Contractor dossier
126 projects on file, including joint ventures this contractor is part of.
Total projects
126
Total budget
₱836M
Average progress
86.1%
Completion rate
72.2%
Average risk score
42.0
Medium risk on average, out of 100
Flagged as unusual
3
2.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 126 | ₱836M | 42.0 | 3 | 86.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 65 | ₱452.3M | 40.4 | 0 | 92.0% |
| Buildings and Facilities | 31 | ₱230.9M | 44.1 | 0 | 72.4% |
| Flood Control and Drainage | 23 | ₱111.5M | 36.2 | 0 | 92.2% |
| GAA 2025 SSP | 3 | ₱22.2M | 91.5 | 3 | 37.5% |
| Water Provision and Storage | 3 | ₱13.4M | 40.5 | 0 | 100.0% |
| OTHER | 1 | ₱5.8M | 69.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DB0139CONVERGENCE& SPECIAL SUPPORT PROG-BASIC INFRAS PROG (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL RDS LEADING TO MAJ/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD AT BARANGAY MALARUHATAN-BARANGAY BAGONG POOK,LIAN,BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱9.6M | 8% | High risk94 | Flagged0.026 |
| 25DC0161CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI PURPOSE BUILDING AT BRGY. BAGBAG, TANAUAN CITY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱9.7M | 27% | High risk94 | Flagged0.014 |
| 25DB0141CONVERGENCE AND SPECIAL SUPPORT PROG - BASIC INFRAS PROG (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD AT SITIO ZABARTE, BARANGAY GUINHAWA, TUY, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱2.9M | 77% | High risk87 | Flagged0.003 |
| 25DB0191CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI PURPOSE BUILDING AT BRGY. TUYON-TUYON, TUY, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱4.8M | 6% | High risk75 | —-0.009 |
| 25DB0190CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION OF MULTI PURPOSE BUILDING AT BARANGAY IBA, TAAL, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱4.8M | 51% | High risk75 | —-0.026 |
| 23DD0174CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BRGY. AGUILA, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱5.8M | 100% | High risk70 | —-0.042 |
| 25DC0128CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD AT BRGY. BIHIS, STA. TERESITA, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 12% | High risk68 | —-0.020 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DB0139CONVERGENCE& SPECIAL SUPPORT PROG-BASIC INFRAS PROG (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL RDS LEADING TO MAJ/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD AT BARANGAY MALARUHATAN-BARANGAY BAGONG POOK,LIAN,BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱9.6M | 8% | High risk94 | Flagged0.026 |
| 25DC0161CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI PURPOSE BUILDING AT BRGY. BAGBAG, TANAUAN CITY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱9.7M | 27% | High risk94 | Flagged0.014 |
| 25DB0141CONVERGENCE AND SPECIAL SUPPORT PROG - BASIC INFRAS PROG (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD AT SITIO ZABARTE, BARANGAY GUINHAWA, TUY, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱2.9M | 77% | High risk87 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 22DD0025CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, PREVENTIVE MAINTENANCE ALONG LIPA-ROSARIO RD - K0088 + 507 - K0088 + 954 | Region IV-A | Batangas 4th DEO | Completed | ₱3.4M | 100% | Low risk25 | —-0.102 |
| 102 | 25DB0137CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY ROAD AT BRGY. 4, CALATAGAN, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱2.9M | 100% | Low risk25 | —-0.074 |
| 103 | 23DD0211CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION (COMPLETION) OF ROAD, BRGY. BANAY-BANAY I, SAN JOSE, B | Region IV-A | Batangas 4th DEO | Completed | ₱4.3M | 100% | Low risk25 | —-0.106 |
| 104 | 23DD0127CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION (COMPLETION) OF ROAD, BRGY. DAGATAN, SAN JOSE, BATANGA | Region IV-A | Batangas 4th DEO | Completed | ₱2.9M | 100% | Low risk25 | —-0.102 |
| 105 | 22DD0300CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD AT BARANGAY BANAYBANAY I, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱3.8M | 100% | Low risk25 | —-0.102 |
| 106 | 21DC0229REPAIR/MAINTENANCE OF CALAMITY DAMAGE ON NATIONAL ROAD AT TALISAY-LAUREL-AGONCILLO ROAD (S01928LZ) - K0100+700 | Region IV-A | Batangas 3rd DEO | Completed | ₱4.1M | 100% | Low risk25 | —-0.106 |
| 107 | 23DD0199CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION (COMPLETION) OF ROAD, BRGY. LEPUTE, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱3.8M | 100% | Low risk25 | —-0.107 |
| 108 | 23DD0168CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION (COMPLETION) OF ROAD, BRGY. AYA, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱2.9M | 100% | Low risk25 | —-0.102 |
| 109 | 22DD0227CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION (COMPLETION) OF ROAD AT BARANGAY PINAGTUNG-ULAN, SAN J | Region IV-A | Batangas 4th DEO | Completed | ₱2.9M | 100% | Low risk25 | —-0.102 |
| 110 | 23DD0308CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III), CONSTRUCTION (COMPLETION) OF WATERWORKS SYSTEM, BRGY. BALAGTASIN, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱3.8M | 100% | Low risk25 | —-0.069 |
| 111 | 20DC0228REHABILITATION OF FLOOD CONTROL AND DRAINAGE STRUCTURE ALONG TALISAY - LAUREL - AGONCILLO ROAD, AGONCILLO, BATANGAS K0117+000 | Region IV-A | Batangas 3rd DEO | Completed | ₱4.4M | 100% | Low risk25 | —-0.036 |
| 112 | 25DE0114CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL AT PUROK 6, BARANGAY MASAGUITSIT, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱1.9M | 10% | Low risk25 | —-0.026 |
| 113 | 25DE0131CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION AT BARANGAY FABRICA, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱1.9M | 10% | Low risk24 | —-0.026 |
| 114 | 21DE0007LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF ROAD, BARANGAY TEJERO, SAN LUIS, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱2.5M | 100% | Low risk24 | —-0.103 |
| 115 | 19DD0090LOCAL PROGRAM, BUILDINGS AND OTHER STRUCTURES- MULTIPURPOSE/FACILITIES- LOCAL INFRASTRUCTURE PROGRAM, CONSTRUCTION OF MULTI-PURPOSE BUILDING IN SALABAN ES, BARANGAY SALABAN, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱2M | 100% | Low risk24 | —-0.102 |
| 116 | 21DE0017LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF ROAD,BARANGAY SAN ISIDRO,SAN LUIS,BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱2.5M | 100% | Low risk24 | —-0.102 |
| 117 | 21DD0229LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, FLOOD CONTROL AND DRAINAGE, DRAINAGE/ PROTECTION WORKS, REHABILITATION/ IMPROVEMENT OF ROAD AND DRAINAGE SYSTEM IN BARANGAY BIGAIN I, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱2M | 100% | Low risk23 | —-0.081 |
| 118 | 21DD0073LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, FLOOD CONTROL AND DRAINAGE, DRAINAGE/ PROTECTION WORKS, IMPROVEMENT OF DRAINAGE SYSTEM IN BARANGAY POBLACION II, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱1.9M | 100% | Low risk23 | —-0.083 |
| 119 | 21DD0054LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, FLOOD CONTROL AND DRAINAGE, DRAINAGE / PROTECTION WORKS, IMPROVEMENT OF ROAD AND SLOPE PROTECTION IN BARANGAY BIGAIN 2, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱1.9M | 100% | Low risk23 | —-0.082 |
| 120 | 25DB0138CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY ROAD BRGY. GULOD, CALATAGAN, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱1.9M | 100% | Low risk22 | —-0.078 |
| 121 | 21DD0016LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, IMPROVEMENT OF ROAD IN BARANGAY TUGTUG, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱1.9M | 100% | Low risk22 | —-0.102 |
| 122 | 22DD0208CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION (COMPLETION) OF ROAD AT BARANGAY GALAMAY-AMO, SAN JOSE | Region IV-A | Batangas 4th DEO | Completed | ₱1.9M | 100% | Low risk22 | —-0.101 |
| 123 | 20DC0229REHABILITATION OF DRAINAGE STRUCTURE ALONG TANAUAN - TALISAY - TAGAYTAY ROAD, K0064+(-399) - K0085+672 | Region IV-A | Batangas 3rd DEO | Completed | ₱1.9M | 100% | Low risk18 | —-0.054 |
| 124 | 21DC0230REHABILITATION OF DRAINAGE STRUCTURE ALONG BANAY-BANAY-MOJON-CUENCA ROAD - K0092+820 - K0092+853 | Region IV-A | Batangas 3rd DEO | Completed | ₱1.9M | 100% | Low risk17 | —-0.102 |
| 125 | 19DD0075LOCAL PROGRAM, BUILDINGS AND OTHER STRUCTURES- MULTIPURPOSE/FACILITIES- LOCAL INFRASTRUCTURE PROGRAM, CONSTRUCTION (COMPLETION) OF MULTIPURPOSE BUILDING, DAGATAN, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱970K | 100% | Low risk15 | —-0.101 |