Contractor dossier
126 projects on file, including joint ventures this contractor is part of.
Total projects
126
Total budget
₱836M
Average progress
86.1%
Completion rate
72.2%
Average risk score
42.0
Medium risk on average, out of 100
Flagged as unusual
3
2.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 126 | ₱836M | 42.0 | 3 | 86.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 65 | ₱452.3M | 40.4 | 0 | 92.0% |
| Buildings and Facilities | 31 | ₱230.9M | 44.1 | 0 | 72.4% |
| Flood Control and Drainage | 23 | ₱111.5M | 36.2 | 0 | 92.2% |
| GAA 2025 SSP | 3 | ₱22.2M | 91.5 | 3 | 37.5% |
| Water Provision and Storage | 3 | ₱13.4M | 40.5 | 0 | 100.0% |
| OTHER | 1 | ₱5.8M | 69.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DB0139CONVERGENCE& SPECIAL SUPPORT PROG-BASIC INFRAS PROG (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL RDS LEADING TO MAJ/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD AT BARANGAY MALARUHATAN-BARANGAY BAGONG POOK,LIAN,BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱9.6M | 8% | High risk94 | Flagged0.026 |
| 25DC0161CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI PURPOSE BUILDING AT BRGY. BAGBAG, TANAUAN CITY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱9.7M | 27% | High risk94 | Flagged0.014 |
| 25DB0141CONVERGENCE AND SPECIAL SUPPORT PROG - BASIC INFRAS PROG (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD AT SITIO ZABARTE, BARANGAY GUINHAWA, TUY, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱2.9M | 77% | High risk87 | Flagged0.003 |
| 25DB0191CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI PURPOSE BUILDING AT BRGY. TUYON-TUYON, TUY, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱4.8M | 6% | High risk75 | —-0.009 |
| 25DB0190CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION OF MULTI PURPOSE BUILDING AT BARANGAY IBA, TAAL, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱4.8M | 51% | High risk75 | —-0.026 |
| 23DD0174CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BRGY. AGUILA, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱5.8M | 100% | High risk70 | —-0.042 |
| 25DC0128CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD AT BRGY. BIHIS, STA. TERESITA, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 12% | High risk68 | —-0.020 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DB0139CONVERGENCE& SPECIAL SUPPORT PROG-BASIC INFRAS PROG (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL RDS LEADING TO MAJ/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD AT BARANGAY MALARUHATAN-BARANGAY BAGONG POOK,LIAN,BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱9.6M | 8% | High risk94 | Flagged0.026 |
| 25DC0161CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI PURPOSE BUILDING AT BRGY. BAGBAG, TANAUAN CITY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱9.7M | 27% | High risk94 | Flagged0.014 |
| 25DB0141CONVERGENCE AND SPECIAL SUPPORT PROG - BASIC INFRAS PROG (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD AT SITIO ZABARTE, BARANGAY GUINHAWA, TUY, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱2.9M | 77% | High risk87 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 22DD0298CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III), CONSTRUCTION OF ADDITIONAL WATER SOURCE, BRGY. LUMIL, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk48 | —-0.069 |
| 27 | 25DB0192CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - IMPROVEMENT OF MULTI-PURPOSE BUILDING AT BRGY. BALIBAGO, CALATAGAN, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱6.7M | 4% | Medium risk48 | —-0.031 |
| 28 | 22DD0260CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIPRAP AT BARANGAY BIGAIN I, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk48 | —-0.084 |
| 29 | 23DD0209CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, REHABILITATION OF DRAINAGE SYSTEM AT POBLACION BARANGAY III, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk48 | —-0.084 |
| 30 | 23DD0209CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, REHABILITATION OF DRAINAGE SYSTEM AT POBLACION BARANGAY III, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk48 | —-0.084 |
| 31 | 23DD0210CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, REHABILITATION OF DRAINAGE SYSTEM AT POBLACION BARANGAY IV, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk48 | —-0.084 |
| 32 | 23DD0242CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, REHABILITATION OF DRAINAGE SYSTEM AT POBLACION BARANGAY I, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk48 | —-0.086 |
| 33 | 23DD0257CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF DRAINAGE SYSTEM, BRGY. BAGONG POOK, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk48 | —-0.087 |
| 34 | 23DD0208CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIPRAP, BRGY. LAPOLAPO II, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk48 | —-0.087 |
| 35 | 24DE0132CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), EVACUATION CENTERS/QUARANTINE FACILITIES/PUBLIC HEALTH FACILITIES, REHABILITATION OF EVACUATION CENTER I, POBLACION, SAN LUIS, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱5M | 100% | Medium risk47 | —-0.104 |
| 36 | 25DE0150CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD AT BARANGAY STO.TOMAS TO PILAHAN, MABINI, BATANG | Region IV-A | Batangas 2nd DEO | On-Going | ₱4.8M | 0% | Medium risk47 | —-0.043 |
| 37 | 23DD0184CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF BOX CULVERT, BRGY. SABANG, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱5.8M | 100% | Medium risk47 | —-0.087 |
| 38 | 23DD0240CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, REHABILITATION OF DRAINAGE SYSTEM, BRGY. BALAGTASIN I, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱5.8M | 100% | Medium risk47 | —-0.088 |
| 39 | 23DD0162CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF BOX CULVERT, BRGY. LALAYAT-BRGY. TUGTUG, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱10.6M | 100% | Medium risk47 | —-0.089 |
| 40 | 22DD0294CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF DRAINAGE SYSTEM AT BARANGAY BANAYBANAY II, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱9.6M | 100% | Medium risk47 | —-0.090 |
| 41 | 24DD0118CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY AYA, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱4.8M | 100% | Medium risk47 | —-0.068 |
| 42 | 23DD0197CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BRGY. BANAYBANAY II, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.103 |
| 43 | 22DD0225CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF ROAD, BARANGAY GALAMAY-AMO, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.104 |
| 44 | 22DD0224CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF ROAD IN BARANGAY PINAGTUNG-ULAN, SAN JOSE, BATANG | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.104 |
| 45 | 25DE0151CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD AT BARANGAY STO. TOMAS TO LAUREL, MABINI, BATANG | Region IV-A | Batangas 2nd DEO | On-Going | ₱4.8M | 29% | Medium risk47 | —-0.054 |
| 46 | 22DD0296CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD AT BARANGAY NATUNUAN, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.102 |
| 47 | 19DD0053LOCAL PROGRAM, LOCAL ROADS AND BRIDGES- LOCAL ROADS- LOCAL INFRASTRUCTURE PROGRAM, CONSTRUCTION OF ROAD AT THE NEW MUNICIPAL BUILDING SITE, BRGY. DON LUIS, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.103 |
| 48 | 24DE0165CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD CONNECTING BARANGAY SAN JOSE-BARANGAY STA. ANA A | Region IV-A | Batangas 2nd DEO | Completed | ₱14.9M | 100% | Medium risk46 | —-0.106 |
| 49 | 18DD0422LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, A.) CONCRETING OF ROAD, BRGY. BUKAL, PADRE GARCIA, BATANGAS B.) REHABILITATION OF ROAD, TAMAK, PADRE GARCIA, BATANGAS C.) ROAD CONCRETING, BRGY. SAN MIGUEL, PADRE GARCIA, B | Region IV-A | Batangas 4th DEO | Completed | ₱14.7M | 100% | Medium risk46 | —-0.108 |
| 50 | 25DB0125CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD AT BARANGAY. SANTA ANA, CALATAGAN, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱4.8M | 100% | Medium risk46 | —-0.074 |