Opening the dossier…
Opening the dossier…
Contractor dossier
253 projects on file, including joint ventures this contractor is part of.
Total projects
253
Total budget
₱6.6B
Average progress
98.1%
Completion rate
89.7%
Average risk score
45.5
Medium risk on average, out of 100
Flagged as unusual
14
5.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IX | 246 | ₱6.4B | 45.9 | 13 | 98.1% |
| Region X | 5 | ₱70.7M | 26.6 | 1 | 95.2% |
| Negros Island Region | 2 | ₱74.5M | 45.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 112 | ₱1.5B | 34.7 | 5 | 99.9% |
| Roads | 63 | ₱1.4B | 49.9 | 0 | 100.0% |
| Flood Control and Drainage | 33 | ₱2.3B | 61.1 | 1 | 94.3% |
| Bridges | 22 | ₱772.1M | 52.7 | 3 | 94.7% |
| Water Provision and Storage | 13 | ₱77.3M | 36.5 | 0 | 100.0% |
| OTHER | 7 | ₱231.2M | 78.8 | 3 | 81.4% |
| GAA 2025 SSP | 3 | ₱246.1M | 94.3 | 2 | 85.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25J00104ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD, BARANGAY BALAKAN-BARANGAY CALUCAP ROAD, SALUG, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱153M | 79% | High risk96 | Flagged0.032 |
| 25KA0035INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG JCT SH AGLAYAN-ZAMBOANGUITA RD - K1518 + 000 - K1536 + 000BRGY. AGLAYAN, MALAYBALAY CITY - BRGY. LAMBAGAN, CABANGLASAN, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱64.2M | 76% | High risk95 | Flagged0.011 |
| 25JF0022CONSTRUCTION OF RIVER WALL, BRGY. CAMANGA, SIAY, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱28.9M | 100% | High risk92 | —-0.018 |
| 24JA0160CONSTRUCTION OF DRAINAGE STRUCTURE AT LUSTRE ROAD (SANTA CATALINA-ZONE IV) PACKAGE 1 ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱38.6M | 70% | High risk88 | Flagged0.061 |
| 17JA0049: CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS, PAGADIAN-ZAMBOANGA CITY ROAD, K1933+000 TO K1934+200 | Region IX | Zamboanga City 2nd DEO | Terminated | ₱10.2M | 100% | High risk78 | Flagged0.014 |
| 23JA0070CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS- WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM IN BRGY. SINUNUC, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱9.8M | 100% | High risk78 | —-0.023 |
| 24JJ0003PAVING OF UNPAVED ROADS - SECONDARY ROADS, LILOY- SIOCON RD- K2048 + 196.10 - K2049 + 500 | Region IX | Zamboanga del Norte 4th DEO | On-Going | ₱38.9M | 0% | High risk78 | Flagged0.036 |
| 22JF0054CONSTRUCTION OF CAUSEWAY APPROACH-PHASE IV OF THE KALIANTANA BRIDGE, NAGA, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱48.7M | 100% | High risk77 | —-0.030 |
| 16JB0069CONSTRUCTION/EXTENSION OF FLOOD CONTROL STRUCTURE ALONG DOHINOB RIVER, ROXAS, ZAMBOANGA DEL NORTE 2ND LD. | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱38.4M | 100% | High risk76 | —-0.023 |
| 17JG0024ROAD UPGRADING (UNPAVED TO PAVED) ALONG IMELDA-BAYOG-KUMALARANG-LAPUYAN-MARGOSATUBIG ROAD (PANG-PANG SECTION) (S01184MN) CHAINAGE 14556 - CHAINAGE 16256, PANG-PANG SECTION, LAPUYAN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱46.5M | 100% | High risk76 | —-0.011 |
| 24J00156CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PULIRAN RIVER, PULIRAN BR. SECTION PACKAGE 1, SIBUCO, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱162.3M | 96% | High risk76 | —-0.012 |
| 24J00157CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PULIRAN RIVER, PULIRAN BR. SECTION PACKAGE 2, SIBUCO, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱164M | 98% | High risk76 | —-0.014 |
| 24J00034CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER (DOWNSTREAM), SIOCON, ZAMBOANGA DEL NORTE, PACKAGE 2 | Region IX | Region IX | On-Going | ₱137.9M | 100% | High risk74 | —-0.019 |
| 24J00020CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DIPOLOG RIVER, (SIANIB SECTION), POLANCO ZAMBOANGA DEL NORTE | Region IX | Region IX | Completed | ₱149.6M | 100% | High risk74 | —-0.054 |
| 25J00010CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG DIPOLOG RIVER, POBLACION NORTH SECTION, BARANGAY POBLACION NORTH, POLANCO, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱153.7M | 95% | High risk74 | —-0.021 |
| 25J00009CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAYAWAN RIVER, DAPDAP BRIDGE UPSTREAM, POLANCO, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱153.7M | 96% | High risk74 | —-0.021 |
| 24J00019CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DIPOLOG RIVER, (CONACON-GUINLES SECTION), POLANCO ZAMBOANGA DEL NORTE | Region IX | Region IX | Completed | ₱149.6M | 100% | High risk74 | —-0.054 |
| 22JF0026CONSTRUCTION OF RIVER WALL, BARANGAY BALAGON, SIAY, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱96M | 100% | High risk73 | —-0.064 |
| 24J00032CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SALUG RIVER AT SALUG BR. SECTION (B00528MN) ALONG SINDANGAN-LILOY ROAD (S01142MN), SALUG, ZAMBOANGA DEL NORTE, PACKAGE 1 | Region IX | Region IX | On-Going | ₱128.8M | 97% | High risk73 | —-0.016 |
| 24JD0045CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KIPIT RIVER, GUTALAC, ZAMBOANGA DEL NORTE (UPSTREAM) STA. 0 + 204 - 0 + 604 | Region IX | Zamboanga del Norte 3rd DEO | On-Going | ₱95.5M | 100% | High risk73 | —-0.029 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24JA0160CONSTRUCTION OF DRAINAGE STRUCTURE AT LUSTRE ROAD (SANTA CATALINA-ZONE IV) PACKAGE 1 ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱38.6M | 70% | High risk88 | Flagged0.061 |
| 24JA0159RECONSTRUCTION /REHABILITATION OF DRAINAGE STRUCTURE AT BARANGAY KASANYANGAN, ZAMBOANGA CITY PACKAGE 1 | Region IX | Zamboanga City 2nd DEO | On-Going | ₱38.6M | 0% | High risk64 | Flagged0.043 |
| 20JA0009WIDENING OF PERMANENT BRIDGES - TALISAYAN BR. (B01160MN) ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA RD | Region IX | Zamboanga City 2nd DEO | On-Going | ₱19.7M | 0% | Medium risk58 | Flagged0.039 |
| 24JJ0003PAVING OF UNPAVED ROADS - SECONDARY ROADS, LILOY- SIOCON RD- K2048 + 196.10 - K2049 + 500 | Region IX | Zamboanga del Norte 4th DEO | On-Going | ₱38.9M | 0% | High risk78 | Flagged0.036 |
| 25J00104ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD, BARANGAY BALAKAN-BARANGAY CALUCAP ROAD, SALUG, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱153M | 79% | High risk96 | Flagged0.032 |
| 18JE0244CONSTRUCTION OF CONCRETE BRIDGE, DIPOLO RIVER-GUINTANANAN, BRGY., GUINTANANAN, DUMINGAG, ZAMBOANGA DEL SUR. | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱58.8M | 100% | Medium risk56 | Flagged0.014 |
| 17JA0049: CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS, PAGADIAN-ZAMBOANGA CITY ROAD, K1933+000 TO K1934+200 | Region IX | Zamboanga City 2nd DEO | Terminated | ₱10.2M | 100% | High risk78 | Flagged0.014 |
| 25KA0035INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG JCT SH AGLAYAN-ZAMBOANGUITA RD - K1518 + 000 - K1536 + 000BRGY. AGLAYAN, MALAYBALAY CITY - BRGY. LAMBAGAN, CABANGLASAN, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱64.2M | 76% | High risk95 | Flagged0.011 |
| 23JA0103CONSTRUCTION OF FOUR (4) STOREY TWELVE (12) CLASSROOM SCHOOL BUILDING, DON GREGORIO EVANGELISTA MEMORIAL SCHOOL, ZAMBOANGA CITY, ZAMBOANGA DEL SUR | Region IX | Zamboanga City 2nd DEO | On-Going | ₱36.6M | 100% | Medium risk53 | Flagged0.009 |
| 17JA0140CONSTRUCTION OF FOUR (4) STOREY TWELVE (12) CLASSROOM SCHOOL BUILDING AT SINUNUC NATIONAL HIGH SCHOOL, ZMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱32M | 100% | Medium risk41 | Flagged0.009 |
| 17JA0153CONSTRUCTION OF THREE (3) STOREY FIFTEEN (15) CLASSROOM SCHOOL BUILDING AT CULIANAN LEARNING CENTER E-IMPACT | Region IX | Zamboanga City 2nd DEO | Completed | ₱33.8M | 100% | Medium risk42 | Flagged0.003 |
| 16JA0129CONSTRUCTION OF FOUR (4) STOREY SIXTEEN (16) CLASSROOM SCHOOL BUILDING AT RAMON ENRIQUEZ HIGH SCHOOL BRGY. LABUAN, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱27.5M | 100% | Medium risk42 | Flagged0.002 |
| 17JA0144CONSTRUCTION OF FOUR (4) STOREY TWELVE (12) CLASSROOM SCHOOL BUILDING AT REGIONAL SCIENCE HIGH SCHOOL, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱31.3M | 100% | Medium risk42 | Flagged0.001 |
| 22JB0007WIDENING OF BRIDGE - TAMILOCAN BRIDGE (B01194MN) ALONG DIPOLOG-OROQUIETA NATIONAL ROAD. | Region IX | Zamboanga del Norte 2nd DEO | On-Going | ₱49.5M | 82% | Medium risk58 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 18JC0013CONSTRUCTION OF MULTIPURPOSE BUILDING (COVERED COURT), SAN JOSE ELEMENTARY SCHOOL, SAN JOSE, BALIGUIAN, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱3.6M | 100% | Low risk28 | —-0.080 |
| 202 | 20JC0036CONSTRUCTION OF MULTI-PURPOSE BUILDING, MIDATAG, LEON B. POSTIGO, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱3.8M | 100% | Low risk27 | —-0.084 |
| 203 | 21JC0009REHABILITATION OF MULTI-PURPOSE BUILDING, SALUG MUNICIPAL HALL, SALUG, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱3M | 100% | Low risk27 | —-0.081 |
| 204 | 24JJ0045CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) AT 1. BULACAN, SIOCON, ZN 2. MAKIANG, SIOCON, ZN 3. MAMAD, BALIGUIAN, ZN 4. MAMAWAN, BALIGUIAN, ZN 5. SAN JOSE, BALIGUIAN, ZN 6. SIAY, SIOCON, ZN 7. SIRAWAI, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 4th DEO | Completed | ₱2.9M | 100% | Low risk27 | —-0.041 |
| 205 | 19JC0021CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), PIANON NATIONAL HIGH SCHOOL, BRGY. PIANON, KALAWIT, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱3.6M | 100% | Low risk27 | —-0.083 |
| 206 | 20JC0043CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAN ISIDRO, GUTALAC, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱3.8M | 100% | Low risk26 | —-0.082 |
| 207 | 18JA0069CONCRETING OF ROAD, BRGY. LAMISAHAN, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱1.9M | 100% | Low risk26 | —-0.077 |
| 208 | 20JD0071CONSTRUCTION OF WATER SYSTEM LEVEL II DESIN, PIÑAN, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 1st DEO | Completed | ₱4M | 100% | Low risk26 | —-0.046 |
| 209 | 20JC0033CONSTRUCTION OF MULTI-PURPOSE BUILDING, KALAWIT CENTRAL SCHOOL, POBLACION, KALAWIT, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱3.8M | 100% | Low risk26 | —-0.083 |
| 210 | 18JC0008CONSTRUCTION OF MULTIPURPOSE BUILDING (COVERED COURT), SAN VICENTE, GUTALAC, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱3.3M | 100% | Low risk26 | —-0.082 |
| 211 | 22JF0065CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAINWATER COLLECTOR SYSTEM | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱2.9M | 100% | Low risk26 | —-0.044 |
| 212 | 17J00192PROPOSED ADDITIONAL RAINWATER COLLECTION SYSTEM OF DPWH REGIONAL OFFICE IX (7 CLUSTERED PROJECTS) FOR 2017 | Region IX | Region IX | Completed | ₱1.3M | 100% | Low risk26 | —-0.018 |
| 213 | 20JC0070CONCRETING OF LOCAL ROADS, LILOY, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱2M | 100% | Low risk26 | —-0.080 |
| 214 | 17JB0002ROAD OPENING WITH CONCRETING PUROK MADASIGON TO BRGY. DOHINOB, PRES. MANUEL ROXAS, ZAMBOANGA DEL NORTE. | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱1.7M | 100% | Low risk25 | —-0.050 |
| 215 | 22JC0043RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, CARACOL BR. (B00527MN) ALONG SINDANGAN - LILOY RD, ZN. | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱2M | 100% | Low risk25 | —-0.053 |
| 216 | 22JC0044REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, OSUKAN BR. (B01181MN) ALONG LILOY - SIOCON RD, ZN. | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱2M | 100% | Low risk24 | —-0.052 |
| 217 | 22JF0059CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. POBLACION, SIAY, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱2.6M | 100% | Low risk23 | —-0.083 |
| 218 | 18JD0021CONSTRUCTION OF MULTIPURPOSE BUILDING/COVERED COURT BRGY. SAN FRANCISCO, SERGIO OSMEÑA, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 1st DEO | Completed | ₱2.4M | 100% | Low risk23 | —-0.082 |
| 219 | 18JD0016CONSTRUCTION OF MULTIPURPOSE BUILDING/COVERED COURT BRGY. MABUHAY, SERGIO OSMEÑA, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 1st DEO | Completed | ₱2.5M | 100% | Low risk23 | —-0.082 |
| 220 | 18JA0070CONCRETING OF ROAD, BARANGAY LIMAONG, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱1.4M | 100% | Low risk23 | —-0.079 |
| 221 | 18JA0075CONCRETING OF ROAD, BARANGAY TUMITUS, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱1.4M | 100% | Low risk23 | —-0.079 |
| 222 | 18JA0085CONCRETING OR ROAD, BARANGAY MUTI, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱1.9M | 100% | Low risk22 | —-0.078 |
| 223 | 22JF0046CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, SAN FERNANDINO NATIONAL HIGH SCHOOL, BARANGAY SAN FERNANDINO, R.T. LIM, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱2M | 100% | Low risk22 | —-0.082 |
| 224 | 23JD0017CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COVERED COURT), TUGOP, KALAWIT, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱2.3M | 100% | Low risk22 | —-0.080 |
| 225 | 23JD0015CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COVERED COURT), SAN ISIDRO, GUTALAC, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱2M | 100% | Low risk21 | —-0.082 |