Contractor dossier
147 projects on file, including joint ventures this contractor is part of.
Total projects
147
Total budget
₱7.3B
Average progress
94.7%
Completion rate
82.3%
Average risk score
53.2
Medium risk on average, out of 100
Flagged as unusual
4
2.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 79 | ₱4B | 54.6 | 3 | 92.6% |
| Region V | 30 | ₱2B | 58.7 | 0 | 99.3% |
| National Capital Region | 23 | ₱517.4M | 45.1 | 1 | 92.5% |
| Region IV-B | 6 | ₱41.7M | 35.3 | 0 | 100.0% |
| Region III | 5 | ₱501.5M | 50.5 | 0 | 100.0% |
| Region VI | 4 | ₱238.7M | 63.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 56 | ₱3.4B | 54.9 | 1 | 96.3% |
| Buildings and Facilities | 35 | ₱1.3B | 50.3 | 0 | 95.2% |
| Flood Control and Drainage | 27 | ₱1.7B | 51.9 | 1 | 94.2% |
| Bridges | 15 | ₱291M | 45.6 | 0 | 100.0% |
| OTHER | 10 | ₱425.6M | 61.4 | 2 | 87.7% |
| Water Provision and Storage | 2 | ₱35.5M | 66.5 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱56.2M | 91.9 | 0 | 70.4% |
| Bridges, Roads | 1 | ₱187.2M | 68.3 | 0 | 10.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DD0015ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG TUBIG NG BAYAN RIVER, P | Region IV-A | Batangas 4th DEO | On-Going | ₱56.2M | 70% | High risk92 | —-0.022 |
| 17GA0046ROAD WIDENING INCLUDING DRAINAGE AKLAN EAST RD. INCL. RROW K0309+680-K0311+175,KO317+521-K0318+271,A | Region VI | Aklan DEO | Completed | ₱62.5M | 100% | High risk79 | —-0.022 |
| 16DM0034REHABILITATION OF PROTECTIVE SEAWALL ALONG TAYABAS BAY, GENERAL LUNA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk77 | Flagged0.012 |
| 17FI0021OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG MASBATE-MILAGROS ROAD, K0024+850 - K0026+313 | Region V | Masbate 2nd DEO | Completed | ₱43.9M | 100% | High risk76 | —-0.025 |
| 23DD0118CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF MANILA-BATANGAS - BUGTONG | Region IV-A | Batangas 4th DEO | Completed | ₱93.6M | 100% | High risk74 | —-0.032 |
| 22DD0002ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS, SN JUAN-LAIYA RD - K0152 + 940 - K0154 + 394 | Region IV-A | Batangas 4th DEO | Completed | ₱71.2M | 100% | High risk72 | —-0.039 |
| 24DD0250CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY SABANG, LIPA CITY BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱76.8M | 54% | High risk72 | Flagged0.003 |
| 17DL0090C. MFO 3 - MAINTENANCE AND CONSTRUCTION SERVICE OF OTHER INFRASTRUCTURES 1. CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS, AND DECLARED TOURISM DESTINATIONS A. TO DECLARED TOURISM DESTINATIONS 2. CONCEPTION-ILAYA-ECO-TOURISM ROAD, | Region IV-A | Quezon 4th DEO | Completed | ₱54.1M | 100% | High risk69 | —-0.071 |
| 24DD0281ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CONSTRUCTION OF MANILA-BATANGAS - BUGTONG NA PULO - STAR TOLLWAY INTERCHANGE, PACKAGE G, BUGTONG NA PULO, L | Region IV-A | Batangas 4th DEO | On-Going | ₱140.4M | 19% | High risk69 | Flagged0.029 |
| 16G00180PROPOSED EVACUATION OF REGIONAL EVACUATION CENTER, BRGY. SAN PEDRO, SA JOSE, ANTIQUE | Region VI | Region VI | Completed | ₱35.4M | 100% | High risk69 | —-0.047 |
| 25D00108CONSTRUCTION OF BY-PASS AND DIVERSION ROADS LIPA CITY-PADRE GARCIA DIVERSION ROAD, PACKAGE Q, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱187.2M | 10% | High risk68 | —-0.006 |
| 17DM0095CONSTRUCTION OF LEVEL II WATER SUPPLY SYSTEM WITH WATER FILTRATION, POBLACION, AGDANGAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱17.8M | 100% | High risk67 | —-0.045 |
| 17DM0096CONSTRUCTION OF LEVEL II WATER SUPPLY SYSTEM WITH WATER FILTRATION, POBLACION, GEN. LUNA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱17.8M | 100% | High risk66 | —-0.045 |
| 19FK0051LOCAL PROGRAM-LOCAL ROADS AND BRIDGES-CONSTRUCTION OF SAN ISIDRO-SAN JUAN ROAD CASIGURAN, SORSOGON | Region V | Sorsogon DEO | Completed | ₱94.1M | 100% | High risk66 | —-0.087 |
| 22FL0005CONSTRUCTION OF FLOOD CONTROL STRUCTURE WITH DRAINAGE STRUCTURE ALONG PAWA RIVER, BRGY. PAWA, MATNOG | Region V | Sorsogon 2nd DEO | Completed | ₱98M | 100% | High risk65 | —-0.071 |
| 23FK0002NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-SORSOGON CITY COASTAL BYPASS ROAD, PACKAGE 12, SORSOGON | Region V | Sorsogon DEO | Completed | ₱96.5M | 100% | High risk65 | —-0.088 |
| 23FK0005NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-SORSOGON CITY COASTAL BYPASS ROAD, PACKAGE 13, SORSOGON CITY | Region V | Sorsogon DEO | Completed | ₱96.5M | 100% | High risk65 | —-0.088 |
| 23FL0024CONST/IMPRVT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TRIP) BULAN-MATNOG-STA. MAGDA | Region V | Sorsogon 2nd DEO | Completed | ₱93.4M | 100% | High risk65 | —-0.087 |
| 24D00078CONSTRUCTION OF BY-PASS AND DIVERSION ROADSLIPA CITY-PADRE GARCIA DIVERSION ROAD, PACKAGE N, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱187.8M | 51% | High risk65 | —-0.027 |
| 20F00044CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS: BULAN-MATNOG-STA. MAGDALENA-BULUSAN ROAD LEADING TO BULUSAN NATIONAL PARK, SORSOGON, BARANGAY CULASI, MATNOG, SORSOGON (2ND LEGISLAT | Region V | Region V | On-Going | ₱97.3M | 87% | High risk65 | —-0.022 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DD0281ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CONSTRUCTION OF MANILA-BATANGAS - BUGTONG NA PULO - STAR TOLLWAY INTERCHANGE, PACKAGE G, BUGTONG NA PULO, L | Region IV-A | Batangas 4th DEO | On-Going | ₱140.4M | 19% | High risk69 | Flagged0.029 |
| 23OA0024CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAN AGUSTIN, MALABON CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱29.1M | 23% | Medium risk58 | Flagged0.022 |
| 16DM0034REHABILITATION OF PROTECTIVE SEAWALL ALONG TAYABAS BAY, GENERAL LUNA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk77 | Flagged0.012 |
| 24DD0250CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY SABANG, LIPA CITY BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱76.8M | 54% | High risk72 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 20DO0079LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-BUILDING AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-CONSTRUCTION OF MULTI-PURPOSE BUILDING AND FACILITIES, SAN FRANCISCO ST., BRGY. PATUNHAY CARDONA, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱49.5M | 100% | Medium risk56 | —-0.082 |
| 52 | 22FK0009CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SUJI RIVER CONTROL PHASE II, CASIGURAN | Region V | Sorsogon DEO | Completed | ₱77.2M | 100% | Medium risk56 | —-0.080 |
| 53 | 19DP0072CONSTRUCTION/REPAIR/REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS- CONSTRUCTION OF MUNICIPAL HALL BUILDING (PHASE 1), BRGY. PAULI 2, RIZAL, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱48.6M | 100% | Medium risk55 | —-0.098 |
| 54 | 21GE0060CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION (COMPLETION) OF SEAWALL PROTECTION/BREAKWATER/RIPRAP, BARANGAYS, ZALDIVAR, MAGSAYSAY AND STO. ROSARIO, BUENAVISTA, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱91.7M | 100% | Medium risk55 | —-0.059 |
| 55 | 22DD0309CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE FACILITIES, CLARO M. RECTO COMMUNITY PARK, BARANGAY 7, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱48M | 100% | Medium risk55 | —-0.100 |
| 56 | 21F00010OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-REHABILITATION/IMPROVEMENT OF REVETMENT ALONG CADACAN RIVER, BARANGAY | Region V | Region V | Completed | ₱67.5M | 100% | Medium risk55 | —-0.081 |
| 57 | 22DD0098CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BRIDGE INCLUDING APPROACH | Region IV-A | Batangas 4th DEO | Completed | ₱56.2M | 100% | Medium risk55 | —-0.064 |
| 58 | 22DD0281CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF PAYAPA-BUKAL BRIDGE INCLUDING APPROACHES, PADRE GAR | Region IV-A | Batangas 4th DEO | Completed | ₱57.6M | 100% | Medium risk55 | —-0.063 |
| 59 | 23DD0235CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BUKAL BRIDGE INCLUDING APPROACHES, PADRE GARCIA, BA | Region IV-A | Batangas 4th DEO | Completed | ₱67.2M | 100% | Medium risk55 | —-0.062 |
| 60 | 22DD0064ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS, MANILA-BATANGAS RD - K0075 + 869 - K0077 + 043 | Region IV-A | Batangas 4th DEO | Completed | ₱84.2M | 100% | Medium risk54 | —-0.100 |
| 61 | 24DD0140CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF ROAD INCLUDING DRAINAGE, BRGY. PANSOL AND BRGY. MANG | Region IV-A | Batangas 4th DEO | On-Going | ₱62.4M | 99% | Medium risk54 | —-0.066 |
| 62 | 17DP0023CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS - WIDENING OF PERMANENT BRIDGES TO MORE THAN TWO (2) LANES - TALAHIBING BR. 1 (B03144LZ) ALONG SAN PABLO- RIZAL-NAGCARLAN-LILIW RD. | Region IV-A | Laguna 3rd DEO | Completed | ₱10.7M | 100% | Medium risk54 | —-0.040 |
| 63 | 22DM0022NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - GUMACA-PITOGO-MULANAY - SN NARCISO RD - K0251 + 173 - K0253 + 017, K0253 + 060 - K0254 + 611CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱65.1M | 100% | Medium risk54 | —-0.099 |
| 64 | 17DM0021CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES, GANGAHIN BR. (B02531LZ) ALONG GUMACA-PITOGO-MULANAY-SN NARCISO RD, BARANGAY GANGAHIN, PITOGO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱8.9M | 100% | Medium risk54 | —-0.037 |
| 65 | 19F00082LOCAL PROGRAM:CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL ROADS-CONSTRUCTION OF ROAD, HAWAN-MAMANGAL ROAD, VIRAC, CATANDUANES, VIRAC, CATANDUANES (CATANDUANES LONE DISTR | Region V | Region V | Completed | ₱48.3M | 100% | Medium risk53 | —-0.093 |
| 66 | 19F00081LOCAL PROGRAM:CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL ROADS-CONSTRUCTION OF ROAD, CAVINITAN-PAJO SAN ISIDRO ROAD, VIRAC, CATANDUANES, VIRAC, CATANDUANES (CATANDUANES L | Region V | Region V | Completed | ₱48.2M | 100% | Medium risk53 | —-0.097 |
| 67 | 19FH0040PREVENTIVE MAINTENANCE OF ROAD-ASPHALT OVERLAY, CATANDUANES CIRCUMFERENTIAL ROAD K0003+000-K0005+009 | Region V | Catanduanes DEO | Completed | ₱49M | 100% | Medium risk53 | —-0.098 |
| 68 | 25DD0031ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG TUBIG NG BAYAN RIVER, B | Region IV-A | Batangas 4th DEO | On-Going | ₱56.2M | 38% | Medium risk53 | —-0.032 |
| 69 | 23DD0265CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT ALONG TUBIG NA BAYAN RIVER (BANABA, CAWONGAN AND BUKAL SECTION), PADRE GARCIA, | Region IV-A | Batangas 4th DEO | Completed | ₱74.3M | 100% | Medium risk53 | —-0.083 |
| 70 | 17EA0071REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, CABUYO BRIDGE (B00011MQ) ALONG MARINDUQUE CIRCUMFE | Region IV-B | Marinduque DEO | Completed | ₱17.2M | 100% | Medium risk53 | —-0.030 |
| 71 | 19DD0348LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/ FACILITIES, REHABILITATION/ IMPROVEMENT OF LIPA CITY COMMUNITY PARK, PHASE II, AT BARANGAY 7, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱45.1M | 100% | Medium risk52 | —-0.099 |
| 72 | 21DM0007NETWORK DEVELOPMENT: OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - ABUYON - BUENAVISTA RD- K0262+393 - K0265+141, SAN NARCISO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱53.4M | 100% | Medium risk52 | —-0.101 |
| 73 | 17EA0082REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, BIGLANG AWA BRIDGE (B00001MQ) ALONG MARINDUQUE CIR | Region IV-B | Marinduque DEO | Completed | ₱6.7M | 100% | Medium risk51 | —-0.028 |
| 74 | 19F00087LOCAL PROGRAM:CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL ROADS-CONSTRUCTION OF ROAD, BRGY. LICTIN-BONOT, SAN ANDRES, CATANDUANES, SAN ANDRES, CATANDUANES(CATANDUANES LONE | Region V | Region V | On-Going | ₱38.6M | 100% | Medium risk51 | —-0.030 |
| 75 | 25DD0032CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES, REHABILITATION OF ROAD, PACKAGE A, MUNICIPAL | Region IV-A | Batangas 4th DEO | On-Going | ₱46.8M | 100% | Medium risk51 | —-0.076 |