Contractor dossier
738 projects on file, including joint ventures this contractor is part of.
Total projects
738
Total budget
₱66.7B
Average progress
95.3%
Completion rate
74.4%
Average risk score
54.4
Medium risk on average, out of 100
Flagged as unusual
49
6.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 718 | ₱63.7B | 54.4 | 49 | 95.2% |
| Region XIII | 13 | ₱1.8B | 50.9 | 0 | 100.0% |
| Central Office | 4 | ₱857.9M | 54.2 | 0 | 100.0% |
| Region VII | 3 | ₱327.6M | 58.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 476 | ₱44.3B | 52.2 | 3 | 96.3% |
| Bridges | 120 | ₱5.9B | 48.9 | 4 | 95.8% |
| Flood Control and Drainage | 71 | ₱6.8B | 55.9 | 4 | 96.4% |
| OTHER | 40 | ₱5.8B | 77.7 | 25 | 96.1% |
| GAA 2025 OO-1 | 12 | ₱1.4B | 93.4 | 11 | 55.4% |
| Bridges, Roads | 12 | ₱1.9B | 59.2 | 0 | 100.0% |
| Buildings and Facilities | 4 | ₱238.2M | 51.9 | 0 | 79.2% |
| GAA 2025 SSP | 2 | ₱283.6M | 95.7 | 2 | 22.9% |
| GAA 2025 OO-2 | 1 | ₱47.5M | 89.1 | 0 | 72.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25K00398CONSTRUCTION OF ACCESS ROAD LEADING TO CONFLICT AFFECTED AREAS, CANAYAN-MANALOG SECTION, PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱141.8M | 46% | High risk96 | Flagged0.031 |
| 25K00197CONSTRUCTION OF JCT. CAMP KIBARITAN-PANGANTUCAN - JCT GUINOYURAN-VALENCIA ROAD, PACKAGE 11, BUKIDNON | Region X | Region X | On-Going | ₱141.8M | 0% | High risk96 | Flagged0.043 |
| 25KC0131PREVENTIVE MAINTENANCE ALONG JCT. SH-AGLAYAN-ALANIB-TICALAAN ROAD (TICALAAN-PAGANAN SECT.) - K1509+079-K1514+169, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱94.5M | 52% | High risk94 | Flagged0.009 |
| 25KC0101PREVENTIVE MAINTENANCE ALONG JCT. SH AGLAYAN-ALANIB-TICALAAN ROAD (TICALAAN-PAGANAN SECT.) K1503+200-K1504+754, K1506+910-K1507+000, K1507+000-K1508+000, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱95.1M | 50% | High risk94 | Flagged0.011 |
| 25KC0129PREVENTIVE MAINTENANCE ALONG JCT. SH-AGLAYAN-ALANIB-TICALAAN ROAD (TICALAAN-PAGANAN SECT.) K1504+754 - K1506+910, K1508+000 - K1508+364, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱94.5M | 49% | High risk94 | Flagged0.011 |
| 25K00084CONSTRUCTION OF BY-PASS AND DIVERSION ROADS MANGIMA-AGUSAN CANYON BYPASS ROAD, BUKIDNON | Region X | Region X | On-Going | ₱94.5M | 44% | High risk94 | Flagged0.011 |
| 25K00162CONST. OF BY-PASS AND DIVERSION ROADS - SAYRE HIGHWAY PARALLEL ROAD II (IMPASUG-ONG - MALAYBALAY CITY SECTION), PACKAGE 60, BUKIDNON | Region X | Region X | On-Going | ₱66.1M | 38% | High risk93 | Flagged0.007 |
| 25K00253ROAD WIDENING-SECONDARY ROADS, SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY RD-COTABATO BDRY) - K1580 + 000 - K1581 + 423 | Region X | Region X | On-Going | ₱64.2M | 99% | High risk93 | —-0.009 |
| 25K00083CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CONSTRUCTION OF MANGIMA-AGUSAN CANYON BYPASS ROAD, PACKAGE 3, BUKIDNON | Region X | Region X | On-Going | ₱189M | 31% | High risk93 | Flagged0.031 |
| 25K00339CONST. OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 26, BUKIDNON | Region X | Region X | On-Going | ₱174.9M | 67% | High risk93 | Flagged0.023 |
| 25K00044CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 24, BUKIDNON | Region X | Region X | On-Going | ₱179.6M | 70% | High risk93 | Flagged0.023 |
| 25K00148PREVENTIVE MAINTENANCE-TERTIARY ROADS JCT SH AGLAYAN-ZAMBOANGUITA RD - K1544 + 119 - K1549 + 109, K1554 + 462 - K1555 + 000, K1556 + 000 - K1557 + 029, K1564 + 146 - K1564 + 841.53 | Region X | Region X | On-Going | ₱155.3M | 60% | High risk93 | Flagged0.022 |
| 25K00096CONST. OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD II (VALENCIA CITY SECTION), PACKAGE 59, BUKIDNON | Region X | Region X | On-Going | ₱99.2M | 54% | High risk93 | Flagged0.012 |
| 25K00057CONSTRUCTION OF BY-PASS AND DIVERSION ROADSSAYRE HIGHWAY PARALLEL ROAD II (QUEZON SECTION), PACKAGE 50, BUKIDNON | Region X | Region X | On-Going | ₱111.3M | 51% | High risk93 | Flagged0.013 |
| 25KN0048CONSTRUCTION OF FLOOD CONTROL STRUCTURE, (PULANGUI RIVER), PULANGUI RIS, VALENCIA CITY, BUKIDNON | Region X | Bukidnon 4th DEO | On-Going | ₱47.5M | 72% | High risk89 | —-0.014 |
| 23K00318CONSTRUCTION OF DAMULOG-BAGOR-KADINGILAN BY-PASS ROAD, PACKAGE 4, BUKIDNON | Region X | Region X | On-Going | ₱188.8M | 62% | High risk88 | Flagged0.083 |
| 17N00004CONSTRUCTION OF BY-PASSES/DIVERSION ROADS, INCLUDING ROW DAANG MAHARLIKA (ALTERNATE ROUTE) (NRJ - MAYOR DEMOCRITO D. PLAZA AVEUE - LAS NIEVES - SIBAGAT), PACKAGE 2 (DON FRANCISCO BILAY SECTION) INCLUDING BRIDGE (BILAY BR.), AGUSAN DEL NORTE 1ST LD, BUTUAN | Region XIII | Region XIII | Completed | ₱192.5M | 100% | High risk81 | —-0.006 |
| 24K00282CONSTRUCTION OF ROAD, JCT SH VALENCIA - KAPALONG RD SACRAMENTO VALLEY SECT - MALAYAN - JASAAN - VALDERRAMA - CAPINONAN RD, BUKIDNON | Region X | Region X | On-Going | ₱188.9M | 99% | High risk80 | Flagged0.020 |
| 24K00419CONSTRUCTION OF ROAD, MALAYBALAY CITY - VALENCIA CITY BYPASS LINK ROAD PACKAGE 1, BUKIDNON | Region X | Region X | On-Going | ₱188.9M | 80% | High risk80 | Flagged0.025 |
| 23K00272CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 16, BUKIDNON | Region X | Region X | On-Going | ₱188.8M | 98% | High risk80 | Flagged0.029 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23K00318CONSTRUCTION OF DAMULOG-BAGOR-KADINGILAN BY-PASS ROAD, PACKAGE 4, BUKIDNON | Region X | Region X | On-Going | ₱188.8M | 62% | High risk88 | Flagged0.083 |
| 24K00554CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PULANGUI RIVER, UPSTREAM OF NEW BATANGAN BR., PACKAGE 3, VALENCIA CITY, BUKIDNON | Region X | Region X | On-Going | ₱189M | 57% | High risk72 | Flagged0.056 |
| 24K00520CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITHIN LUMBAYAO (ALONG PULANGI RIVER), BARANGAY LUMBAYAO, SECTION, VALENCIA CITY | Region X | Region X | On-Going | ₱179.5M | 67% | High risk72 | Flagged0.054 |
| 23K00331CONSTRUCTION OF SAYRE HIGHWAY PARALLEL ROAD, MARAMAG SECTION, PACKAGE 1, MARAMAG, BUKIDNON | Region X | Region X | On-Going | ₱188.7M | 16% | High risk65 | Flagged0.053 |
| 24K00535CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG PULANGUI RIVER, UPSTREAM OF NEW BATANGAN BR., PACKAGE 2, VALENCIA CITY, BUKIDNON | Region X | Region X | On-Going | ₱189M | 92% | High risk72 | Flagged0.050 |
| 24K00521CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAAPAG RIVER (CATUMBALON SECTION) (DOWNSTREAM), BARANGAY CATUMBALON, VALENCIA CITY, BUKIDNON | Region X | Region X | On-Going | ₱179.6M | 85% | High risk72 | Flagged0.050 |
| 24K00555CONST. OF BY-PASS AND DIVERSION ROADS, DON CARLOS-KALILANGAN ALTERNATE ROAD, PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱283.5M | 51% | High risk66 | Flagged0.046 |
| 25K00197CONSTRUCTION OF JCT. CAMP KIBARITAN-PANGANTUCAN - JCT GUINOYURAN-VALENCIA ROAD, PACKAGE 11, BUKIDNON | Region X | Region X | On-Going | ₱141.8M | 0% | High risk96 | Flagged0.043 |
| 19K00421RECONSTRUCTION FROM TOTALLY DAMAGED OLD BATANGAN STEEL BRIDGE TO PRE-CAST/ PRE-STRESSED (PCPS) BR. | Region X | Region X | Completed | ₱183.2M | 100% | High risk64 | Flagged0.034 |
| 23K00160CONSTRUCTION OF VALENCIA CITY EAST BY-PASS RD, PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱283.3M | 100% | High risk79 | Flagged0.033 |
| 25K00398CONSTRUCTION OF ACCESS ROAD LEADING TO CONFLICT AFFECTED AREAS, CANAYAN-MANALOG SECTION, PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱141.8M | 46% | High risk96 | Flagged0.031 |
| 25K00083CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CONSTRUCTION OF MANGIMA-AGUSAN CANYON BYPASS ROAD, PACKAGE 3, BUKIDNON | Region X | Region X | On-Going | ₱189M | 31% | High risk93 | Flagged0.031 |
| 23K00272CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 16, BUKIDNON | Region X | Region X | On-Going | ₱188.8M | 98% | High risk80 | Flagged0.029 |
| 24K00419CONSTRUCTION OF ROAD, MALAYBALAY CITY - VALENCIA CITY BYPASS LINK ROAD PACKAGE 1, BUKIDNON | Region X | Region X | On-Going | ₱188.9M | 80% | High risk80 | Flagged0.025 |
| 23K00237CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD II (MANOLO FORTICH-VALENCIA CITY SECTION), PACKAGE 41, BUKIDNON | Region X | Region X | On-Going | ₱188.7M | 100% | High risk79 | Flagged0.025 |
| 25K00339CONST. OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 26, BUKIDNON | Region X | Region X | On-Going | ₱174.9M | 67% | High risk93 | Flagged0.023 |
| 25K00044CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 24, BUKIDNON | Region X | Region X | On-Going | ₱179.6M | 70% | High risk93 | Flagged0.023 |
| 23K00219INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)JCT SARYE HIGHWAY DALIRIG-KISOLON BYPASS ROAD, PACKAGE 9, BUKIDNON | Region X | Region X | On-Going | ₱145.2M | 98% | High risk79 | Flagged0.023 |
| 24K00416CONSTRUCTION OF BYPASS ROAD EXTENSION (SUGOD-KAHAPONAN SECTION), BUKIDNON, PACKAGE 10 | Region X | Region X | On-Going | ₱179.5M | 82% | High risk79 | Flagged0.022 |
| 25K00148PREVENTIVE MAINTENANCE-TERTIARY ROADS JCT SH AGLAYAN-ZAMBOANGUITA RD - K1544 + 119 - K1549 + 109, K1554 + 462 - K1555 + 000, K1556 + 000 - K1557 + 029, K1564 + 146 - K1564 + 841.53 | Region X | Region X | On-Going | ₱155.3M | 60% | High risk93 | Flagged0.022 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 401 | 25K00092CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) NORTHERN BUKIDNON AGRI-INDUSTRIAL ECONOMIC ZONE ROAD NETWORK DEVELOPMENT PROJE | Region X | Region X | On-Going | ₱85.1M | 41% | Medium risk51 | —-0.040 |
| 402 | 21K00095CONST. OF ROAD, JCT.CDO-AIRPORT-BUK ROAD TO JCT.TALAKAG-BAUNGON-LIBONA ROAD(IMBATUG-SALIMBALAN-SAN V | Region X | Region X | Completed | ₱74M | 100% | Medium risk51 | —-0.072 |
| 403 | 24K00171CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PULANGI RIVER, PACKAGE 3, SAN ISIDRO, VALENCIA CITY BUKIDNON | Region X | Region X | On-Going | ₱83M | 100% | Medium risk51 | —-0.033 |
| 404 | 25K00235PREVENTIVE MAINTENANCE-TERTIARY ROADS, JCT SH-AGLAYAN-ALANIB-TICALAAN RD (AGLAYAN-BASAK) - K1519 + 339 - K1519 + 377, K1520 + 658 - K1522 + 285, K1523 + 328 - K1524 + 000 | Region X | Region X | On-Going | ₱59.3M | 100% | Medium risk51 | —-0.056 |
| 405 | 25K00129CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD II (MANOLO FORTICH SECTION), PACKAGE 40, BUKIDNON | Region X | Region X | On-Going | ₱56.7M | 40% | Medium risk51 | —-0.042 |
| 406 | 25K00019CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY BYPASS ROAD, MALUKO SECTION (CLIMBING LANES), BUKIDNON | Region X | Region X | On-Going | ₱56.7M | 71% | Medium risk51 | —-0.048 |
| 407 | 22KC0050PREVENTIVE MAINTENANCE OF ROAD; ASPHALT OVERLAY ALONG SAYRE HIGHWAY K1472+388-K1474+090, SUMILAO, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱57.9M | 100% | Medium risk51 | —-0.089 |
| 408 | 25K00390CONST. OF BY-PASS AND DIVERSION ROADS, JCT. SAYRE HIGHWAY, LAGUITAS SECTION TO MALAYBALAY CITY-VALENCIA BY-PASS LINK ROAD | Region X | Region X | On-Going | ₱60.5M | 30% | Medium risk51 | —-0.035 |
| 409 | 23KA0077REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG SAYRE HIGHWAY, K1500 + 210 - K1500 + 520BRGY. KALASUNGAY, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱57.9M | 100% | Medium risk51 | —-0.085 |
| 410 | 24KA0007PREVENTIVE MAINTENANCE ALONG SAYRE HIGHWAY K1476+027 - K1479+010, IMPASUG-ONG, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱68.8M | 100% | Medium risk51 | —-0.086 |
| 411 | 24KA0064ROAD WIDENING ALONG SAYRE HIGHWAY - K1481 + 883 - K1482 + 049, K1482 + 453 - K1483 + 636IMPASUG-ONG, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱67.1M | 100% | Medium risk51 | —-0.086 |
| 412 | 18K00033OFF-CARRIAGEWAY IMPRVT. JCT. SAYRE H-WAY-IMPASUGONG-PATULANGAN BY-PASS RD -K1483+766-K1483+920,K1484 | Region X | Region X | Completed | ₱60M | 100% | Medium risk51 | —-0.089 |
| 413 | 20K00342CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CAGAYAN DE ORO DIVERSION ROAD, (JCT. BALUBAL SAYRE HIGHWAY-PUEBLO DE ORO, CDO-OLD AIRPORT ROAD DIVERSION ROAD (PUEBLO DE ORO/JCT. CDO-OLD AIRPORT ROAD) PHASE II, PACKAGE 7, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱86.7M | 100% | Medium risk51 | —-0.060 |
| 414 | 19KB0057WIDENING OF PERMANENT BRIDGES, OMONAY BRIDGE (B01378MN) ALONG SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY ROAD-COTABATO BOUNDARY), OMONAY, DAMULOG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱55M | 100% | Medium risk51 | —-0.051 |
| 415 | 24K00358ROAD WIDENING-SECONDARY ROADS, BARANDIAS-DOMINOROG RD - K1599 + 028 - K1599 +312, K1599 + 659 - K1600 + 304, K1600 + 329 - K1600 + 455 | Region X | Region X | On-Going | ₱55.7M | 99% | Medium risk51 | —-0.054 |
| 416 | 21K00012CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD II, (VALENCIA - QUEZON SECTION), PACKAGE 31, BUKIDNON | Region X | Region X | Completed | ₱54.8M | 100% | Medium risk51 | —-0.053 |
| 417 | 18KB0074WIDENING OF PERMANENT BRIDGES, RAWARI BRIDGE (B01384MN) ALONG BUKIDNON-DAVAO CITY ROAD, SINUDA, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱51.5M | 100% | Medium risk51 | —-0.058 |
| 418 | 22K00175CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, VALENCIA BYPASS ROAD EXTENSION, PACKAGE 5, BUKIDNON | Region X | Region X | Completed | ₱55.5M | 100% | Medium risk51 | —-0.082 |
| 419 | 24KC0001REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIP SLOPE COLLAPSE AND LANDSLIDE ALONG JCT. SH AGLAYAN-ALANIB-TICALAAN RD (AGLAYAN-BASAK) - K1567+(-325)-K1567+(-175), K1567+(-735)-K1567+(-395), K1567+(-965)-K1567+(-790), K1567+100-K1567+335, TALAKAG, BUKIDNO | Region X | Bukidnon 3rd DEO | Completed | ₱55.8M | 100% | Medium risk51 | —-0.089 |
| 420 | 25K00205CONSTRUCTION OF REVETMENT, DOWNSTREAM OF CAMP 1 BRIDGE (B01375MN) ALONG MARAMAG RIVER, MARAMAG, BUKIDNON | Region X | Region X | On-Going | ₱56.7M | 60% | Medium risk51 | —-0.026 |
| 421 | 24K00040CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KAPALONG-TALAINGOD-VALENCIA ROAD(MALAMBAGO STREAM-TRIBUTARY TO PULANGUI RIVER) PACKAGE 3, BARANGAY MALAMBAGO, SAN FERNANDO, BUKIDNON | Region X | Region X | On-Going | ₱70.9M | 100% | Medium risk51 | —-0.032 |
| 422 | 20K00341CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CAGAYAN DE ORO DIVERSION ROAD, (JCT. BALUBAL SAYRE HIGHWAY-PUEBLO DE ORO, CDO-OLD AIRPORT ROAD DIVERSION ROAD (PUEBLO DE ORO/JCT. CDO-OLD AIRPORT ROAD) PHASE II, PACKAGE 6, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱82.3M | 100% | Medium risk51 | —-0.061 |
| 423 | 24K00057CONST. OF FLOOD MITIGATION STRUCTURE ALONG KAPALONG-TALAINGOD-VALENCIA ROAD (TIGWA RIVER) BARANGAY HALAPITAN, SAN FERNANDO, BUKIDNON | Region X | Region X | On-Going | ₱66M | 100% | Medium risk51 | —-0.033 |
| 424 | 24K00172CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KAPALONG-TALAINGOD-VALENCIA ROAD (MAWI-I CREEK - MAWI-I BRIDGE, TRIBUTARY TO PULANGUI RIVER) PACKAGE 3, BARANGAY HALAPITAN (POBLACION), SAN FERNANDO, BUKIDNON | Region X | Region X | On-Going | ₱66.1M | 100% | Medium risk51 | —-0.035 |
| 425 | 25K00266CONSTRUCTION OF REVETMENT, UPSTREAM OF BUSCO BRIDGE (B01389) ALONG PULANGI RIVER, MARAMAG, BUKIDNON | Region X | Region X | On-Going | ₱56.7M | 75% | Medium risk51 | —-0.031 |