Contractor dossier
738 projects on file, including joint ventures this contractor is part of.
Total projects
738
Total budget
₱66.7B
Average progress
95.3%
Completion rate
74.4%
Average risk score
54.4
Medium risk on average, out of 100
Flagged as unusual
49
6.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 718 | ₱63.7B | 54.4 | 49 | 95.2% |
| Region XIII | 13 | ₱1.8B | 50.9 | 0 | 100.0% |
| Central Office | 4 | ₱857.9M | 54.2 | 0 | 100.0% |
| Region VII | 3 | ₱327.6M | 58.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 476 | ₱44.3B | 52.2 | 3 | 96.3% |
| Bridges | 120 | ₱5.9B | 48.9 | 4 | 95.8% |
| Flood Control and Drainage | 71 | ₱6.8B | 55.9 | 4 | 96.4% |
| OTHER | 40 | ₱5.8B | 77.7 | 25 | 96.1% |
| GAA 2025 OO-1 | 12 | ₱1.4B | 93.4 | 11 | 55.4% |
| Bridges, Roads | 12 | ₱1.9B | 59.2 | 0 | 100.0% |
| Buildings and Facilities | 4 | ₱238.2M | 51.9 | 0 | 79.2% |
| GAA 2025 SSP | 2 | ₱283.6M | 95.7 | 2 | 22.9% |
| GAA 2025 OO-2 | 1 | ₱47.5M | 89.1 | 0 | 72.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25K00398CONSTRUCTION OF ACCESS ROAD LEADING TO CONFLICT AFFECTED AREAS, CANAYAN-MANALOG SECTION, PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱141.8M | 46% | High risk96 | Flagged0.031 |
| 25K00197CONSTRUCTION OF JCT. CAMP KIBARITAN-PANGANTUCAN - JCT GUINOYURAN-VALENCIA ROAD, PACKAGE 11, BUKIDNON | Region X | Region X | On-Going | ₱141.8M | 0% | High risk96 | Flagged0.043 |
| 25KC0131PREVENTIVE MAINTENANCE ALONG JCT. SH-AGLAYAN-ALANIB-TICALAAN ROAD (TICALAAN-PAGANAN SECT.) - K1509+079-K1514+169, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱94.5M | 52% | High risk94 | Flagged0.009 |
| 25KC0101PREVENTIVE MAINTENANCE ALONG JCT. SH AGLAYAN-ALANIB-TICALAAN ROAD (TICALAAN-PAGANAN SECT.) K1503+200-K1504+754, K1506+910-K1507+000, K1507+000-K1508+000, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱95.1M | 50% | High risk94 | Flagged0.011 |
| 25KC0129PREVENTIVE MAINTENANCE ALONG JCT. SH-AGLAYAN-ALANIB-TICALAAN ROAD (TICALAAN-PAGANAN SECT.) K1504+754 - K1506+910, K1508+000 - K1508+364, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱94.5M | 49% | High risk94 | Flagged0.011 |
| 25K00084CONSTRUCTION OF BY-PASS AND DIVERSION ROADS MANGIMA-AGUSAN CANYON BYPASS ROAD, BUKIDNON | Region X | Region X | On-Going | ₱94.5M | 44% | High risk94 | Flagged0.011 |
| 25K00162CONST. OF BY-PASS AND DIVERSION ROADS - SAYRE HIGHWAY PARALLEL ROAD II (IMPASUG-ONG - MALAYBALAY CITY SECTION), PACKAGE 60, BUKIDNON | Region X | Region X | On-Going | ₱66.1M | 38% | High risk93 | Flagged0.007 |
| 25K00253ROAD WIDENING-SECONDARY ROADS, SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY RD-COTABATO BDRY) - K1580 + 000 - K1581 + 423 | Region X | Region X | On-Going | ₱64.2M | 99% | High risk93 | —-0.009 |
| 25K00083CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CONSTRUCTION OF MANGIMA-AGUSAN CANYON BYPASS ROAD, PACKAGE 3, BUKIDNON | Region X | Region X | On-Going | ₱189M | 31% | High risk93 | Flagged0.031 |
| 25K00339CONST. OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 26, BUKIDNON | Region X | Region X | On-Going | ₱174.9M | 67% | High risk93 | Flagged0.023 |
| 25K00044CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 24, BUKIDNON | Region X | Region X | On-Going | ₱179.6M | 70% | High risk93 | Flagged0.023 |
| 25K00148PREVENTIVE MAINTENANCE-TERTIARY ROADS JCT SH AGLAYAN-ZAMBOANGUITA RD - K1544 + 119 - K1549 + 109, K1554 + 462 - K1555 + 000, K1556 + 000 - K1557 + 029, K1564 + 146 - K1564 + 841.53 | Region X | Region X | On-Going | ₱155.3M | 60% | High risk93 | Flagged0.022 |
| 25K00096CONST. OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD II (VALENCIA CITY SECTION), PACKAGE 59, BUKIDNON | Region X | Region X | On-Going | ₱99.2M | 54% | High risk93 | Flagged0.012 |
| 25K00057CONSTRUCTION OF BY-PASS AND DIVERSION ROADSSAYRE HIGHWAY PARALLEL ROAD II (QUEZON SECTION), PACKAGE 50, BUKIDNON | Region X | Region X | On-Going | ₱111.3M | 51% | High risk93 | Flagged0.013 |
| 25KN0048CONSTRUCTION OF FLOOD CONTROL STRUCTURE, (PULANGUI RIVER), PULANGUI RIS, VALENCIA CITY, BUKIDNON | Region X | Bukidnon 4th DEO | On-Going | ₱47.5M | 72% | High risk89 | —-0.014 |
| 23K00318CONSTRUCTION OF DAMULOG-BAGOR-KADINGILAN BY-PASS ROAD, PACKAGE 4, BUKIDNON | Region X | Region X | On-Going | ₱188.8M | 62% | High risk88 | Flagged0.083 |
| 17N00004CONSTRUCTION OF BY-PASSES/DIVERSION ROADS, INCLUDING ROW DAANG MAHARLIKA (ALTERNATE ROUTE) (NRJ - MAYOR DEMOCRITO D. PLAZA AVEUE - LAS NIEVES - SIBAGAT), PACKAGE 2 (DON FRANCISCO BILAY SECTION) INCLUDING BRIDGE (BILAY BR.), AGUSAN DEL NORTE 1ST LD, BUTUAN | Region XIII | Region XIII | Completed | ₱192.5M | 100% | High risk81 | —-0.006 |
| 24K00282CONSTRUCTION OF ROAD, JCT SH VALENCIA - KAPALONG RD SACRAMENTO VALLEY SECT - MALAYAN - JASAAN - VALDERRAMA - CAPINONAN RD, BUKIDNON | Region X | Region X | On-Going | ₱188.9M | 99% | High risk80 | Flagged0.020 |
| 24K00419CONSTRUCTION OF ROAD, MALAYBALAY CITY - VALENCIA CITY BYPASS LINK ROAD PACKAGE 1, BUKIDNON | Region X | Region X | On-Going | ₱188.9M | 80% | High risk80 | Flagged0.025 |
| 23K00272CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 16, BUKIDNON | Region X | Region X | On-Going | ₱188.8M | 98% | High risk80 | Flagged0.029 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23K00318CONSTRUCTION OF DAMULOG-BAGOR-KADINGILAN BY-PASS ROAD, PACKAGE 4, BUKIDNON | Region X | Region X | On-Going | ₱188.8M | 62% | High risk88 | Flagged0.083 |
| 24K00554CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PULANGUI RIVER, UPSTREAM OF NEW BATANGAN BR., PACKAGE 3, VALENCIA CITY, BUKIDNON | Region X | Region X | On-Going | ₱189M | 57% | High risk72 | Flagged0.056 |
| 24K00520CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITHIN LUMBAYAO (ALONG PULANGI RIVER), BARANGAY LUMBAYAO, SECTION, VALENCIA CITY | Region X | Region X | On-Going | ₱179.5M | 67% | High risk72 | Flagged0.054 |
| 23K00331CONSTRUCTION OF SAYRE HIGHWAY PARALLEL ROAD, MARAMAG SECTION, PACKAGE 1, MARAMAG, BUKIDNON | Region X | Region X | On-Going | ₱188.7M | 16% | High risk65 | Flagged0.053 |
| 24K00535CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG PULANGUI RIVER, UPSTREAM OF NEW BATANGAN BR., PACKAGE 2, VALENCIA CITY, BUKIDNON | Region X | Region X | On-Going | ₱189M | 92% | High risk72 | Flagged0.050 |
| 24K00521CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAAPAG RIVER (CATUMBALON SECTION) (DOWNSTREAM), BARANGAY CATUMBALON, VALENCIA CITY, BUKIDNON | Region X | Region X | On-Going | ₱179.6M | 85% | High risk72 | Flagged0.050 |
| 24K00555CONST. OF BY-PASS AND DIVERSION ROADS, DON CARLOS-KALILANGAN ALTERNATE ROAD, PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱283.5M | 51% | High risk66 | Flagged0.046 |
| 25K00197CONSTRUCTION OF JCT. CAMP KIBARITAN-PANGANTUCAN - JCT GUINOYURAN-VALENCIA ROAD, PACKAGE 11, BUKIDNON | Region X | Region X | On-Going | ₱141.8M | 0% | High risk96 | Flagged0.043 |
| 19K00421RECONSTRUCTION FROM TOTALLY DAMAGED OLD BATANGAN STEEL BRIDGE TO PRE-CAST/ PRE-STRESSED (PCPS) BR. | Region X | Region X | Completed | ₱183.2M | 100% | High risk64 | Flagged0.034 |
| 23K00160CONSTRUCTION OF VALENCIA CITY EAST BY-PASS RD, PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱283.3M | 100% | High risk79 | Flagged0.033 |
| 25K00398CONSTRUCTION OF ACCESS ROAD LEADING TO CONFLICT AFFECTED AREAS, CANAYAN-MANALOG SECTION, PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱141.8M | 46% | High risk96 | Flagged0.031 |
| 25K00083CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CONSTRUCTION OF MANGIMA-AGUSAN CANYON BYPASS ROAD, PACKAGE 3, BUKIDNON | Region X | Region X | On-Going | ₱189M | 31% | High risk93 | Flagged0.031 |
| 23K00272CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 16, BUKIDNON | Region X | Region X | On-Going | ₱188.8M | 98% | High risk80 | Flagged0.029 |
| 24K00419CONSTRUCTION OF ROAD, MALAYBALAY CITY - VALENCIA CITY BYPASS LINK ROAD PACKAGE 1, BUKIDNON | Region X | Region X | On-Going | ₱188.9M | 80% | High risk80 | Flagged0.025 |
| 23K00237CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAYRE HIGHWAY PARALLEL ROAD II (MANOLO FORTICH-VALENCIA CITY SECTION), PACKAGE 41, BUKIDNON | Region X | Region X | On-Going | ₱188.7M | 100% | High risk79 | Flagged0.025 |
| 25K00339CONST. OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 26, BUKIDNON | Region X | Region X | On-Going | ₱174.9M | 67% | High risk93 | Flagged0.023 |
| 25K00044CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY PARALLEL ROAD I (LIBONA - MANOLO FORTICH - IMPASUG-ONG SECTION), PACKAGE 24, BUKIDNON | Region X | Region X | On-Going | ₱179.6M | 70% | High risk93 | Flagged0.023 |
| 23K00219INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)JCT SARYE HIGHWAY DALIRIG-KISOLON BYPASS ROAD, PACKAGE 9, BUKIDNON | Region X | Region X | On-Going | ₱145.2M | 98% | High risk79 | Flagged0.023 |
| 24K00416CONSTRUCTION OF BYPASS ROAD EXTENSION (SUGOD-KAHAPONAN SECTION), BUKIDNON, PACKAGE 10 | Region X | Region X | On-Going | ₱179.5M | 82% | High risk79 | Flagged0.022 |
| 25K00148PREVENTIVE MAINTENANCE-TERTIARY ROADS JCT SH AGLAYAN-ZAMBOANGUITA RD - K1544 + 119 - K1549 + 109, K1554 + 462 - K1555 + 000, K1556 + 000 - K1557 + 029, K1564 + 146 - K1564 + 841.53 | Region X | Region X | On-Going | ₱155.3M | 60% | High risk93 | Flagged0.022 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 701 | 22K00048CONSTRUCTION OF BYPASS AND DIVERSION ROADS, SAYRE HIGHWAY BYPASS ROAD, MALUKO SECTION, CLIMBING LANES, BUKIDNON | Region X | Region X | Completed | ₱11M | 100% | Medium risk45 | —-0.084 |
| 702 | 24KC0011CONSTRUCTION OF KISOLON-SAN VICENTE BYPASS ROAD, PHASE 1, BARANGAY KISOLON, SUMILAO, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱9.9M | 100% | Medium risk45 | —-0.094 |
| 703 | 21KC0055CONSTRUCTION OF KISOLON-SAN VICENTE ALTERNATE ROAD, BARANGAY KISOLON, SUMILAO, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱7.9M | 100% | Medium risk45 | —-0.094 |
| 704 | 21K00354PREVENTIVE MAINTENANCE-PRIMARY ROAD, SAYRE HIGHWAY - K1490+970-K1491+027, K1491+056-K1491+175 | Region X | Region X | Completed | ₱6.2M | 100% | Medium risk44 | —-0.092 |
| 705 | 22KA0019PREVENTIVE MAINTENANCE ALONG SAYRE HIGHWAY K1517 + 660 - K1517 + 918, MALAYBALAY CITY, BUKIDNON BRGY. AGLAYAN, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱11.7M | 100% | Medium risk44 | —-0.093 |
| 706 | 23KA0029PREVENTIVE MAINTENANCE ALONG JCT SH-BANGCUD-MAILAG RD (BY-PASS RD) - K1525+(-341) - K1525+000, BRGY. BANGCUD, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱7.9M | 100% | Medium risk44 | —-0.093 |
| 707 | 18KA0026PREVENTIVE MAINTENANCE ALONG JCT SH-JP RIZAL - CARILLO CAPITOL- DPWH ROAD K1506+(-424) - K1506+(-093)MALAYBALAY CITY | Region X | Bukidnon 1st DEO | Completed | ₱11.3M | 100% | Medium risk44 | —-0.093 |
| 708 | 21K00355PREVENTIVE MAINTENANCE-PRIMARY ROAD, SAYRE HIGHWAY - K1492+540-K1493+000 | Region X | Region X | Completed | ₱9.6M | 100% | Medium risk44 | —-0.093 |
| 709 | 23KA0003PREVENTIVE MAINTENANCE ALONG SAYRE HIGHWAY K1481+783 - K1482+000, BRGY. LA FORTUNA, IMPASUG-ONG, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱5.1M | 100% | Medium risk44 | —-0.093 |
| 710 | 23KA0005PREVENTIVE MAINTENANCE ALONG JCT. SAYRE H-WAY-IMPASUGONG-PATULANGAN BY-PASS RD K1479+000 - K1479+429, POBLACION, IMPASUG-ONG, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱9.9M | 100% | Medium risk44 | —-0.094 |
| 711 | 22KA0025CONCRETING OF ACCESS ROAD LEADING TO CINCHONA REFORESTATION AREA, BRGY. KAATUAN, LANTAPAN, BUKIDNON BRGY. KAATUAN, LANTAPAN, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱9.8M | 100% | Medium risk44 | —-0.095 |
| 712 | 24KA0037PREVENTIVE MAINTENANCE ALONG JCT SH AGLAYAN-ZAMBOANGUITA RD - K1523 + 372 - K1523 + 577, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱5M | 100% | Medium risk44 | —-0.090 |
| 713 | 22KA0077PREVENTIVE MAINTENANCE ALONG KAPALONG-TALAINGOD-VALENCIA (BUKIDNON) RD - K1584+950 - K1585+230, SAN FERNANDO, BUKIDNON BRGY. LITTLE BAGUIO, SAN FERNANDO, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱12.8M | 100% | Medium risk44 | —-0.093 |
| 714 | 24KC0023CONSTRUCTION OF ROAD, BARANGAY PUNTIAN, SUMILAO, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱5M | 100% | Medium risk44 | —-0.093 |
| 715 | 22KA0022CONCRETING OF ROAD NRJ TO KINILATAN, CAWAYAN, LANTAPAN, BUKIDNON CONNECTING TO DOLE PHILS. AND DEL MONTE PHILS., INC. PACKING SHED IN SUPPORT OF THE BANANA AND PINEAPPLE INDUSTRIES, LANTAPAN, BUKIDNON, BRGY. CAWAYAN, LANTAPAN, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱9.8M | 100% | Medium risk44 | —-0.093 |
| 716 | 25KN0050REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, KAPALONG-TALAINGOD-VALENCIA (BUKIDNON) RD - K1590 + 578 - K1590 + 588 | Region X | Bukidnon 4th DEO | On-Going | ₱57.1M | 19% | Medium risk44 | —-0.010 |
| 717 | 17K00006ROAD UPGRADING(UNPAVED TO PAVED)BASED ON GRS,TB FOR UPGRADING TO PRS(HDM-4 PROJ. ANALYSIS)JCT.SH AGL | Region X | Region X | Completed | ₱86.2M | 100% | Medium risk44 | —-0.050 |
| 718 | 22ND0009REHABILITATION OF JCT. BCIR-NORTH MONTILLA BOULEVARD - SALVADOR CALO ROAD), BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Butuan City DEO | Completed | ₱86.8M | 100% | Medium risk44 | —-0.080 |
| 719 | 17KB0023REHAB/RECONST/UPGRADING OF DAMAGED PAVED NATIONAL ROADS BASED ON PMS/HDM-4, JDBQ RD | Region X | Bukidnon 2nd DEO | Completed | ₱48.6M | 100% | Medium risk44 | —-0.065 |
| 720 | 17KB0038CONSTRUCTION OF LOCAL ROAD, BARANGAY NATULONGAN, KIBAWE, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱14.8M | 100% | Medium risk43 | —-0.066 |
| 721 | 17KB0006CONST/UPGRADING/REHAB OF DRAINAGE ALONG NATIONAL ROADS, DOLOGON-KISANDAY-GUIN | Region X | Bukidnon 2nd DEO | Completed | ₱16.6M | 100% | Medium risk43 | —-0.066 |
| 722 | 17KA0007IMPROVEMENT/WIDENING OF SAYRE HIGHWAY - K1506 + 335 - K1506 + 835MALAYBALAY CITY | Region X | Bukidnon 1st DEO | Completed | ₱22.2M | 100% | Medium risk43 | —-0.058 |
| 723 | 17KA0037WIDENING OF ALALUM BR. (B01498MN) ALONG SAYRE HIGHWAYIMPASUG-ONG, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱42.9M | 100% | Medium risk42 | —-0.034 |
| 724 | 17KA0029WIDENING OF KABAKAHAN BR. (B01367MN) ALONG SAYRE HIGHWAYMALAYBALAY CITY, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱39.3M | 100% | Medium risk42 | —-0.035 |
| 725 | 17KA0026KOMOTAL BR. (B01366MN) ALONG SAYRE HIGHWAYKOMOTAL, SAYRE HIGHWAY | Region X | Bukidnon 1st DEO | Completed | ₱34.9M | 100% | Medium risk42 | —-0.036 |