K2048 + 196.10 - K2049 + 500 | Region IX | Zamboanga del Norte 4th DEO | On-Going | ₱38.9M | 0% | High risk78 | Flagged0.036 |
| 25J00104ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD, BARANGAY BALAKAN-BARANGAY CALUCAP ROAD, SALUG, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱153M | 79% | High risk96 | Flagged0.032 |
| 18JE0244CONSTRUCTION OF CONCRETE BRIDGE, DIPOLO RIVER-GUINTANANAN, BRGY., GUINTANANAN, DUMINGAG, ZAMBOANGA DEL SUR. | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱58.8M | 100% | Medium risk56 | Flagged0.014 |
| 17JA0049: CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS, PAGADIAN-ZAMBOANGA CITY ROAD, K1933+000 TO K1934+200 | Region IX | Zamboanga City 2nd DEO | Terminated | ₱10.2M | 100% | High risk78 | Flagged0.014 |
| 25KA0035INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG JCT SH AGLAYAN-ZAMBOANGUITA RD - K1518 + 000 - K1536 + 000BRGY. AGLAYAN, MALAYBALAY CITY - BRGY. LAMBAGAN, CABANGLASAN, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱64.2M | 76% | High risk95 | Flagged0.011 |
| 23JA0103CONSTRUCTION OF FOUR (4) STOREY TWELVE (12) CLASSROOM SCHOOL BUILDING, DON GREGORIO EVANGELISTA MEMORIAL SCHOOL, ZAMBOANGA CITY, ZAMBOANGA DEL SUR | Region IX | Zamboanga City 2nd DEO | On-Going | ₱36.6M | 100% | Medium risk53 | Flagged0.009 |
| 17JA0140CONSTRUCTION OF FOUR (4) STOREY TWELVE (12) CLASSROOM SCHOOL BUILDING AT SINUNUC NATIONAL HIGH SCHOOL, ZMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱32M | 100% | Medium risk41 | Flagged0.009 |
| 17JA0153CONSTRUCTION OF THREE (3) STOREY FIFTEEN (15) CLASSROOM SCHOOL BUILDING AT CULIANAN LEARNING CENTER E-IMPACT | Region IX | Zamboanga City 2nd DEO | Completed | ₱33.8M | 100% | Medium risk42 | Flagged0.003 |
| 16JA0129CONSTRUCTION OF FOUR (4) STOREY SIXTEEN (16) CLASSROOM SCHOOL BUILDING AT RAMON ENRIQUEZ HIGH SCHOOL BRGY. LABUAN, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱27.5M | 100% | Medium risk42 | Flagged0.002 |
| 17JA0144CONSTRUCTION OF FOUR (4) STOREY TWELVE (12) CLASSROOM SCHOOL BUILDING AT REGIONAL SCIENCE HIGH SCHOOL, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱31.3M | 100% | Medium risk42 | Flagged0.001 |
| 22JB0007WIDENING OF BRIDGE - TAMILOCAN BRIDGE (B01194MN) ALONG DIPOLOG-OROQUIETA NATIONAL ROAD. | Region IX | Zamboanga del Norte 2nd DEO | On-Going | ₱49.5M | 82% | Medium risk58 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 18JE0244CONSTRUCTION OF CONCRETE BRIDGE, DIPOLO RIVER-GUINTANANAN, BRGY., GUINTANANAN, DUMINGAG, ZAMBOANGA DEL SUR. | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱58.8M | 100% | Medium risk56 | Flagged0.014 |
| 52 | 22JA0037CONSTRUCTION OF 2- STOREY BUILDING BARRACKS, ZAMBOANGA ECONOMIC ZONE, BARANGAY SINUBONG, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱29.1M | 100% | Medium risk56 | —-0.071 |
| 53 | 24JA0032BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY SAN JOSE GUSU, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱6.9M | 100% | Medium risk56 | —-0.030 |
| 54 | 21JC0038CONCRETING/IMPROVEMENT OF BALAKAN-CALUCAP ROAD IN SALUG, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱49M | 100% | Medium risk55 | —-0.078 |
| 55 | 24JD0017CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), CONSTRUCTION OF ACCESS ROAD LEADING TO LOVE'S BEACH AND PANGPANG BEACH, LILOY, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱47.8M | 100% | Medium risk55 | —-0.083 |
| 56 | 22JB0051CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (SINDANGAN CULTURAL AND SPORTS CENTER) IN SINDANGAN, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱49M | 100% | Medium risk55 | —-0.072 |
| 57 | 19JC0036ROAD WIDENING (2-4 LANES) ALONG LILOY-SIOCON RD., K1967+115.00 - K1968+353.00, LILOY, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱49M | 100% | Medium risk55 | —-0.083 |
| 58 | 23JA0040BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SAN JOSE GUSU, ZAMBOANGA CITY, ZAMBOANGA DEL SUR | Region IX | Zamboanga City 2nd DEO | Completed | ₱4.9M | 100% | Medium risk55 | —-0.067 |
| 59 | 18JA0009WIDENING OF PERMANENT BRIDGE PATALON BRIDGE 2 (B01168MN) ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA ROAD | Region IX | Zamboanga City 2nd DEO | Completed | ₱19.4M | 100% | Medium risk55 | —-0.048 |
| 60 | 18JC0041CONSTRUCTION OF LAMBAGUAN BRIDGE ALONG ZAMBOANGA WEST COASTAL ROAD (LIMPAPA-SIBUCO SECTION), SIBUCO, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱31M | 100% | Medium risk55 | —-0.049 |
| 61 | 21JC0027CONSTRUCTION OF NEW BRIDGES, SIBUNGON BR. ALONG ZAMBOANGA WEST COASTAL RD (SIBUCO-SIRAWAI SECT), ZN. | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱31.6M | 100% | Medium risk55 | —-0.053 |
| 62 | 18JA0015CONSTRUCTION OF FLOOD CONTROL ALONG AYALA RIVER, AYALA SECTION BOTH SIDE (INCLUDING RIGHT OF WAY ACQUISITION), ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱18.3M | 100% | Medium risk55 | —-0.067 |
| 63 | 19JA0023CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AYALA RIVER, AYALA SECTION, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱14.4M | 100% | Medium risk55 | —-0.068 |
| 64 | 22JC0048PAVING OF UNPAVED ROADS - SECONDARY ROADS, ZAMBOANGA WEST COASTAL ROAD (LIMPAPA - SIBUCO SECTION) (S00014MN) - LINTANGAN APPROACHES K1988 + 847 - K1989 + 146, K1989 + 248 - K1989 + 385, ZN. | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱10.5M | 100% | Medium risk55 | —-0.079 |
| 65 | 18JC0042CONSTRUCTION OF SIBUNGON BRIDGE ALONG ZAMBOANGA WEST COASTAL ROAD (LIMPAPA-SIBUCO SECTION), SIBUCO, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱31M | 100% | Medium risk55 | —-0.046 |
| 66 | 22JC0014CONSTRUCTION OF ROAD, BARANGAY PANIRAN, SIBUCO, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱12.4M | 100% | Medium risk55 | —-0.079 |
| 67 | 22JA0005CONSTRUCTION OF SHORELINE PROTECTION AT BUSUGAN SECTION, BARANGAY SINUBONG, ZAMBOANGA CITY, ZAMBOANGA DEL SUR | Region IX | Zamboanga City 2nd DEO | Completed | ₱39.5M | 100% | Medium risk55 | —-0.069 |
| 68 | 20JI0026CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS LANAO-PAGADIAN-ZAMBOANGA CITY RD NRJ TO BAWANG PROVINCIAL LEADING TO SILUPA, BRGY. BAWANG, BUUG, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱28.5M | 100% | Medium risk54 | —-0.084 |
| 69 | 22JC0022CONSTRUCTION OF NEW BRIDGES, SIBUNGON BR. ALONG ZAMBOANGA WEST COASTAL RD (SIBUCO - SIRAWAI SECT), ZN. | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱27.2M | 100% | Medium risk54 | —-0.050 |
| 70 | 18JB0005CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE-DIPOLOG-SINDANGAN-LILOY ROAD-K1869+105-K1869+130, K1868+938-K1869+000, K1898+893-K1899+120 | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱31.3M | 100% | Medium risk54 | —-0.071 |
| 71 | 20JI0025CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - LANAO-PAGADIAN-ZAMBOANGA CITY RD NRJ TO BAWANG PROVINCIAL RD LEADING TO SILUPA, BRGY. BAWANG, BUUG, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱24.5M | 100% | Medium risk54 | —-0.085 |
| 72 | 23JJ0010CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT ANONGAN RIVER, ANONGAN, SIBUCO, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 4th DEO | Completed | ₱44.1M | 100% | Medium risk54 | —-0.072 |
| 73 | 23JJ0005CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT PIACAN RIVER, SIRAWAI, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 4th DEO | Completed | ₱39.2M | 100% | Medium risk54 | —-0.071 |
| 74 | 20J00220CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS STRUCTURAL IMPROVEMENT OF PUBLIC BUILDING AND CONSTRUCTION OF EVACUATION CENTERS REGION IX, BRGY. POBLACION, MABUHAY, ZAMBOANGA SIBUGAY | Region IX | Region IX | Completed | ₱34.7M | 100% | Medium risk54 | —-0.076 |
| 75 | 23JJ0011CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT PANABUTAN RIVER, SIRAWAI, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 4th DEO | Completed | ₱39.2M | 100% | Medium risk54 | —-0.071 |