Contractor dossier
738 projects on file, including joint ventures this contractor is part of.
Total projects
738
Total budget
₱66.7B
Average progress
95.3%
Completion rate
74.4%
Average risk score
54.4
Medium risk on average, out of 100
Flagged as unusual
49
6.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 718 | ₱63.7B | 54.4 | 49 | 95.2% |
| Region XIII | 13 | ₱1.8B | 50.9 | 0 | 100.0% |
| Central Office | 4 | ₱857.9M | 54.2 | 0 | 100.0% |
| Region VII | 3 | ₱327.6M | 58.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 476 | ₱44.3B | 52.2 | 3 | 96.3% |
| Bridges | 120 | ₱5.9B | 48.9 | 4 | 95.8% |
| Flood Control and Drainage | 71 | ₱6.8B | 55.9 | 4 | 96.4% |
| OTHER | 40 | ₱5.8B | 77.7 | 25 | 96.1% |
| GAA 2025 OO-1 | 12 | ₱1.4B | 93.4 | 11 | 55.4% |
| Bridges, Roads | 12 | ₱1.9B | 59.2 | 0 | 100.0% |
| Buildings and Facilities | 4 | ₱238.2M | 51.9 | 0 | 79.2% |
| GAA 2025 SSP | 2 | ₱283.6M | 95.7 | 2 | 22.9% |
| GAA 2025 OO-2 | 1 | ₱47.5M | 89.1 | 0 | 72.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25K00398CONSTRUCTION OF ACCESS ROAD LEADING TO CONFLICT AFFECTED AREAS, CANAYAN-MANALOG SECTION, PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱141.8M | 46% | High risk96 | Flagged0.031 |
| 25K00197CONSTRUCTION OF JCT. CAMP KIBARITAN-PANGANTUCAN - JCT GUINOYURAN-VALENCIA ROAD, PACKAGE 11, BUKIDNON | Region X | Region X | On-Going | ₱141.8M | 0% | High risk96 | Flagged0.043 |
| 25KC0131PREVENTIVE MAINTENANCE ALONG JCT. SH-AGLAYAN-ALANIB-TICALAAN ROAD (TICALAAN-PAGANAN SECT.) - K1509+079-K1514+169, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱94.5M | 52% | High risk94 | Flagged0.009 |
| 25KC0101PREVENTIVE MAINTENANCE ALONG JCT. SH AGLAYAN-ALANIB-TICALAAN ROAD (TICALAAN-PAGANAN SECT.) K1503+200-K1504+754, K1506+910-K1507+000, K1507+000-K1508+000, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱95.1M | 50% | High risk94 | Flagged0.011 |
| 25KC0129PREVENTIVE MAINTENANCE ALONG JCT. SH-AGLAYAN-ALANIB-TICALAAN ROAD (TICALAAN-PAGANAN SECT.) K1504+754 - K1506+910, K1508+000 - K1508+364, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱94.5M | 49% | High risk94 | Flagged0.011 |
| 25K00084CONSTRUCTION OF BY-PASS AND DIVERSION ROADS MANGIMA-AGUSAN CANYON BYPASS ROAD, BUKIDNON | Region X | Region X | On-Going | ₱94.5M | 44% | High risk94 | Flagged0.011 |
| 25K00162CONST. OF BY-PASS AND DIVERSION ROADS - SAYRE HIGHWAY PARALLEL ROAD II (IMPASUG-ONG - MALAYBALAY CITY SECTION), PACKAGE 60, BUKIDNON | Region X | Region X | On-Going | ₱66.1M | 38% | High risk93 | Flagged0.007 |
| 25K00253ROAD WIDENING-SECONDARY ROADS, SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY RD-COTABATO BDRY) - K1580 + 000 - K1581 + 423 | Region X | Region X | On-Going | ₱64.2M | 99% | High risk93 | —-0.009 |
| 25K00083CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CONSTRUCTION OF MANGIMA-AGUSAN CANYON BYPASS ROAD, PACKAGE 3, BUKIDNON | Region X | Region X | On-Going | ₱189M | 31% | High risk93 | Flagged0.031 |
| 25K00339CONST. OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 26, BUKIDNON | Region X | Region X | On-Going | ₱174.9M | 67% | High risk93 | Flagged0.023 |
| 25K00044CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 24, BUKIDNON | Region X | Region X | On-Going | ₱179.6M | 70% | High risk93 | Flagged0.023 |
| 25K00148PREVENTIVE MAINTENANCE-TERTIARY ROADS JCT SH AGLAYAN-ZAMBOANGUITA RD - K1544 + 119 - K1549 + 109, K1554 + 462 - K1555 + 000, K1556 + 000 - K1557 + 029, K1564 + 146 - K1564 + 841.53 | Region X | Region X | On-Going | ₱155.3M | 60% | High risk93 | Flagged0.022 |
| 25K00096CONST. OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD II (VALENCIA CITY SECTION), PACKAGE 59, BUKIDNON | Region X | Region X | On-Going | ₱99.2M | 54% | High risk93 | Flagged0.012 |
| 25K00057CONSTRUCTION OF BY-PASS AND DIVERSION ROADSSAYRE HIGHWAY PARALLEL ROAD II (QUEZON SECTION), PACKAGE 50, BUKIDNON | Region X | Region X | On-Going | ₱111.3M | 51% | High risk93 | Flagged0.013 |
| 25KN0048CONSTRUCTION OF FLOOD CONTROL STRUCTURE, (PULANGUI RIVER), PULANGUI RIS, VALENCIA CITY, BUKIDNON | Region X | Bukidnon 4th DEO | On-Going | ₱47.5M | 72% | High risk89 | —-0.014 |
| 23K00318CONSTRUCTION OF DAMULOG-BAGOR-KADINGILAN BY-PASS ROAD, PACKAGE 4, BUKIDNON | Region X | Region X | On-Going | ₱188.8M | 62% | High risk88 | Flagged0.083 |
| 17N00004CONSTRUCTION OF BY-PASSES/DIVERSION ROADS, INCLUDING ROW DAANG MAHARLIKA (ALTERNATE ROUTE) (NRJ - MAYOR DEMOCRITO D. PLAZA AVEUE - LAS NIEVES - SIBAGAT), PACKAGE 2 (DON FRANCISCO BILAY SECTION) INCLUDING BRIDGE (BILAY BR.), AGUSAN DEL NORTE 1ST LD, BUTUAN | Region XIII | Region XIII | Completed | ₱192.5M | 100% | High risk81 | —-0.006 |
| 24K00282CONSTRUCTION OF ROAD, JCT SH VALENCIA - KAPALONG RD SACRAMENTO VALLEY SECT - MALAYAN - JASAAN - VALDERRAMA - CAPINONAN RD, BUKIDNON | Region X | Region X | On-Going | ₱188.9M | 99% | High risk80 | Flagged0.020 |
| 24K00419CONSTRUCTION OF ROAD, MALAYBALAY CITY - VALENCIA CITY BYPASS LINK ROAD PACKAGE 1, BUKIDNON | Region X | Region X | On-Going | ₱188.9M | 80% | High risk80 | Flagged0.025 |
| 23K00272CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 16, BUKIDNON | Region X | Region X | On-Going | ₱188.8M | 98% | High risk80 | Flagged0.029 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23K00318CONSTRUCTION OF DAMULOG-BAGOR-KADINGILAN BY-PASS ROAD, PACKAGE 4, BUKIDNON | Region X | Region X | On-Going | ₱188.8M | 62% | High risk88 | Flagged0.083 |
| 24K00554CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PULANGUI RIVER, UPSTREAM OF NEW BATANGAN BR., PACKAGE 3, VALENCIA CITY, BUKIDNON | Region X | Region X | On-Going | ₱189M | 57% | High risk72 | Flagged0.056 |
| 24K00520CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITHIN LUMBAYAO (ALONG PULANGI RIVER), BARANGAY LUMBAYAO, SECTION, VALENCIA CITY | Region X | Region X | On-Going | ₱179.5M | 67% | High risk72 | Flagged0.054 |
| 23K00331CONSTRUCTION OF SAYRE HIGHWAY PARALLEL ROAD, MARAMAG SECTION, PACKAGE 1, MARAMAG, BUKIDNON | Region X | Region X | On-Going | ₱188.7M | 16% | High risk65 | Flagged0.053 |
| 24K00535CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG PULANGUI RIVER, UPSTREAM OF NEW BATANGAN BR., PACKAGE 2, VALENCIA CITY, BUKIDNON | Region X | Region X | On-Going | ₱189M | 92% | High risk72 | Flagged0.050 |
| 24K00521CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAAPAG RIVER (CATUMBALON SECTION) (DOWNSTREAM), BARANGAY CATUMBALON, VALENCIA CITY, BUKIDNON | Region X | Region X | On-Going | ₱179.6M | 85% | High risk72 | Flagged0.050 |
| 24K00555CONST. OF BY-PASS AND DIVERSION ROADS, DON CARLOS-KALILANGAN ALTERNATE ROAD, PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱283.5M | 51% | High risk66 | Flagged0.046 |
| 25K00197CONSTRUCTION OF JCT. CAMP KIBARITAN-PANGANTUCAN - JCT GUINOYURAN-VALENCIA ROAD, PACKAGE 11, BUKIDNON | Region X | Region X | On-Going | ₱141.8M | 0% | High risk96 | Flagged0.043 |
| 19K00421RECONSTRUCTION FROM TOTALLY DAMAGED OLD BATANGAN STEEL BRIDGE TO PRE-CAST/ PRE-STRESSED (PCPS) BR. | Region X | Region X | Completed | ₱183.2M | 100% | High risk64 | Flagged0.034 |
| 23K00160CONSTRUCTION OF VALENCIA CITY EAST BY-PASS RD, PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱283.3M | 100% | High risk79 | Flagged0.033 |
| 25K00398CONSTRUCTION OF ACCESS ROAD LEADING TO CONFLICT AFFECTED AREAS, CANAYAN-MANALOG SECTION, PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱141.8M | 46% | High risk96 | Flagged0.031 |
| 25K00083CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CONSTRUCTION OF MANGIMA-AGUSAN CANYON BYPASS ROAD, PACKAGE 3, BUKIDNON | Region X | Region X | On-Going | ₱189M | 31% | High risk93 | Flagged0.031 |
| 23K00272CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 16, BUKIDNON | Region X | Region X | On-Going | ₱188.8M | 98% | High risk80 | Flagged0.029 |
| 24K00419CONSTRUCTION OF ROAD, MALAYBALAY CITY - VALENCIA CITY BYPASS LINK ROAD PACKAGE 1, BUKIDNON | Region X | Region X | On-Going | ₱188.9M | 80% | High risk80 | Flagged0.025 |
| 23K00237CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD II (MANOLO FORTICH-VALENCIA CITY SECTION), PACKAGE 41, BUKIDNON | Region X | Region X | On-Going | ₱188.7M | 100% | High risk79 | Flagged0.025 |
| 25K00339CONST. OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 26, BUKIDNON | Region X | Region X | On-Going | ₱174.9M | 67% | High risk93 | Flagged0.023 |
| 25K00044CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 24, BUKIDNON | Region X | Region X | On-Going | ₱179.6M | 70% | High risk93 | Flagged0.023 |
| 23K00219INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)JCT SARYE HIGHWAY DALIRIG-KISOLON BYPASS ROAD, PACKAGE 9, BUKIDNON | Region X | Region X | On-Going | ₱145.2M | 98% | High risk79 | Flagged0.023 |
| 24K00416CONSTRUCTION OF BYPASS ROAD EXTENSION (SUGOD-KAHAPONAN SECTION), BUKIDNON, PACKAGE 10 | Region X | Region X | On-Going | ₱179.5M | 82% | High risk79 | Flagged0.022 |
| 25K00148PREVENTIVE MAINTENANCE-TERTIARY ROADS JCT SH AGLAYAN-ZAMBOANGUITA RD - K1544 + 119 - K1549 + 109, K1554 + 462 - K1555 + 000, K1556 + 000 - K1557 + 029, K1564 + 146 - K1564 + 841.53 | Region X | Region X | On-Going | ₱155.3M | 60% | High risk93 | Flagged0.022 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 351 | 23KB0046REHABILITATION/RECONSTRUCTION/UPGRADING/UPGRADING OF DAMAGED PAVED ROADS ALONG SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BOUNDARY), K1585+717-K1587+000, K1602+000-K1602+480, K1606+220-K1606+315, SPRING (KIBAWE) TO OMONAY (DAMULOG), BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱78.8M | 100% | Medium risk52 | —-0.080 |
| 352 | 24KB0134PREVENTIVE MAINTENANCE ALONG BUKIDNON-DAVAO CITY ROAD, K1587+714-K1588+000, K1589+443-K1590+111, K1590+126-K1590+380, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱85.9M | 100% | Medium risk52 | —-0.080 |
| 353 | 19KB0001PREVENTIVE MAINTENANCE: ASPHALT OVERLAY ALONG BUKIDNON-DAVAO CITY ROAD, KM 1563+(-728)-KM 1564+255, CAMP I, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱84.1M | 100% | Medium risk52 | —-0.082 |
| 354 | 19KB0008PREVENTIVE MAINTENANCE: ASPHALT OVERLAY ALONG SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY ROAD-COTABATO BOUNDARY), K1573+000-K1573+382, K1574+782-K1578+000, KITAOTAO - DANGCAGAN SECTION, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱79M | 100% | Medium risk52 | —-0.082 |
| 355 | 17K00323CLUSTER D WIDENING OF VARIOUS PERM. BR TO MORE THAN 2 LANES ALONG BUK-DAVAO CITY ROAD,BUK 3RD LD | Region X | Region X | Completed | ₱100.6M | 100% | Medium risk52 | —-0.007 |
| 356 | 24K00096PREVENTIVE MAINTENANCE-PRIMARY ROADS BUKIDNON-DAVAO CITY ROAD-K1617+900-K1620+674 | Region X | Region X | Completed | ₱65M | 100% | Medium risk52 | —-0.084 |
| 357 | 20KC0032ROAD WIDENING ALONG KIBAWE-KADINGILAN-KALILANGAN ROAD K1608+702-K1611+103, PANGANTUCAN, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱81.5M | 100% | Medium risk52 | —-0.080 |
| 358 | 24KB0030ROAD WIDENING ALONG DON CARLOS-KADINGILAN RD, K1574+000-K1574+496, K1574+538-K1575+511, SAN NICOLAS, DON CARLOS, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱71.3M | 100% | Medium risk52 | —-0.046 |
| 359 | 24KB0038ROAD WIDENING ALONG MARAMAG-MARADUGAO RD, K1565+000-K1567+000, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱77.9M | 94% | Medium risk52 | —-0.042 |
| 360 | 22KB0037ROAD WIDENING ALONG BUKIDNON-DAVAO CITY ROAD, K1576+465-K1578+000, BRGY LIBERTAD, QUEZON (NEAR QUEZON MUNICIPAL HALL), BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱79.1M | 100% | Medium risk52 | —-0.080 |
| 361 | 19KB0003PREVENTIVE MAINTENANCE: ASPHALT OVERLAY ON SPECIFIC LOCATION ALONG BUKIDNON-DAVAO CITY ROAD, K1568+000-K1570+000 | Region X | Bukidnon 2nd DEO | Completed | ₱86.6M | 100% | Medium risk52 | —-0.081 |
| 362 | 19KB0005PREVENTIVE MAINTENANCE: ASPHALT OVERLAY ON SPECIFIC LOCATION ALONG SAYRE HIGHWAY, K1547+000-K1548+000, K1548+580-K1550+260 | Region X | Bukidnon 2nd DEO | Completed | ₱87.9M | 100% | Medium risk52 | —-0.081 |
| 363 | 20KB0066ROAD WIDENING PRIMARY ROADS ALONG SAYRE HIGHWAY, K1559+000-K1561+000, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱81.6M | 100% | Medium risk52 | —-0.081 |
| 364 | 19KB0002PREVENTIVE MAINTENANCE: ASPHALT OVERLAY ON SPECIFIC LOCATION ALONG BUKIDNON-DAVAO CITY ROAD, K1564+255-K1565+107, K1566+894-K1567+595, K1567+621-K1568+000 | Region X | Bukidnon 2nd DEO | Completed | ₱82.4M | 100% | Medium risk52 | —-0.081 |
| 365 | 23KB0013ROAD WIDENING ALONG SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY ROAD-COTABATO BOUNDARY), K1563+(-592) - K1564+000, DON CARLOS, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱76.4M | 100% | Medium risk52 | —-0.082 |
| 366 | 18KB0021PREVENTIVE MAINTENANCE ALONG SAYRE HIGHWAY, K1556+374-K1559+000, K1559+714-K1560+000, POBLACION MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱77.8M | 100% | Medium risk52 | —-0.083 |
| 367 | 19KB0006PREVENTIVE MAINTENANCE: ASPHALT OVERLAY ON SPECIFIC LOCATION ALONG SAYRE HIGHWAY, K1555+272-K1556+374, K1559+000-K1559+714, ANAHAWON, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱73.7M | 100% | Medium risk52 | —-0.084 |
| 368 | 22KA0086ROAD WIDENING ALONG KAPALONG-TALAINGOD-VALENCIA (BUKIDNON) RD K1591+212-K1592+000, 1593+770-1594+790, VALENCIA CITY, BUKIDNON BRGY. LUMBAYAO, VALENCIA CITY, BUKIDNON 4TH LD | Region X | Bukidnon 1st DEO | Completed | ₱72.6M | 100% | Medium risk52 | —-0.078 |
| 369 | 23KB0009ROAD WIDENING ALONG SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY ROAD-COTABATO BOUNDARY), K1564+000-K1566+000, SINANGGUYAN, DON CARLOS, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱70.9M | 100% | Medium risk52 | —-0.083 |
| 370 | 22K00342CONSTRUCTION OF DIVERSION ROAD, SAYRE HIGHWAY (JCT. BUKIDNON - DAVAO CITY RD - COTABATO BDRY) - KITAOTAO - MALOBALO - KAUYONAN - BOBONG - NEW VISAYAS - SALVACION - KADINGILIAN - DON CARLOS-KADINGILAN RD, BUKIDNON (KITAOTAO SECTION), PACKAGE 1 | Region X | Region X | Completed | ₱70.2M | 100% | Medium risk52 | —-0.084 |
| 371 | 18KB0043ROAD WIDENING ALONG DON CARLOS-KADINGILAN ROAD, POB DON CARLOS-SAN NICOLAS SECTION, DON CARLOS, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱63.4M | 100% | Medium risk52 | —-0.088 |
| 372 | 20KA0011ROAD WIDENING - ALONG JCT. SH AGLAYAN - ZAMBOANGUITA ROAD (S00631MN)K1525 +500 -K1527+960MALAYBALAY CITY, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱77.2M | 100% | Medium risk52 | —-0.076 |
| 373 | 24K00043CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, JCT. WAO-BANISILAN ROAD-JCT. KALILANGAN-LAMPANUSAN ROAD, PACKAGE 6, BUKIDNON | Region X | Region X | On-Going | ₱56.5M | 100% | Medium risk52 | —-0.055 |
| 374 | 22KB0025ROAD WIDENING ALONG KIBAWE-KADINGILAN-KALILANGAN ROAD, K1593+098 - K1595+000, POBLACION KADINGILAN, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱62.9M | 100% | Medium risk52 | —-0.087 |
| 375 | 18KB0053REHAB/RECONST/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) OF DON CARLOS-KADINGILAN ROAD, K1572+443-K1573+000, K1576+350-K1577+831, SAN NICOLAS-CALAOCALAO SEC | Region X | Bukidnon 2nd DEO | Completed | ₱56.1M | 100% | Medium risk52 | —-0.088 |