Opening the dossier…
Opening the dossier…
Contractor dossier
4 projects on file, including joint ventures this contractor is part of.
Total projects
4
Total budget
₱344.2M
Average progress
99.2%
Completion rate
75.0%
Average risk score
57.2
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 4 | ₱344.2M | 57.2 | 0 | 99.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 2 | ₱198M | 48.9 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱124M | 92.4 | 0 | 96.9% |
| Water Provision and Storage | 1 | ₱22.2M | 38.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25NG0005CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SURIGAO RIVER/BARANGAY MABUHAY, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱124M | 97% | High risk92 | —-0.008 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25NG0005CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SURIGAO RIVER/BARANGAY MABUHAY, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱124M | 97% | High risk92 | —-0.008 |
| 2 | 24NG0050CONSTRUCTION OF TINAGO FLOOD CONTROL STRUCTURE/ BARANGAY TINAGO, MALIMONO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱99M | 100% | Medium risk50 | —-0.061 |
| 3 | 24N00126CONSTRUCTION OF SHORE PROTECTION STRUCTURE ALONG POBLACION 2, BURGOS, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱99M | 100% | Medium risk48 | —-0.054 |
| 4 | 20NH0072UPGRADING OF WATER SYSTEM OF BRGY. BRITANIA AND BRGY. SALVACION, SAN AGUSTIN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱22.2M | 100% | Medium risk39 | —-0.035 |