Contractor dossier
738 projects on file, including joint ventures this contractor is part of.
Total projects
738
Total budget
₱66.7B
Average progress
95.3%
Completion rate
74.4%
Average risk score
54.4
Medium risk on average, out of 100
Flagged as unusual
49
6.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 718 | ₱63.7B | 54.4 | 49 | 95.2% |
| Region XIII | 13 | ₱1.8B | 50.9 | 0 | 100.0% |
| Central Office | 4 | ₱857.9M | 54.2 | 0 | 100.0% |
| Region VII | 3 | ₱327.6M | 58.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 476 | ₱44.3B | 52.2 | 3 | 96.3% |
| Bridges | 120 | ₱5.9B | 48.9 | 4 | 95.8% |
| Flood Control and Drainage | 71 | ₱6.8B | 55.9 | 4 | 96.4% |
| OTHER | 40 | ₱5.8B | 77.7 | 25 | 96.1% |
| GAA 2025 OO-1 | 12 | ₱1.4B | 93.4 | 11 | 55.4% |
| Bridges, Roads | 12 | ₱1.9B | 59.2 | 0 | 100.0% |
| Buildings and Facilities | 4 | ₱238.2M | 51.9 | 0 | 79.2% |
| GAA 2025 SSP | 2 | ₱283.6M | 95.7 | 2 | 22.9% |
| GAA 2025 OO-2 | 1 | ₱47.5M | 89.1 | 0 | 72.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25K00398CONSTRUCTION OF ACCESS ROAD LEADING TO CONFLICT AFFECTED AREAS, CANAYAN-MANALOG SECTION, PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱141.8M | 46% | High risk96 | Flagged0.031 |
| 25K00197CONSTRUCTION OF JCT. CAMP KIBARITAN-PANGANTUCAN - JCT GUINOYURAN-VALENCIA ROAD, PACKAGE 11, BUKIDNON | Region X | Region X | On-Going | ₱141.8M | 0% | High risk96 | Flagged0.043 |
| 25KC0131PREVENTIVE MAINTENANCE ALONG JCT. SH-AGLAYAN-ALANIB-TICALAAN ROAD (TICALAAN-PAGANAN SECT.) - K1509+079-K1514+169, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱94.5M | 52% | High risk94 | Flagged0.009 |
| 25KC0101PREVENTIVE MAINTENANCE ALONG JCT. SH AGLAYAN-ALANIB-TICALAAN ROAD (TICALAAN-PAGANAN SECT.) K1503+200-K1504+754, K1506+910-K1507+000, K1507+000-K1508+000, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱95.1M | 50% | High risk94 | Flagged0.011 |
| 25KC0129PREVENTIVE MAINTENANCE ALONG JCT. SH-AGLAYAN-ALANIB-TICALAAN ROAD (TICALAAN-PAGANAN SECT.) K1504+754 - K1506+910, K1508+000 - K1508+364, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱94.5M | 49% | High risk94 | Flagged0.011 |
| 25K00084CONSTRUCTION OF BY-PASS AND DIVERSION ROADS MANGIMA-AGUSAN CANYON BYPASS ROAD, BUKIDNON | Region X | Region X | On-Going | ₱94.5M | 44% | High risk94 | Flagged0.011 |
| 25K00162CONST. OF BY-PASS AND DIVERSION ROADS - SAYRE HIGHWAY PARALLEL ROAD II (IMPASUG-ONG - MALAYBALAY CITY SECTION), PACKAGE 60, BUKIDNON | Region X | Region X | On-Going | ₱66.1M | 38% | High risk93 | Flagged0.007 |
| 25K00253ROAD WIDENING-SECONDARY ROADS, SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY RD-COTABATO BDRY) - K1580 + 000 - K1581 + 423 | Region X | Region X | On-Going | ₱64.2M | 99% | High risk93 | —-0.009 |
| 25K00083CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CONSTRUCTION OF MANGIMA-AGUSAN CANYON BYPASS ROAD, PACKAGE 3, BUKIDNON | Region X | Region X | On-Going | ₱189M | 31% | High risk93 | Flagged0.031 |
| 25K00339CONST. OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 26, BUKIDNON | Region X | Region X | On-Going | ₱174.9M | 67% | High risk93 | Flagged0.023 |
| 25K00044CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 24, BUKIDNON | Region X | Region X | On-Going | ₱179.6M | 70% | High risk93 | Flagged0.023 |
| 25K00148PREVENTIVE MAINTENANCE-TERTIARY ROADS JCT SH AGLAYAN-ZAMBOANGUITA RD - K1544 + 119 - K1549 + 109, K1554 + 462 - K1555 + 000, K1556 + 000 - K1557 + 029, K1564 + 146 - K1564 + 841.53 | Region X | Region X | On-Going | ₱155.3M | 60% | High risk93 | Flagged0.022 |
| 25K00096CONST. OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD II (VALENCIA CITY SECTION), PACKAGE 59, BUKIDNON | Region X | Region X | On-Going | ₱99.2M | 54% | High risk93 | Flagged0.012 |
| 25K00057CONSTRUCTION OF BY-PASS AND DIVERSION ROADSSAYRE HIGHWAY PARALLEL ROAD II (QUEZON SECTION), PACKAGE 50, BUKIDNON | Region X | Region X | On-Going | ₱111.3M | 51% | High risk93 | Flagged0.013 |
| 25KN0048CONSTRUCTION OF FLOOD CONTROL STRUCTURE, (PULANGUI RIVER), PULANGUI RIS, VALENCIA CITY, BUKIDNON | Region X | Bukidnon 4th DEO | On-Going | ₱47.5M | 72% | High risk89 | —-0.014 |
| 23K00318CONSTRUCTION OF DAMULOG-BAGOR-KADINGILAN BY-PASS ROAD, PACKAGE 4, BUKIDNON | Region X | Region X | On-Going | ₱188.8M | 62% | High risk88 | Flagged0.083 |
| 17N00004CONSTRUCTION OF BY-PASSES/DIVERSION ROADS, INCLUDING ROW DAANG MAHARLIKA (ALTERNATE ROUTE) (NRJ - MAYOR DEMOCRITO D. PLAZA AVEUE - LAS NIEVES - SIBAGAT), PACKAGE 2 (DON FRANCISCO BILAY SECTION) INCLUDING BRIDGE (BILAY BR.), AGUSAN DEL NORTE 1ST LD, BUTUAN | Region XIII | Region XIII | Completed | ₱192.5M | 100% | High risk81 | —-0.006 |
| 24K00282CONSTRUCTION OF ROAD, JCT SH VALENCIA - KAPALONG RD SACRAMENTO VALLEY SECT - MALAYAN - JASAAN - VALDERRAMA - CAPINONAN RD, BUKIDNON | Region X | Region X | On-Going | ₱188.9M | 99% | High risk80 | Flagged0.020 |
| 24K00419CONSTRUCTION OF ROAD, MALAYBALAY CITY - VALENCIA CITY BYPASS LINK ROAD PACKAGE 1, BUKIDNON | Region X | Region X | On-Going | ₱188.9M | 80% | High risk80 | Flagged0.025 |
| 23K00272CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 16, BUKIDNON | Region X | Region X | On-Going | ₱188.8M | 98% | High risk80 | Flagged0.029 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23K00318CONSTRUCTION OF DAMULOG-BAGOR-KADINGILAN BY-PASS ROAD, PACKAGE 4, BUKIDNON | Region X | Region X | On-Going | ₱188.8M | 62% | High risk88 | Flagged0.083 |
| 24K00554CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PULANGUI RIVER, UPSTREAM OF NEW BATANGAN BR., PACKAGE 3, VALENCIA CITY, BUKIDNON | Region X | Region X | On-Going | ₱189M | 57% | High risk72 | Flagged0.056 |
| 24K00520CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITHIN LUMBAYAO (ALONG PULANGI RIVER), BARANGAY LUMBAYAO, SECTION, VALENCIA CITY | Region X | Region X | On-Going | ₱179.5M | 67% | High risk72 | Flagged0.054 |
| 23K00331CONSTRUCTION OF SAYRE HIGHWAY PARALLEL ROAD, MARAMAG SECTION, PACKAGE 1, MARAMAG, BUKIDNON | Region X | Region X | On-Going | ₱188.7M | 16% | High risk65 | Flagged0.053 |
| 24K00535CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG PULANGUI RIVER, UPSTREAM OF NEW BATANGAN BR., PACKAGE 2, VALENCIA CITY, BUKIDNON | Region X | Region X | On-Going | ₱189M | 92% | High risk72 | Flagged0.050 |
| 24K00521CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAAPAG RIVER (CATUMBALON SECTION) (DOWNSTREAM), BARANGAY CATUMBALON, VALENCIA CITY, BUKIDNON | Region X | Region X | On-Going | ₱179.6M | 85% | High risk72 | Flagged0.050 |
| 24K00555CONST. OF BY-PASS AND DIVERSION ROADS, DON CARLOS-KALILANGAN ALTERNATE ROAD, PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱283.5M | 51% | High risk66 | Flagged0.046 |
| 25K00197CONSTRUCTION OF JCT. CAMP KIBARITAN-PANGANTUCAN - JCT GUINOYURAN-VALENCIA ROAD, PACKAGE 11, BUKIDNON | Region X | Region X | On-Going | ₱141.8M | 0% | High risk96 | Flagged0.043 |
| 19K00421RECONSTRUCTION FROM TOTALLY DAMAGED OLD BATANGAN STEEL BRIDGE TO PRE-CAST/ PRE-STRESSED (PCPS) BR. | Region X | Region X | Completed | ₱183.2M | 100% | High risk64 | Flagged0.034 |
| 23K00160CONSTRUCTION OF VALENCIA CITY EAST BY-PASS RD, PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱283.3M | 100% | High risk79 | Flagged0.033 |
| 25K00398CONSTRUCTION OF ACCESS ROAD LEADING TO CONFLICT AFFECTED AREAS, CANAYAN-MANALOG SECTION, PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱141.8M | 46% | High risk96 | Flagged0.031 |
| 25K00083CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CONSTRUCTION OF MANGIMA-AGUSAN CANYON BYPASS ROAD, PACKAGE 3, BUKIDNON | Region X | Region X | On-Going | ₱189M | 31% | High risk93 | Flagged0.031 |
| 23K00272CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 16, BUKIDNON | Region X | Region X | On-Going | ₱188.8M | 98% | High risk80 | Flagged0.029 |
| 24K00419CONSTRUCTION OF ROAD, MALAYBALAY CITY - VALENCIA CITY BYPASS LINK ROAD PACKAGE 1, BUKIDNON | Region X | Region X | On-Going | ₱188.9M | 80% | High risk80 | Flagged0.025 |
| 23K00237CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD II (MANOLO FORTICH-VALENCIA CITY SECTION), PACKAGE 41, BUKIDNON | Region X | Region X | On-Going | ₱188.7M | 100% | High risk79 | Flagged0.025 |
| 25K00339CONST. OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 26, BUKIDNON | Region X | Region X | On-Going | ₱174.9M | 67% | High risk93 | Flagged0.023 |
| 25K00044CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 24, BUKIDNON | Region X | Region X | On-Going | ₱179.6M | 70% | High risk93 | Flagged0.023 |
| 23K00219INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)JCT SARYE HIGHWAY DALIRIG-KISOLON BYPASS ROAD, PACKAGE 9, BUKIDNON | Region X | Region X | On-Going | ₱145.2M | 98% | High risk79 | Flagged0.023 |
| 24K00416CONSTRUCTION OF BYPASS ROAD EXTENSION (SUGOD-KAHAPONAN SECTION), BUKIDNON, PACKAGE 10 | Region X | Region X | On-Going | ₱179.5M | 82% | High risk79 | Flagged0.022 |
| 25K00148PREVENTIVE MAINTENANCE-TERTIARY ROADS JCT SH AGLAYAN-ZAMBOANGUITA RD - K1544 + 119 - K1549 + 109, K1554 + 462 - K1555 + 000, K1556 + 000 - K1557 + 029, K1564 + 146 - K1564 + 841.53 | Region X | Region X | On-Going | ₱155.3M | 60% | High risk93 | Flagged0.022 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 676 | 22KA0082ROAD WIDENING ALONG JCT SH-AGLAYAN-ALANIB-TICALAAN RD (AGLAYAN-BASAK) - K1538 + 000 - K1538 + 602, LANTAPAN, BUKIDNON BRGY. ALANIB, LANTAPAN, BUKIDNON 2ND LD WIDENING OF ROAD, 3.65M WIDTH/LANE, 0.28M THICK PCCP; INCLUDES REMOVAL OF TREES AND OBS | Region X | Bukidnon 1st DEO | Completed | ₱21.2M | 100% | Medium risk45 | —-0.092 |
| 677 | 21K00356PREVENTIVE MAINTENANCE-TERTIARY ROAD, JCT SH-AGLAYAN-ALANIB-TICALAAN RD (AGLAYAN-BASAK) - K1529+000-K1530+298.50 | Region X | Region X | Completed | ₱21.5M | 100% | Medium risk45 | —-0.093 |
| 678 | 24KA0050REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS ALONG JCT SH-AGLAYAN-ALANIB-TICALAAN RD (AGLAYAN-BASAK) - K1528 + 000 - K1529 + 000, LANTAPAN, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱24.2M | 100% | Medium risk45 | —-0.093 |
| 679 | 24KA0058REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS ALONG JCT SH-AGLAYAN-ALANIB-TICALAAN RD (AGLAYAN-BASAK) K1538+000 - K1538+927, LANTAPAN, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱22.7M | 100% | Medium risk45 | —-0.093 |
| 680 | 24K00039CONSTRUCTION OF FLOOD MITIGATING STRUCTURE ALONG VALENCIA BY-PASS ROAD, UPPER MALINGON BRIDGE, VALENCIA CITY, BUKIDNON | Region X | Region X | On-Going | ₱42.5M | 100% | Medium risk45 | —-0.037 |
| 681 | 24K00085CONSTRUCTION OF FLOOD MITIGATING STRUCTURE ALONG PULANGUI RIVER, UPSTREAM OF NEW BATANGAN BRIDGE, PACKAGE 1, VALENCIA CITY, BUKIDNON | Region X | Region X | On-Going | ₱42.5M | 100% | Medium risk45 | —-0.038 |
| 682 | 21K00259CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF FLOOD MITIGATION STRUCTURES WITHIN MINDANAO RIVER BASINS (ALONG PULANGUI RIVER) DOWNSTREAM OF NEW BATANGAN BRIDGE, BRGY. POBLACION SECTION, VALENCIA CI | Region X | Region X | Completed | ₱45.8M | 100% | Medium risk45 | —-0.070 |
| 683 | 24K00052CONST. OF FLOOD MITIGATING STRUCTURE ALONG PULANGI RIVER, DOWNSTREAM OF NEW BATANGAN BRIDGE, VALENCIA CITY, BUKIDNON | Region X | Region X | Completed | ₱42.5M | 100% | Medium risk45 | —-0.076 |
| 684 | 24K00290CONST./IMPRVT.OF ACCESS ROAD LEADING TO NAPALIT LAKE, BRGY. PIGTAURANAN, PANGANTUCAN, BUKIDNON | Region X | Region X | Completed | ₱14.2M | 100% | Medium risk45 | —-0.094 |
| 685 | 21K00101CONST. OF ROAD,JCT.CDO-AIRPORT-BUKIDNON ROAD TO JCT.TALAKAG-BAUNGON-LIBONA ROAD(IMBATUG-SALIMBALAN-S | Region X | Region X | Completed | ₱24.7M | 100% | Medium risk45 | —-0.079 |
| 686 | 22KA0065REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG JCT SH-AGLAYAN-ALANIB-TICALAAN RD (AGLAYAN-BASAK) - K1547 + 500 - K1547 + 550 LANTAPAN, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱25.3M | 100% | Medium risk45 | —-0.090 |
| 687 | 23KA0122CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD - JCT. SAYRE HIGHWAY IMPASUG-ONG INTAVAS - MT. KITANGLAD ROAD CONNECTING MINDANAO INTERNATIONAL CONTAINER TERMINAL - INTERNATIONAL PORT TO PUYAT CUT - FLOWER FARMS AND DOLE PHILIPPINES HIGH VALUE CROPS, IMPASUG-ONG | Region X | Bukidnon 1st DEO | Completed | ₱19.6M | 100% | Medium risk45 | —-0.093 |
| 688 | 23KA0099CONSTRUCTION/ IMPROVEMENT OF ACCESS ROAD LEADING TO JCT. SAYRE HIGHWAY LMPASUG-ONG-INTAVAS-MT. KITANGLAD ROAD CONNECTING MINDANAO INTERNATIONAL CONTAINER TERMINAL-INTERNATIONAL PORT TO PUYAT CUT-FLOWER FARMS AND DOLE PHILIPPINES HIGH VALUE CROPS, IMPASUG- | Region X | Bukidnon 1st DEO | Completed | ₱19.6M | 100% | Medium risk45 | —-0.094 |
| 689 | 22KA0090ROAD WIDENING ALONG KAPALONG-TALAINGOD-VALENCIA (BUKIDNON) RD K1573+123 - K1573+857, SAN FERNANDO, BUKIDNON MABUHAY, SAN FERNANDO, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱26.9M | 100% | Medium risk45 | —-0.091 |
| 690 | 23KA0083CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD - NRJ TO KINILATAN, CAWAYAN, LANTAPAN, BUKIDNON CONNECTING TO DOLE PHILS. AND DEL MONTE PHILS., INC. PACKING SHED IN SUPPORT OF THE BANANA AND PINEAPPLE INDUSTRIES, LANTAPAN, BUKIDNONBRGY. CAWAYAN, LANTAPAN, BUKID | Region X | Bukidnon 1st DEO | Completed | ₱19.6M | 100% | Medium risk45 | —-0.093 |
| 691 | 17K00349IMPRVT./WIDENING OF NATL RDS MARAMAG MARADUGAO RD K1558+579-K1562+000, BUK 4TH LD | Region X | Region X | Completed | ₱81.1M | 100% | Medium risk45 | —-0.054 |
| 692 | 25K00065CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT)NRJ TO KINILATAN, CAWAYAN, LANTAPAN, BUKIDNON CONNECTING TO DOLE PHILS, AND DEL | Region X | Region X | On-Going | ₱14.2M | 100% | Medium risk45 | —-0.061 |
| 693 | 17K00010IMPRVT./WIDENING OF NATL RDS, SH K1540+-294-K1540+-194,K1546+961-K1548+000,K1553+109-K1555+272,BUK 3 | Region X | Region X | Completed | ₱85.6M | 100% | Medium risk45 | —-0.054 |
| 694 | 23KC0019CONSTRUCTION OF ACCESS ROAD LEADING TO NAPALIT LAKE, BARANGAY PIGTAURANAN, PANGANTUCAN, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱4.9M | 100% | Medium risk45 | —-0.093 |
| 695 | 22KB0021PREVENTIVE MAINTENANCE ALONG DON CARLOS-KADINGILAN ROAD, K1587+333-K1588+000, PUROK 1A, BRGY POBLACION, KADINGILAN, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱12.6M | 100% | Medium risk45 | —-0.093 |
| 696 | 21K00273CONST./REHAB. OF FLOOD MITIGATION FACILITIES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG IPONAN RIVER (IPONAN SECTION), CDO CITY, MISAMIS ORIENTAL, STA.1+793.20-STA.1+885.10 | Region X | Region X | Completed | ₱28.1M | 100% | Medium risk45 | —-0.062 |
| 697 | 25K00086CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) ACCESS ROAD LEADING TO NAPALIT LAKE, BRGY. PIGTAURANAN, PANGANTUCAN, BUKIDNON | Region X | Region X | On-Going | ₱9.4M | 100% | Medium risk45 | —-0.061 |
| 698 | 22K00005CONST./IMPRVT. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM -ROLL-IT) SOUTHERN BUKIDNON AGRI-INDUSTRIAL ECONOMIC ZONE ROAD (PANGANTUCAN SECTION) IN PANGANTUCAN, B | Region X | Region X | Completed | ₱6.4M | 100% | Medium risk45 | —-0.092 |
| 699 | 24KA0047PREVENTIVE MAINTENANCE ALONG KAPALONG-TALAINGOD-VALENCIA (BUKIDNON) RD - K1539 +125 - K1539 + 519, SAN FERNANDO, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱9.7M | 100% | Medium risk45 | —-0.092 |
| 700 | 20KA0028OFF-CARRIAGEWAY IMPROVEMENT: CONSTRUCTION OF LOADINGAND UNLOADING BAYS WITH SHOULDER PAVING/CONSTRUCTION - ALONG JCT SH-JP RIZAL-CARILLO-CAPITOL-DPWH RD - (S00623MN) K1506 + 538 - K1506 + 966, MALAYBALAY CITY, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱13.7M | 100% | Medium risk45 | —-0.093 |