Contractor dossier
738 projects on file, including joint ventures this contractor is part of.
Total projects
738
Total budget
₱66.7B
Average progress
95.3%
Completion rate
74.4%
Average risk score
54.4
Medium risk on average, out of 100
Flagged as unusual
49
6.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 718 | ₱63.7B | 54.4 | 49 | 95.2% |
| Region XIII | 13 | ₱1.8B | 50.9 | 0 | 100.0% |
| Central Office | 4 | ₱857.9M | 54.2 | 0 | 100.0% |
| Region VII | 3 | ₱327.6M | 58.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 476 | ₱44.3B | 52.2 | 3 | 96.3% |
| Bridges | 120 | ₱5.9B | 48.9 | 4 | 95.8% |
| Flood Control and Drainage | 71 | ₱6.8B | 55.9 | 4 | 96.4% |
| OTHER | 40 | ₱5.8B | 77.7 | 25 | 96.1% |
| GAA 2025 OO-1 | 12 | ₱1.4B | 93.4 | 11 | 55.4% |
| Bridges, Roads | 12 | ₱1.9B | 59.2 | 0 | 100.0% |
| Buildings and Facilities | 4 | ₱238.2M | 51.9 | 0 | 79.2% |
| GAA 2025 SSP | 2 | ₱283.6M | 95.7 | 2 | 22.9% |
| GAA 2025 OO-2 | 1 | ₱47.5M | 89.1 | 0 | 72.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25K00398CONSTRUCTION OF ACCESS ROAD LEADING TO CONFLICT AFFECTED AREAS, CANAYAN-MANALOG SECTION, PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱141.8M | 46% | High risk96 | Flagged0.031 |
| 25K00197CONSTRUCTION OF JCT. CAMP KIBARITAN-PANGANTUCAN - JCT GUINOYURAN-VALENCIA ROAD, PACKAGE 11, BUKIDNON | Region X | Region X | On-Going | ₱141.8M | 0% | High risk96 | Flagged0.043 |
| 25KC0131PREVENTIVE MAINTENANCE ALONG JCT. SH-AGLAYAN-ALANIB-TICALAAN ROAD (TICALAAN-PAGANAN SECT.) - K1509+079-K1514+169, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱94.5M | 52% | High risk94 | Flagged0.009 |
| 25KC0101PREVENTIVE MAINTENANCE ALONG JCT. SH AGLAYAN-ALANIB-TICALAAN ROAD (TICALAAN-PAGANAN SECT.) K1503+200-K1504+754, K1506+910-K1507+000, K1507+000-K1508+000, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱95.1M | 50% | High risk94 | Flagged0.011 |
| 25KC0129PREVENTIVE MAINTENANCE ALONG JCT. SH-AGLAYAN-ALANIB-TICALAAN ROAD (TICALAAN-PAGANAN SECT.) K1504+754 - K1506+910, K1508+000 - K1508+364, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱94.5M | 49% | High risk94 | Flagged0.011 |
| 25K00084CONSTRUCTION OF BY-PASS AND DIVERSION ROADS MANGIMA-AGUSAN CANYON BYPASS ROAD, BUKIDNON | Region X | Region X | On-Going | ₱94.5M | 44% | High risk94 | Flagged0.011 |
| 25K00162CONST. OF BY-PASS AND DIVERSION ROADS - SAYRE HIGHWAY PARALLEL ROAD II (IMPASUG-ONG - MALAYBALAY CITY SECTION), PACKAGE 60, BUKIDNON | Region X | Region X | On-Going | ₱66.1M | 38% | High risk93 | Flagged0.007 |
| 25K00253ROAD WIDENING-SECONDARY ROADS, SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY RD-COTABATO BDRY) - K1580 + 000 - K1581 + 423 | Region X | Region X | On-Going | ₱64.2M | 99% | High risk93 | —-0.009 |
| 25K00083CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CONSTRUCTION OF MANGIMA-AGUSAN CANYON BYPASS ROAD, PACKAGE 3, BUKIDNON | Region X | Region X | On-Going | ₱189M | 31% | High risk93 | Flagged0.031 |
| 25K00339CONST. OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 26, BUKIDNON | Region X | Region X | On-Going | ₱174.9M | 67% | High risk93 | Flagged0.023 |
| 25K00044CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 24, BUKIDNON | Region X | Region X | On-Going | ₱179.6M | 70% | High risk93 | Flagged0.023 |
| 25K00148PREVENTIVE MAINTENANCE-TERTIARY ROADS JCT SH AGLAYAN-ZAMBOANGUITA RD - K1544 + 119 - K1549 + 109, K1554 + 462 - K1555 + 000, K1556 + 000 - K1557 + 029, K1564 + 146 - K1564 + 841.53 | Region X | Region X | On-Going | ₱155.3M | 60% | High risk93 | Flagged0.022 |
| 25K00096CONST. OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD II (VALENCIA CITY SECTION), PACKAGE 59, BUKIDNON | Region X | Region X | On-Going | ₱99.2M | 54% | High risk93 | Flagged0.012 |
| 25K00057CONSTRUCTION OF BY-PASS AND DIVERSION ROADSSAYRE HIGHWAY PARALLEL ROAD II (QUEZON SECTION), PACKAGE 50, BUKIDNON | Region X | Region X | On-Going | ₱111.3M | 51% | High risk93 | Flagged0.013 |
| 25KN0048CONSTRUCTION OF FLOOD CONTROL STRUCTURE, (PULANGUI RIVER), PULANGUI RIS, VALENCIA CITY, BUKIDNON | Region X | Bukidnon 4th DEO | On-Going | ₱47.5M | 72% | High risk89 | —-0.014 |
| 23K00318CONSTRUCTION OF DAMULOG-BAGOR-KADINGILAN BY-PASS ROAD, PACKAGE 4, BUKIDNON | Region X | Region X | On-Going | ₱188.8M | 62% | High risk88 | Flagged0.083 |
| 17N00004CONSTRUCTION OF BY-PASSES/DIVERSION ROADS, INCLUDING ROW DAANG MAHARLIKA (ALTERNATE ROUTE) (NRJ - MAYOR DEMOCRITO D. PLAZA AVEUE - LAS NIEVES - SIBAGAT), PACKAGE 2 (DON FRANCISCO BILAY SECTION) INCLUDING BRIDGE (BILAY BR.), AGUSAN DEL NORTE 1ST LD, BUTUAN | Region XIII | Region XIII | Completed | ₱192.5M | 100% | High risk81 | —-0.006 |
| 24K00282CONSTRUCTION OF ROAD, JCT SH VALENCIA - KAPALONG RD SACRAMENTO VALLEY SECT - MALAYAN - JASAAN - VALDERRAMA - CAPINONAN RD, BUKIDNON | Region X | Region X | On-Going | ₱188.9M | 99% | High risk80 | Flagged0.020 |
| 24K00419CONSTRUCTION OF ROAD, MALAYBALAY CITY - VALENCIA CITY BYPASS LINK ROAD PACKAGE 1, BUKIDNON | Region X | Region X | On-Going | ₱188.9M | 80% | High risk80 | Flagged0.025 |
| 23K00272CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 16, BUKIDNON | Region X | Region X | On-Going | ₱188.8M | 98% | High risk80 | Flagged0.029 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23K00318CONSTRUCTION OF DAMULOG-BAGOR-KADINGILAN BY-PASS ROAD, PACKAGE 4, BUKIDNON | Region X | Region X | On-Going | ₱188.8M | 62% | High risk88 | Flagged0.083 |
| 24K00554CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PULANGUI RIVER, UPSTREAM OF NEW BATANGAN BR., PACKAGE 3, VALENCIA CITY, BUKIDNON | Region X | Region X | On-Going | ₱189M | 57% | High risk72 | Flagged0.056 |
| 24K00520CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITHIN LUMBAYAO (ALONG PULANGI RIVER), BARANGAY LUMBAYAO, SECTION, VALENCIA CITY | Region X | Region X | On-Going | ₱179.5M | 67% | High risk72 | Flagged0.054 |
| 23K00331CONSTRUCTION OF SAYRE HIGHWAY PARALLEL ROAD, MARAMAG SECTION, PACKAGE 1, MARAMAG, BUKIDNON | Region X | Region X | On-Going | ₱188.7M | 16% | High risk65 | Flagged0.053 |
| 24K00535CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG PULANGUI RIVER, UPSTREAM OF NEW BATANGAN BR., PACKAGE 2, VALENCIA CITY, BUKIDNON | Region X | Region X | On-Going | ₱189M | 92% | High risk72 | Flagged0.050 |
| 24K00521CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAAPAG RIVER (CATUMBALON SECTION) (DOWNSTREAM), BARANGAY CATUMBALON, VALENCIA CITY, BUKIDNON | Region X | Region X | On-Going | ₱179.6M | 85% | High risk72 | Flagged0.050 |
| 24K00555CONST. OF BY-PASS AND DIVERSION ROADS, DON CARLOS-KALILANGAN ALTERNATE ROAD, PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱283.5M | 51% | High risk66 | Flagged0.046 |
| 25K00197CONSTRUCTION OF JCT. CAMP KIBARITAN-PANGANTUCAN - JCT GUINOYURAN-VALENCIA ROAD, PACKAGE 11, BUKIDNON | Region X | Region X | On-Going | ₱141.8M | 0% | High risk96 | Flagged0.043 |
| 19K00421RECONSTRUCTION FROM TOTALLY DAMAGED OLD BATANGAN STEEL BRIDGE TO PRE-CAST/ PRE-STRESSED (PCPS) BR. | Region X | Region X | Completed | ₱183.2M | 100% | High risk64 | Flagged0.034 |
| 23K00160CONSTRUCTION OF VALENCIA CITY EAST BY-PASS RD, PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱283.3M | 100% | High risk79 | Flagged0.033 |
| 25K00398CONSTRUCTION OF ACCESS ROAD LEADING TO CONFLICT AFFECTED AREAS, CANAYAN-MANALOG SECTION, PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱141.8M | 46% | High risk96 | Flagged0.031 |
| 25K00083CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CONSTRUCTION OF MANGIMA-AGUSAN CANYON BYPASS ROAD, PACKAGE 3, BUKIDNON | Region X | Region X | On-Going | ₱189M | 31% | High risk93 | Flagged0.031 |
| 23K00272CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 16, BUKIDNON | Region X | Region X | On-Going | ₱188.8M | 98% | High risk80 | Flagged0.029 |
| 24K00419CONSTRUCTION OF ROAD, MALAYBALAY CITY - VALENCIA CITY BYPASS LINK ROAD PACKAGE 1, BUKIDNON | Region X | Region X | On-Going | ₱188.9M | 80% | High risk80 | Flagged0.025 |
| 23K00237CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD II (MANOLO FORTICH-VALENCIA CITY SECTION), PACKAGE 41, BUKIDNON | Region X | Region X | On-Going | ₱188.7M | 100% | High risk79 | Flagged0.025 |
| 25K00339CONST. OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 26, BUKIDNON | Region X | Region X | On-Going | ₱174.9M | 67% | High risk93 | Flagged0.023 |
| 25K00044CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 24, BUKIDNON | Region X | Region X | On-Going | ₱179.6M | 70% | High risk93 | Flagged0.023 |
| 23K00219INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)JCT SARYE HIGHWAY DALIRIG-KISOLON BYPASS ROAD, PACKAGE 9, BUKIDNON | Region X | Region X | On-Going | ₱145.2M | 98% | High risk79 | Flagged0.023 |
| 24K00416CONSTRUCTION OF BYPASS ROAD EXTENSION (SUGOD-KAHAPONAN SECTION), BUKIDNON, PACKAGE 10 | Region X | Region X | On-Going | ₱179.5M | 82% | High risk79 | Flagged0.022 |
| 25K00148PREVENTIVE MAINTENANCE-TERTIARY ROADS JCT SH AGLAYAN-ZAMBOANGUITA RD - K1544 + 119 - K1549 + 109, K1554 + 462 - K1555 + 000, K1556 + 000 - K1557 + 029, K1564 + 146 - K1564 + 841.53 | Region X | Region X | On-Going | ₱155.3M | 60% | High risk93 | Flagged0.022 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 276 | 19K00216CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, VALENCIA BY-PASS ROAD EXTENSION, PACKAGE 4, BUKIDNON | Region X | Region X | Completed | ₱105.2M | 100% | Medium risk56 | —-0.078 |
| 277 | 23K00218CONSTRUCTION OF BYPASS ROAD AND DIVERSION ROADS ,SAYRE HIGHWAY PARALLEL ROAD II (MANOLO FORTICH-VALENCIA CITY SECTION), PACKAGE 36, BUKIDNON | Region X | Region X | Completed | ₱113.3M | 100% | Medium risk56 | —-0.071 |
| 278 | 24K00291PREVENTIVE MAINTENANCE - PRIMARY ROADS SAYRE HIGHWAY K1519 + 285 - K1522 + 000 | Region X | Region X | On-Going | ₱99.7M | 100% | Medium risk56 | —-0.046 |
| 279 | 19KA0015PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ON SPECIFIC LOCATIONS ALONG JCT SH-AGLAYAN-ALANIB-TICALAAN RD (AGLAYAN-BASAK) (S00633MN) K1518 + (-195) TO K1526 + 102MALAYBALAY CITY, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱96.5M | 100% | Medium risk56 | —-0.081 |
| 280 | 23K00094CONST. OF BY_PASS AND DIVERSION ROADS , JCT. SAYRE HIGHWAY DALIRIG - KISOLON BY-PASS ROAD, PACKAGE 8, BUKIDNON | Region X | Region X | Completed | ₱113.2M | 100% | Medium risk56 | —-0.071 |
| 281 | 18K00138PREVENTIVE MAINTENANCE OF BUKIDNON-DAVAO CITY RD-K1573+382-K1578+322,K1578+368-K1578+423, BUKIDNON | Region X | Region X | Completed | ₱114.8M | 100% | Medium risk56 | —-0.082 |
| 282 | 24K00488PREVENTIVE MAINTENANCE-PRIMARY ROADS, SAYRE HIGHWAY K1475+006-K1475+426, K1475+455-K1476+027, K1479+000-K1480+000, K1480+1882-K1482+205, K1502+000-K1503+000,K1518+(-182)-K1518+000,K1519+283-K1520+000,K1522+000-K1522+568, K1525+109-K1525+207 | Central Office | Roads Management Cluster I (Bilateral) | On-Going | ₱289.5M | 100% | Medium risk56 | —-0.025 |
| 283 | 25K00204PREVENTIVE MAINTENANCE-TERTIARY ROADS ,JCT SAYRE H-WAY-IMPASUGONG-PATULANGAN BY-PASS RD - K1480 + 028 - K1483 + 010, K1484 + 095 - K1487 + 719 | Region X | Region X | On-Going | ₱112.9M | 100% | Medium risk56 | —-0.050 |
| 284 | 23K00012ROAD WIDENING-PRIMARY ROADS SAYRE HIGHWAY - K1450 + 000 - K1451 + 806, K1451 + 873 - K1452 + 844 | Region X | Region X | On-Going | ₱111.9M | 100% | Medium risk56 | —-0.036 |
| 285 | 24K00361PREVENTIVE MAINTENANCE-PRIMARY ROADS, SAYRE HIGHWAY-K1482+432-K1483+000,K1483+659-K1487+000 | Region X | Region X | On-Going | ₱108.4M | 100% | Medium risk56 | —-0.045 |
| 286 | 20K00221CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 11, BUKIDNON | Region X | Region X | Completed | ₱109.9M | 100% | Medium risk56 | —-0.076 |
| 287 | 23K00033ROAD WIDENING-PRIMARY ROADS,SAYRE HIGHWAY - K1468 + 250 - K1470 + 575 | Region X | Region X | Completed | ₱100.7M | 100% | Medium risk56 | —-0.067 |
| 288 | 23KC0058REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG SAYRE HIGHWAY - K1466+900-K1467+024, SUMILAO, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱96.5M | 100% | Medium risk56 | —-0.079 |
| 289 | 22K00067CONSTRUCTION OF BYPASS & DIVERSION ROADS, JCT. SAYRE HIGHWAY DALIRIG-KISOLON BYPASS ROAD, PACKAGE 7, BUKIDNON | Region X | Region X | Completed | ₱96.5M | 100% | Medium risk56 | —-0.079 |
| 290 | 23KC0052REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG SAYRE HIGHWAY - K1467+024-K1467+148, SUMILAO, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱96.5M | 100% | Medium risk56 | —-0.079 |
| 291 | 18KC0038CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - SAYRE HIGHWAY- K1465+616-K1465+666, K1465+700-K1465+740, SUMILAO, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱96.5M | 100% | Medium risk56 | —-0.081 |
| 292 | 18KC0032RECONST. FROM PAVED TO CONCRETE - SAYRE HIGHWAY - K1439+930-K1441+358, K1444+928-K1445+067, K1457+380-K1457+566, K1461+804-K1463+002, K1465+215-K1465+394, K1465+421-K1466+000, K1467+771-K1468+023, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱96.5M | 100% | Medium risk56 | —-0.081 |
| 293 | 20KC0049PREVENTIVE MAINTENANCE ALONG SAYRE HIGHWAY K1466+000-K1467+136, K1468+882-K1470+026, SUMILAO, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱96.5M | 100% | Medium risk56 | —-0.082 |
| 294 | 20HF0009REHABILITATION OF CEBU-BALAMBAN-TRANSCENTRAL HIGHWAY WITH SLIPS, SOIL COLLAPSE AND LANDSLIDE, K0038+201-K0038+430, BRGY. CANSOMOROY, BALAMBAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱91.4M | 100% | Medium risk56 | —-0.085 |
| 295 | 20HF0010REHABILITATION OF CEBU-BALAMBAN-TRANSCENTRAL HIGHWAY WITH SLIPS, SOIL COLLAPSE AND LANDSLIDE, K0039+360-K0039+545, BRGY. CANSOMOROY, BALAMBAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱91.4M | 100% | Medium risk56 | —-0.085 |
| 296 | 25K00212PREVENTIVE MAINTENANCE-PRIMARY ROADS SAYRE HIGHWAY - K1476 + 027 - K1479 + 010, K1480 + 006 - K1480 + 874, K1480 + 915 - K1481 + 883 | Region X | Region X | On-Going | ₱104.9M | 76% | Medium risk56 | —-0.042 |
| 297 | 22K00053CONSTRUCTION OF BYPASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD I (LIBONA-MANOLO FORTICH-IMPASUG-ONG SECTION), PACKAGE 19, BUKIDNON | Region X | Region X | Completed | ₱101.4M | 100% | Medium risk56 | —-0.071 |
| 298 | 19KA0030ROAD WIDENING - ON SPECIFIC LOCATIONS ALONG SAYRE HIGHWAY (S00639MN) K1490 + 122 TO K1492 + 637, MALAYBALAY CITY, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱96.5M | 100% | Medium risk56 | —-0.081 |
| 299 | 22K00069CONSTRUCTION OF BYPASS & DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD I (LIBONA-MANOLO FORTICH-IMPASUG-ONG SECTION), PACKAGE 13, BUKIDNON | Region X | Region X | Completed | ₱106.4M | 100% | Medium risk56 | —-0.063 |
| 300 | 21K00008CONST. OF BYPASS & DIVERSION ROADS, SAYRE PARALLEL RD II (MALAYBALAY-IMPASUG-ONG SECTION),PACKAGE 24 | Region X | Region X | Completed | ₱92.8M | 100% | Medium risk56 | —-0.079 |