Opening the dossier…
Opening the dossier…
Contractor dossier
154 projects on file, including joint ventures this contractor is part of.
Total projects
154
Total budget
₱4.2B
Average progress
96.7%
Completion rate
92.2%
Average risk score
38.4
Medium risk on average, out of 100
Flagged as unusual
7
4.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-B | 152 | ₱4.1B | 38.3 | 7 | 96.7% |
| Region VI | 2 | ₱79.1M | 46.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 61 | ₱2B | 39.1 | 1 | 98.2% |
| Buildings and Facilities | 45 | ₱300.8M | 26.0 | 0 | 100.0% |
| Flood Control and Drainage | 34 | ₱1.5B | 45.5 | 0 | 100.0% |
| Water Provision and Storage | 5 | ₱10.4M | 19.5 | 0 | 100.0% |
| GAA 2025 SSP | 3 | ₱72M | 94.0 | 3 | 56.4% |
| Bridges | 3 | ₱141.8M | 53.3 | 2 | 50.9% |
| GAA 2025 OO-2 | 2 | ₱71.3M | 87.6 | 0 | 70.2% |
| GAA 2025 OO-1 | 1 | ₱80.2M | 93.9 | 1 | 46.7% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25EI0157CONSTRUCTION OF ARMY CAMP ROAD, BANSUD, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | On-Going | ₱47.7M | 7% | High risk95 | Flagged0.034 |
| 25EI0110CONSTRUCTION OF FACILITIES FOR PERSONS WITH DISABILITIES (PWD) AND ELDERLIES/ SENIOR CITIZENS INCLUDING GENDER I RESPONSIBLE FACILITIES PHASE II, SAN MARIANO, ROXAS, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | On-Going | ₱19.4M | 64% | High risk94 | Flagged0.019 |
| 25EI0005ROAD WIDENING-SECONDARY ROADS BONGABONG-SAGANA-ROXAS-SAN AQUILINO ROAD- K0119+103.00-K0121+000.00, K0122+421.00-K0122+474.00, BONGABONG, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | On-Going | ₱80.2M | 47% | High risk94 | Flagged0.010 |
| 25EI0076CONSTRUCTION OF MULTI-PURPOSE BUILDING (SK BUILDING) AT BARANGAY POBLACION, MANSALAY, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | On-Going | ₱4.9M | 98% | High risk93 | Flagged0.008 |
| 25EI0024CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF BAROC RIVER FLOOD CONTROL STRUCTURE, BARANGAY SAN AQUILINO, ROXAS, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | On-Going | ₱42.3M | 56% | High risk88 | —-0.008 |
| 25EI0026CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF PULA RIVER CONTROL STRUCTURE, BARANGAY SANTO NINO AND BARANGAY BACUNGAN, PINAMALAYAN, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | On-Going | ₱29M | 84% | High risk87 | —-0.015 |
| 17EI0039REHAB./RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE CSR (K0119+060 - K0119+436, K0160+540 - K0160+836 & K0161+542 - K0161+823, BONGABONG - MANSALAY, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱92.7M | 100% | High risk70 | —-0.045 |
| 20EI0038CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE/GABION ARMOURING AT MALAMIG RIVER, GLORIA, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱49M | 100% | High risk69 | —-0.045 |
| 17ED0019CONSTRUCTION OF DULANGAN RIVER CONTROL (GABIONS), BACO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱45.7M | 100% | High risk65 | —-0.043 |
| 20EI0050CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF TAWAS RIVER CONTROL, BONGABONG, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱19.6M | 100% | High risk65 | —-0.045 |
| 17ED0020CONSTRUCTION OF PANGGALAAN RIVER CONTROL, SAN NICOLAS SECTION, NAUJAN, ORIENTAL MINDORO 1ST LD | Region IV-B | Mindoro Oriental DEO | Completed | ₱18.6M | 100% | High risk64 | —-0.046 |
| 17ED0018CONSTRUCTION OF DEL PILAR RIVER CONTROL (GABION), STA. 0+000 - STA. 0+680, NAUJAN, ORIENTAL MINDORO 1ST LD, NAUJAN, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱42.5M | 100% | High risk64 | —-0.041 |
| 17ED0145CONSTRUCTION OF FLOOD CONTROL STRUCTURE WITHIN ALAG (MALAYLAY - BACO) RIVER, BACO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱6.5M | 100% | High risk64 | —-0.043 |
| 24E00101ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS- CALAPAN SOUTH ROAD- K0069+180-K0127+931 (INTERMITTENT SECTIONS), SOUTHERN MINDORO | Region IV-B | Region IV-B | On-Going | ₱181.2M | 75% | High risk63 | —-0.031 |
| 17ED0029OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE CSR JCT. MINAS ROAD K0035+(-526) - K0035+000, K0040+950 - K0041+765, K0042+000 - K0042+615, K0042+791 - K0043+656, K0043+740 - K0043+756.50, VICTORIA, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱45.8M | 100% | High risk60 | —-0.053 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25EI0157CONSTRUCTION OF ARMY CAMP ROAD, BANSUD, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | On-Going | ₱47.7M | 7% | High risk95 | Flagged0.034 |
| 25EI0110CONSTRUCTION OF FACILITIES FOR PERSONS WITH DISABILITIES (PWD) AND ELDERLIES/ SENIOR CITIZENS INCLUDING GENDER I RESPONSIBLE FACILITIES PHASE II, SAN MARIANO, ROXAS, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | On-Going | ₱19.4M | 64% | High risk94 | Flagged0.019 |
| 25E00155BRIDGE PROGRAM- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES- BALITE BR. (B00036MR) ALONG CALAPAN SOUTH ROAD, GLORIA, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱27.9M | 0% | Medium risk53 | Flagged0.015 |
| 25EI0005ROAD WIDENING-SECONDARY ROADS BONGABONG-SAGANA-ROXAS-SAN AQUILINO ROAD- K0119+103.00-K0121+000.00, K0122+421.00-K0122+474.00, BONGABONG, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | On-Going | ₱80.2M | 47% | High risk94 | Flagged0.010 |
| 25EI0076CONSTRUCTION OF MULTI-PURPOSE BUILDING (SK BUILDING) AT BARANGAY POBLACION, MANSALAY, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | On-Going | ₱4.9M | 98% | High risk93 | Flagged0.008 |
| 25E00156WIDENING OF PERMANENT BRIDGES- ORCONUMA BR. (B00217MR) ALONG BONGABONG-SAGANA-ROXAS-SAN AQUILINO ROAD (PHASE II), BONGABONG, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱46.7M | 53% | Medium risk58 | Flagged0.005 |
| 17EI0190CONSTRUCTION/OPENING WITH SPOT CONCRETING OF ALL WEATHER ROAD FROM SITIO PROPER TO SITIO SINARIRI, BRGY. PANAYTAYAN, MANSALAY, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱48.7M | 100% | Medium risk59 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25EI0157CONSTRUCTION OF ARMY CAMP ROAD, BANSUD, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | On-Going | ₱47.7M | 7% | High risk95 | Flagged0.034 |
| 2 | 25EI0110CONSTRUCTION OF FACILITIES FOR PERSONS WITH DISABILITIES (PWD) AND ELDERLIES/ SENIOR CITIZENS INCLUDING GENDER I RESPONSIBLE FACILITIES PHASE II, SAN MARIANO, ROXAS, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | On-Going | ₱19.4M | 64% | High risk94 | Flagged0.019 |
| 3 | 25EI0005ROAD WIDENING-SECONDARY ROADS BONGABONG-SAGANA-ROXAS-SAN AQUILINO ROAD- K0119+103.00-K0121+000.00, K0122+421.00-K0122+474.00, BONGABONG, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | On-Going | ₱80.2M | 47% | High risk94 | Flagged0.010 |
| 4 | 25EI0076CONSTRUCTION OF MULTI-PURPOSE BUILDING (SK BUILDING) AT BARANGAY POBLACION, MANSALAY, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | On-Going | ₱4.9M | 98% | High risk93 | Flagged0.008 |
| 5 | 25EI0024CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF BAROC RIVER FLOOD CONTROL STRUCTURE, BARANGAY SAN AQUILINO, ROXAS, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | On-Going | ₱42.3M | 56% | High risk88 | —-0.008 |
| 6 | 25EI0026CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF PULA RIVER CONTROL STRUCTURE, BARANGAY SANTO NINO AND BARANGAY BACUNGAN, PINAMALAYAN, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | On-Going | ₱29M | 84% | High risk87 | —-0.015 |
| 7 | 17EI0039REHAB./RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE CSR (K0119+060 - K0119+436, K0160+540 - K0160+836 & K0161+542 - K0161+823, BONGABONG - MANSALAY, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱92.7M | 100% | High risk70 | —-0.045 |
| 8 | 20EI0038CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE/GABION ARMOURING AT MALAMIG RIVER, GLORIA, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱49M | 100% | High risk69 | —-0.045 |
| 9 | 17ED0019CONSTRUCTION OF DULANGAN RIVER CONTROL (GABIONS), BACO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱45.7M | 100% | High risk65 | —-0.043 |
| 10 | 20EI0050CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF TAWAS RIVER CONTROL, BONGABONG, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱19.6M | 100% | High risk65 | —-0.045 |
| 11 | 17ED0020CONSTRUCTION OF PANGGALAAN RIVER CONTROL, SAN NICOLAS SECTION, NAUJAN, ORIENTAL MINDORO 1ST LD | Region IV-B | Mindoro Oriental DEO | Completed | ₱18.6M | 100% | High risk64 | —-0.046 |
| 12 | 17ED0018CONSTRUCTION OF DEL PILAR RIVER CONTROL (GABION), STA. 0+000 - STA. 0+680, NAUJAN, ORIENTAL MINDORO 1ST LD, NAUJAN, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱42.5M | 100% | High risk64 | —-0.041 |
| 13 | 17ED0145CONSTRUCTION OF FLOOD CONTROL STRUCTURE WITHIN ALAG (MALAYLAY - BACO) RIVER, BACO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱6.5M | 100% | High risk64 | —-0.043 |
| 14 | 24E00101ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS- CALAPAN SOUTH ROAD- K0069+180-K0127+931 (INTERMITTENT SECTIONS), SOUTHERN MINDORO | Region IV-B | Region IV-B | On-Going | ₱181.2M | 75% | High risk63 | —-0.031 |
| 15 | 17ED0029OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE CSR JCT. MINAS ROAD K0035+(-526) - K0035+000, K0040+950 - K0041+765, K0042+000 - K0042+615, K0042+791 - K0043+656, K0043+740 - K0043+756.50, VICTORIA, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱45.8M | 100% | High risk60 | —-0.053 |
| 16 | 18E00061REHAB./CONCRETING OF PINAGSABANGAN BEACH ROAD INCLUDING DRAINAGE, STA. 2+799.00-STA. 6+929.76; STA. 7+409.87-STA. 8+046.49, ORIENTAL MINDORO | Region IV-B | Region IV-B | Completed | ₱134.4M | 100% | Medium risk60 | —-0.072 |
| 17 | 17EI0190CONSTRUCTION/OPENING WITH SPOT CONCRETING OF ALL WEATHER ROAD FROM SITIO PROPER TO SITIO SINARIRI, BRGY. PANAYTAYAN, MANSALAY, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱48.7M | 100% | Medium risk59 | Flagged0.003 |
| 18 | 25E00156WIDENING OF PERMANENT BRIDGES- ORCONUMA BR. (B00217MR) ALONG BONGABONG-SAGANA-ROXAS-SAN AQUILINO ROAD (PHASE II), BONGABONG, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱46.7M | 53% | Medium risk58 | Flagged0.005 |
| 19 | 22E00060SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-CONST. OF STA. MARIA TO MANGUYANG ROAD, STA. 2+260-STA. 2+514.76, STA. 2+900-STA. 3+637.95, STA. 4+490.21-STA. 8+470, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | Completed | ₱107.1M | 100% | Medium risk53 | —-0.077 |
| 20 | 22EI0114CONSTRUCTION OF BULALACAO PUBLIC MARKET, BULALACAO, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱96.5M | 100% | Medium risk53 | —-0.065 |
| 21 | 25E00155BRIDGE PROGRAM- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES- BALITE BR. (B00036MR) ALONG CALAPAN SOUTH ROAD, GLORIA, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱27.9M | 0% | Medium risk53 | Flagged0.015 |
| 22 | 23E00114ASSE PRESERVATION PROGRAM- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-SECONDARY ROADS, CALAPAN SOUTH ROAD, K0064+833 - K0067+424, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱96.8M | 86% | Medium risk53 | —-0.043 |
| 23 | 21E00035ROAD WIDENING OF CALAPAN SOUTH ROAD, KO064+(-933.00)-KO064+(-780); KO087+721-KO087+863; KO102+237-KO102+550; KO146+750-KO147+064; KO161+854-KO163+000, ORIENTAL MINDORO | Region IV-B | Region IV-B | Completed | ₱97.7M | 100% | Medium risk53 | —-0.077 |
| 24 | 22EI0081WIDENING OF PERMANENT BRIDGES: BANSUD BR. (B00046MR) ALONG CALAPAN SOUTH ROAD, BANSUD, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱67.1M | 100% | Medium risk48 | —-0.044 |
| 25 | 18GA0078CONST./IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATION NRJ LEADING TO SAPSAPON CAVE, BRGY. TIGUM, BURUANGA, AKLAN | Region VI | Aklan DEO | Completed | ₱37.3M | 100% | Medium risk47 | —-0.079 |