Opening the dossier…
Opening the dossier…
Contractor dossier
6 projects on file, including joint ventures this contractor is part of.
Total projects
6
Total budget
₱72.9M
Average progress
93.9%
Completion rate
0.0%
Below 70%
Average risk score
53.6
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 6 | ₱72.9M | 53.6 | 0 | 93.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 3 | ₱19.7M | 44.9 | 0 | 97.1% |
| GAA 2025 SSP | 1 | ₱28.9M | 94.8 | 0 | 92.2% |
| Bridges | 1 | ₱14.3M | 46.8 | 0 | 100.0% |
| Flood Control and Drainage | 1 | ₱9.9M | 45.5 | 0 | 80.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25K00384INSTALLATION OF ALL-IN-ONE SOLAR LED STREETLIGHT PROJECT, MARAWI CITY TO MALABANG NATIONAL ROAD, LANAO DEL SUR (DISTRICT 2) | Region X | Region X | On-Going | ₱28.9M | 92% | High risk95 | —-0.003 |
| 2 | 25K00024REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES MAGANDING BR. 2 (B02109MN) ALONG MAHARLIKA HIGHWAY( COTABATO-MALABANG-LANAO DEL NORTE RD) | Region X | Region X | On-Going | ₱14.3M | 100% | Medium risk47 | —-0.036 |
| 3 | 25K00189CONSTRUCTION OF DRAINAGE STRUCTURE, BUTIG, LANAO DEL SUR | Region X | Region X | On-Going | ₱9.9M | 80% | Medium risk45 | —-0.039 |
| 4 | 25K00137CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BALUT, BACOLOD-KALAWI, LANAO DEL SUR | Region X | Region X | On-Going | ₱4.9M | 91% | Medium risk45 | —-0.059 |
| 5 | 25K00134CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PINDOLONAN I, TUGAYA, LANAO DEL SUR | Region X | Region X | On-Going | ₱7.4M | 100% | Medium risk45 | —-0.066 |
| 6 | 25K00150CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY LUMBAC, TUGAYA, LANAO DEL SUR | Region X | Region X | On-Going | ₱7.4M | 100% | Medium risk45 | —-0.066 |