Contractor dossier
738 projects on file, including joint ventures this contractor is part of.
Total projects
738
Total budget
₱66.7B
Average progress
95.3%
Completion rate
74.4%
Average risk score
54.4
Medium risk on average, out of 100
Flagged as unusual
49
6.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 718 | ₱63.7B | 54.4 | 49 | 95.2% |
| Region XIII | 13 | ₱1.8B | 50.9 | 0 | 100.0% |
| Central Office | 4 | ₱857.9M | 54.2 | 0 | 100.0% |
| Region VII | 3 | ₱327.6M | 58.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 476 | ₱44.3B | 52.2 | 3 | 96.3% |
| Bridges | 120 | ₱5.9B | 48.9 | 4 | 95.8% |
| Flood Control and Drainage | 71 | ₱6.8B | 55.9 | 4 | 96.4% |
| OTHER | 40 | ₱5.8B | 77.7 | 25 | 96.1% |
| GAA 2025 OO-1 | 12 | ₱1.4B | 93.4 | 11 | 55.4% |
| Bridges, Roads | 12 | ₱1.9B | 59.2 | 0 | 100.0% |
| Buildings and Facilities | 4 | ₱238.2M | 51.9 | 0 | 79.2% |
| GAA 2025 SSP | 2 | ₱283.6M | 95.7 | 2 | 22.9% |
| GAA 2025 OO-2 | 1 | ₱47.5M | 89.1 | 0 | 72.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25K00398CONSTRUCTION OF ACCESS ROAD LEADING TO CONFLICT AFFECTED AREAS, CANAYAN-MANALOG SECTION, PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱141.8M | 46% | High risk96 | Flagged0.031 |
| 25K00197CONSTRUCTION OF JCT. CAMP KIBARITAN-PANGANTUCAN - JCT GUINOYURAN-VALENCIA ROAD, PACKAGE 11, BUKIDNON | Region X | Region X | On-Going | ₱141.8M | 0% | High risk96 | Flagged0.043 |
| 25KC0131PREVENTIVE MAINTENANCE ALONG JCT. SH-AGLAYAN-ALANIB-TICALAAN ROAD (TICALAAN-PAGANAN SECT.) - K1509+079-K1514+169, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱94.5M | 52% | High risk94 | Flagged0.009 |
| 25KC0101PREVENTIVE MAINTENANCE ALONG JCT. SH AGLAYAN-ALANIB-TICALAAN ROAD (TICALAAN-PAGANAN SECT.) K1503+200-K1504+754, K1506+910-K1507+000, K1507+000-K1508+000, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱95.1M | 50% | High risk94 | Flagged0.011 |
| 25KC0129PREVENTIVE MAINTENANCE ALONG JCT. SH-AGLAYAN-ALANIB-TICALAAN ROAD (TICALAAN-PAGANAN SECT.) K1504+754 - K1506+910, K1508+000 - K1508+364, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱94.5M | 49% | High risk94 | Flagged0.011 |
| 25K00084CONSTRUCTION OF BY-PASS AND DIVERSION ROADS MANGIMA-AGUSAN CANYON BYPASS ROAD, BUKIDNON | Region X | Region X | On-Going | ₱94.5M | 44% | High risk94 | Flagged0.011 |
| 25K00162CONST. OF BY-PASS AND DIVERSION ROADS - SAYRE HIGHWAY PARALLEL ROAD II (IMPASUG-ONG - MALAYBALAY CITY SECTION), PACKAGE 60, BUKIDNON | Region X | Region X | On-Going | ₱66.1M | 38% | High risk93 | Flagged0.007 |
| 25K00253ROAD WIDENING-SECONDARY ROADS, SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY RD-COTABATO BDRY) - K1580 + 000 - K1581 + 423 | Region X | Region X | On-Going | ₱64.2M | 99% | High risk93 | —-0.009 |
| 25K00083CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CONSTRUCTION OF MANGIMA-AGUSAN CANYON BYPASS ROAD, PACKAGE 3, BUKIDNON | Region X | Region X | On-Going | ₱189M | 31% | High risk93 | Flagged0.031 |
| 25K00339CONST. OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 26, BUKIDNON | Region X | Region X | On-Going | ₱174.9M | 67% | High risk93 | Flagged0.023 |
| 25K00044CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 24, BUKIDNON | Region X | Region X | On-Going | ₱179.6M | 70% | High risk93 | Flagged0.023 |
| 25K00148PREVENTIVE MAINTENANCE-TERTIARY ROADS JCT SH AGLAYAN-ZAMBOANGUITA RD - K1544 + 119 - K1549 + 109, K1554 + 462 - K1555 + 000, K1556 + 000 - K1557 + 029, K1564 + 146 - K1564 + 841.53 | Region X | Region X | On-Going | ₱155.3M | 60% | High risk93 | Flagged0.022 |
| 25K00096CONST. OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD II (VALENCIA CITY SECTION), PACKAGE 59, BUKIDNON | Region X | Region X | On-Going | ₱99.2M | 54% | High risk93 | Flagged0.012 |
| 25K00057CONSTRUCTION OF BY-PASS AND DIVERSION ROADSSAYRE HIGHWAY PARALLEL ROAD II (QUEZON SECTION), PACKAGE 50, BUKIDNON | Region X | Region X | On-Going | ₱111.3M | 51% | High risk93 | Flagged0.013 |
| 25KN0048CONSTRUCTION OF FLOOD CONTROL STRUCTURE, (PULANGUI RIVER), PULANGUI RIS, VALENCIA CITY, BUKIDNON | Region X | Bukidnon 4th DEO | On-Going | ₱47.5M | 72% | High risk89 | —-0.014 |
| 23K00318CONSTRUCTION OF DAMULOG-BAGOR-KADINGILAN BY-PASS ROAD, PACKAGE 4, BUKIDNON | Region X | Region X | On-Going | ₱188.8M | 62% | High risk88 | Flagged0.083 |
| 17N00004CONSTRUCTION OF BY-PASSES/DIVERSION ROADS, INCLUDING ROW DAANG MAHARLIKA (ALTERNATE ROUTE) (NRJ - MAYOR DEMOCRITO D. PLAZA AVEUE - LAS NIEVES - SIBAGAT), PACKAGE 2 (DON FRANCISCO BILAY SECTION) INCLUDING BRIDGE (BILAY BR.), AGUSAN DEL NORTE 1ST LD, BUTUAN | Region XIII | Region XIII | Completed | ₱192.5M | 100% | High risk81 | —-0.006 |
| 24K00282CONSTRUCTION OF ROAD, JCT SH VALENCIA - KAPALONG RD SACRAMENTO VALLEY SECT - MALAYAN - JASAAN - VALDERRAMA - CAPINONAN RD, BUKIDNON | Region X | Region X | On-Going | ₱188.9M | 99% | High risk80 | Flagged0.020 |
| 24K00419CONSTRUCTION OF ROAD, MALAYBALAY CITY - VALENCIA CITY BYPASS LINK ROAD PACKAGE 1, BUKIDNON | Region X | Region X | On-Going | ₱188.9M | 80% | High risk80 | Flagged0.025 |
| 23K00272CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 16, BUKIDNON | Region X | Region X | On-Going | ₱188.8M | 98% | High risk80 | Flagged0.029 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23K00318CONSTRUCTION OF DAMULOG-BAGOR-KADINGILAN BY-PASS ROAD, PACKAGE 4, BUKIDNON | Region X | Region X | On-Going | ₱188.8M | 62% | High risk88 | Flagged0.083 |
| 24K00554CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PULANGUI RIVER, UPSTREAM OF NEW BATANGAN BR., PACKAGE 3, VALENCIA CITY, BUKIDNON | Region X | Region X | On-Going | ₱189M | 57% | High risk72 | Flagged0.056 |
| 24K00520CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITHIN LUMBAYAO (ALONG PULANGI RIVER), BARANGAY LUMBAYAO, SECTION, VALENCIA CITY | Region X | Region X | On-Going | ₱179.5M | 67% | High risk72 | Flagged0.054 |
| 23K00331CONSTRUCTION OF SAYRE HIGHWAY PARALLEL ROAD, MARAMAG SECTION, PACKAGE 1, MARAMAG, BUKIDNON | Region X | Region X | On-Going | ₱188.7M | 16% | High risk65 | Flagged0.053 |
| 24K00535CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG PULANGUI RIVER, UPSTREAM OF NEW BATANGAN BR., PACKAGE 2, VALENCIA CITY, BUKIDNON | Region X | Region X | On-Going | ₱189M | 92% | High risk72 | Flagged0.050 |
| 24K00521CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAAPAG RIVER (CATUMBALON SECTION) (DOWNSTREAM), BARANGAY CATUMBALON, VALENCIA CITY, BUKIDNON | Region X | Region X | On-Going | ₱179.6M | 85% | High risk72 | Flagged0.050 |
| 24K00555CONST. OF BY-PASS AND DIVERSION ROADS, DON CARLOS-KALILANGAN ALTERNATE ROAD, PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱283.5M | 51% | High risk66 | Flagged0.046 |
| 25K00197CONSTRUCTION OF JCT. CAMP KIBARITAN-PANGANTUCAN - JCT GUINOYURAN-VALENCIA ROAD, PACKAGE 11, BUKIDNON | Region X | Region X | On-Going | ₱141.8M | 0% | High risk96 | Flagged0.043 |
| 19K00421RECONSTRUCTION FROM TOTALLY DAMAGED OLD BATANGAN STEEL BRIDGE TO PRE-CAST/ PRE-STRESSED (PCPS) BR. | Region X | Region X | Completed | ₱183.2M | 100% | High risk64 | Flagged0.034 |
| 23K00160CONSTRUCTION OF VALENCIA CITY EAST BY-PASS RD, PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱283.3M | 100% | High risk79 | Flagged0.033 |
| 25K00398CONSTRUCTION OF ACCESS ROAD LEADING TO CONFLICT AFFECTED AREAS, CANAYAN-MANALOG SECTION, PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱141.8M | 46% | High risk96 | Flagged0.031 |
| 25K00083CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CONSTRUCTION OF MANGIMA-AGUSAN CANYON BYPASS ROAD, PACKAGE 3, BUKIDNON | Region X | Region X | On-Going | ₱189M | 31% | High risk93 | Flagged0.031 |
| 23K00272CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 16, BUKIDNON | Region X | Region X | On-Going | ₱188.8M | 98% | High risk80 | Flagged0.029 |
| 24K00419CONSTRUCTION OF ROAD, MALAYBALAY CITY - VALENCIA CITY BYPASS LINK ROAD PACKAGE 1, BUKIDNON | Region X | Region X | On-Going | ₱188.9M | 80% | High risk80 | Flagged0.025 |
| 23K00237CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD II (MANOLO FORTICH-VALENCIA CITY SECTION), PACKAGE 41, BUKIDNON | Region X | Region X | On-Going | ₱188.7M | 100% | High risk79 | Flagged0.025 |
| 25K00339CONST. OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 26, BUKIDNON | Region X | Region X | On-Going | ₱174.9M | 67% | High risk93 | Flagged0.023 |
| 25K00044CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 24, BUKIDNON | Region X | Region X | On-Going | ₱179.6M | 70% | High risk93 | Flagged0.023 |
| 23K00219INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)JCT SARYE HIGHWAY DALIRIG-KISOLON BYPASS ROAD, PACKAGE 9, BUKIDNON | Region X | Region X | On-Going | ₱145.2M | 98% | High risk79 | Flagged0.023 |
| 24K00416CONSTRUCTION OF BYPASS ROAD EXTENSION (SUGOD-KAHAPONAN SECTION), BUKIDNON, PACKAGE 10 | Region X | Region X | On-Going | ₱179.5M | 82% | High risk79 | Flagged0.022 |
| 25K00148PREVENTIVE MAINTENANCE-TERTIARY ROADS JCT SH AGLAYAN-ZAMBOANGUITA RD - K1544 + 119 - K1549 + 109, K1554 + 462 - K1555 + 000, K1556 + 000 - K1557 + 029, K1564 + 146 - K1564 + 841.53 | Region X | Region X | On-Going | ₱155.3M | 60% | High risk93 | Flagged0.022 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 501 | 18KB0075WIDENING OF PERMANENT BRIDGES, DILAPA BRIDGES (B01381MN) ALONG BUKIDNON-DAVAO CITY ROAD, DILAPA, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱45.8M | 100% | Medium risk47 | —-0.058 |
| 502 | 24K00230WIDENING OF PERMANENT BRIDGES MARADUGAO BR. (B01445MN) ALONG MARAMAG-MARADUGAO RD | Region X | Region X | On-Going | ₱37M | 80% | Medium risk47 | —-0.020 |
| 503 | 24K00250WIDENING OF PERMANENT BRIDGES MALATIPAY BR. (B01388MN) ALONG KALILANGAN-LAMPANUSAN RD | Region X | Region X | On-Going | ₱37.8M | 100% | Medium risk47 | —-0.028 |
| 504 | 18KB0076WIDENING OF PERMANENT BRIDGES, CAMP I BRIDGE (B01375MN) ALONG SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY ROAD-COTABATO BOUNDARY), CAMP I, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱39.7M | 100% | Medium risk47 | —-0.058 |
| 505 | 20KB0116WIDENING OF PERMANENT BRIDGES, MULITA BRIDGE (B01415MN), ALONG DON CARLOS - KADINGILAN ROAD, MARAYMARAY, DON CARLOS, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱41.9M | 100% | Medium risk47 | —-0.058 |
| 506 | 23KA0045CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG SAYRE HIGHWAY (MALINGON CREEK), BARANGAY BAGONTAAS, VALENCIA CITY, BUKIDNON BRGY. BAGONTAAS, VALENCIA CITY, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.076 |
| 507 | 18KA0042CONSTRUCTION OF SLOPE PROTECTION ALONG SAYRE HIGHWAY (MANUPALI BRIDGE)MALAYBALAY CITY, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.077 |
| 508 | 18KA0044CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY KALAGANGAN, SAN FERNANDO, BUKIDNONLANTAPAN, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.076 |
| 509 | 22KA0060CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KAPALONG-TALAINGOD-VALENCIA ROAD (MALAMBAGO STREAM-TRIBUTARY TO PULANGUI RIVER), BRGY. MALAMBAGO, STA. 0+200 - STA. 0+400 (BS), SAN FERNANDO, BUKIDNON BRGY. MALAMBAGO, SAN FERNANDO, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.066 |
| 510 | 21KB0093WIDENING OF PERMANENT BRIDGES, LALAPOY BRIDGE (B01417MN) ALONG DON CARLOS-KADINGILAN ROAD, KALUBIHON, DON CARLOS, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱32.9M | 100% | Medium risk47 | —-0.060 |
| 511 | 23KA0047CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KAPALONG-TALAINGOD-VALENCIA ROAD (TIGWA RIVER), BARANGAY HALAPITAN, SAN FERNANDO, BUKIDNON BRGY. HALAPITAN, SAN FERNANDO, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.076 |
| 512 | 18KB0066WIDENING OF PERMANENT BRIDGES, DAMULOG BRIDGE (B01377MN) ALONG SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY ROAD-COTABATO BOUNDARY), POCOPOCO, DAMULOG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱34.3M | 100% | Medium risk47 | —-0.059 |
| 513 | 17K00365CONST. OF SH PARALLEL RD II(MF-VAL. CITY SECT.)INCL. ROW PACKAGE 2,BUKIDNON | Region X | Region X | Completed | ₱182.4M | 100% | Medium risk47 | —-0.021 |
| 514 | 24K00244CONSTRUCTION OF BRIDGE ALONG BRGY. PANALSALAN - BRGY. DAGUMBAAN ROAD (PACKAGE III), MARAMAG, BUKIDNON | Region X | Region X | On-Going | ₱42.5M | 100% | Medium risk47 | —-0.027 |
| 515 | 23KB0063WIDENING OF PERMANENT BRIDGES, MARAMAG BRIDGE (B01431MN) ALONG MARAMAG-MARADUGAO ROAD, BASE CAMP, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱38.8M | 100% | Medium risk47 | —-0.056 |
| 516 | 22KC0066CONSTRUCTION OF SAGAYARAN BRIDGE INCLUDING APPROACHES AND FLOOD CONTROL, KINURA, KALILANGAN, BUKIDNON (PHASE 1), KINURA, KALILANGAN, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱32.2M | 100% | Medium risk47 | —-0.056 |
| 517 | 23KA0033CONSTRUCTION OF MAAPAG BRIDGE ALONG JCT. (BATANGAN - LALIGAN) DAGAT KIDAVAO ROAD, VALENCIA CITY, BUKIDNON PHASE II, VALENCIA CITY, BUKIDNON, 4TH LD | Region X | Bukidnon 1st DEO | Completed | ₱44.1M | 100% | Medium risk47 | —-0.050 |
| 518 | 23K00029CONST. OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD II (VALENCIA CITY SECTION), PACKAGE 42, BUKIDNON | Region X | Region X | Completed | ₱42.5M | 100% | Medium risk47 | —-0.057 |
| 519 | 18KB0030WIDENING OF PERMANENT BRIDGES, MARAMAG BRIDGE (B01431MN) ALONG MARAMAG-MARADUGAO ROAD, BASE CAMP, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱38.7M | 100% | Medium risk47 | —-0.058 |
| 520 | 22KB0102CONSTRUCTION OF BRIDGE FROM BARANGAY CATUMBALON, VALENCIA CITY TO BARANGAY PAITAN, QUEZON, BUKIDNON, BARANGAY PAITAN, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱28.8M | 73% | Medium risk47 | —-0.001 |
| 521 | 22KB0103CONSTRUCTION OF BRIDGE FROM BARANGAY CATUMBALON, VALENCIA CITY, BUKIDNON TO BARANGAY PAITAN, QUEZON, BUKIDNON, CATUMBALON, VALENCIA CITY, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.057 |
| 522 | 18KB0065WIDENING OF PERMANENT BRIDGES, COLAMBUGON BRIDGE (B01433MN) ALONG MARAMAG-MARADUGAO ROAD, COLAMBUGON, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱35.1M | 100% | Medium risk47 | —-0.059 |
| 523 | 19K00327CONSTRUCTION OF NEW BRIDGES, BAPTIST BR. ALONG BARANDIAS-DOMINOROG RD (PHASE II), BUKIDNON | Region X | Region X | Completed | ₱36.7M | 100% | Medium risk47 | —-0.060 |
| 524 | 23KA0044WIDENING OF PERMANENT BRIDGES: SALOLONG BRIDGE (B01656MN) ALONG KAPALONG-TALAINGOD-VALENCIA (BUKIDNON) RD BRGY. SACRAMENTO VALLEY, SAN FERNANDO, BUKIDNON, 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱43.1M | 100% | Medium risk47 | —-0.047 |
| 525 | 24K00297WIDENING OF PERMANENT BRIDGES KIDANGIN BR. (B01449MN) ALONG KIBAWE-KADINGILAN-KALILANGAN RD (PHASE II) | Region X | Region X | On-Going | ₱18.9M | 100% | Medium risk47 | —-0.028 |