Contractor dossier
118 projects on file, including joint ventures this contractor is part of.
Total projects
118
Total budget
₱4.6B
Average progress
93.5%
Completion rate
81.4%
Average risk score
43.8
Medium risk on average, out of 100
Flagged as unusual
5
4.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 96 | ₱3.7B | 42.6 | 4 | 93.3% |
| National Capital Region | 14 | ₱378.2M | 43.1 | 0 | 100.0% |
| Region IV-A | 6 | ₱426.8M | 54.8 | 0 | 83.0% |
| Region VI | 2 | ₱158.7M | 73.9 | 1 | 90.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 44 | ₱2.5B | 49.1 | 3 | 92.5% |
| Buildings and Facilities | 37 | ₱1B | 38.4 | 1 | 93.2% |
| Roads | 30 | ₱919.1M | 38.0 | 0 | 94.5% |
| OTHER | 6 | ₱110.3M | 59.7 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱96M | 96.2 | 1 | 81.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GI0069CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, BARANGAY MANASA, ALIMODIAN, ILOILO (SITE 3) | Region VI | Iloilo 4th DEO | On-Going | ₱96M | 82% | High risk96 | Flagged0.027 |
| 24CC0548CONSTRUCTION OF FLOOD CONTROL STRUCTURE INCLUDING PUMPING STATION AND FLOOD GATE AT BARANGAY SANTO ROSARIO, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 0% | High risk81 | Flagged0.008 |
| 24CC0547CONSTRUCTION OF FLOOD CONTROL STRUCTURE INCLUDING PUMPING STATION AND FLOOD GATE AT BARANGAY CALERO CREEK, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 51% | High risk81 | —-0.006 |
| 25CC0330CONSTRUCTION OF PUMPING STATION AND FLOOD GATE AT CALERO CREEK, PHASE II, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.5M | 0% | High risk80 | Flagged0.005 |
| 24CC0560CONSTRUCTION OF NEW PANDI MUNICIPAL HALL, BARANGAY POBLACION, PANDI, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱95M | 13% | High risk80 | Flagged0.003 |
| 24CC0549CONSTRUCTION OF FLOOD CONTROL STRUCTURE WITH WATER PUMPING AT BARANGAY BAMBANG, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱96.5M | 94% | High risk79 | —-0.022 |
| 24CC0037CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG GUIGUINTO RIVER, BARANGAY DAUNGAN, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 24CC0050CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY BAGBAGUIN, PANDI, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 23CC0483REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER, BRGYS. PANGINAY TO WAWA (PHASE III), BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk77 | —-0.004 |
| 25CP0076CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE III, SITIO TALAMSI I-SITIO KA | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 24% | High risk77 | —-0.003 |
| 25CC0191CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE A) AT BARANGAY MALIS (PUROK 3), GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 64% | High risk76 | —-0.017 |
| 25CC0181CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE B) AT BARANGAY MALIS (PUROK 3), GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱77.2M | 81% | High risk76 | —-0.025 |
| 24C00592CONVERGENCE & SPL. SUPPORT PROG.-BASIC INFRA PROG.-MULTI-PURPOSE BLDGS./FACILITIES TO SUPP. SOCIAL SERVICES: 1.CONST. OF MPB BRGY. IBAYO, 2. CONST. OF MPB BRGY. PRENZA 1, 3. CONST. OF MPB, BRGY. LIAS, MARILAO, BULACAN, PROV. OF BULACAN | Region III | Region III | On-Going | ₱54.4M | 71% | High risk76 | —-0.027 |
| 24C00318CONVERGENCE & SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-REHABILITATION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BRGY. SAN PASCUAL, OBANDO, BULACAN | Region III | Region III | On-Going | ₱14.8M | 100% | High risk73 | —-0.042 |
| 24C00304CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEAD. TO MAJ./STRATEGIC PULIC BLDGS./FACILITIES, CONST. OF ROAD, FLAMENCO ST., BRGY. PANGHULO, OBANDO | Region III | Region III | On-Going | ₱47.5M | 92% | High risk73 | —-0.037 |
| 25C00495CONVERGENCE & SPL. SUPPORT PROG.-BASIC INFRASTRUCTURE PROG.-MULTI-PURPOSE BLDGS./FACILITIES TO SUPPORT SOCIAL SERVICES-CONST. OF MULTI-PURPOSE BLDG. 1.)BRGY. HEALTH CENTER, MARILAO 2.)BRGY. NAGBALON, MARILAO 3.) BRGY. PATUBIG, MARILAO, BULACAN, PROV. OF B | Region III | Region III | On-Going | ₱43.9M | 82% | High risk72 | —-0.037 |
| 24C00538CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING BULIRAN ELEMENTARY SCHOOL,BARANGAY BULIRAN,SAN MIGUEL,BULACAN | Region III | Region III | On-Going | ₱29.3M | 100% | High risk72 | —-0.042 |
| 24CC0638CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BOCAUE RIVER, BARANGAY BAMBANG (SITIO ATUBANG), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱46.3M | 98% | High risk70 | Flagged0.019 |
| 17CD0146IMPROVEMENT/REPAIR/REHABILITATION OF EXISTING FLOOD CONTROL OF ZAMORA PUMPING STATION AND ITS TRIBUTARIES, BARANGAY ZAMORA, MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱9.4M | 100% | High risk69 | —-0.064 |
| 17CD0025IMPROVEMENT/REHABILITATION OF CITYLAND, PULONG BUHANGIN, STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱9.4M | 100% | High risk69 | —-0.068 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GI0069CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, BARANGAY MANASA, ALIMODIAN, ILOILO (SITE 3) | Region VI | Iloilo 4th DEO | On-Going | ₱96M | 82% | High risk96 | Flagged0.027 |
| 24CC0638CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BOCAUE RIVER, BARANGAY BAMBANG (SITIO ATUBANG), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱46.3M | 98% | High risk70 | Flagged0.019 |
| 24CC0548CONSTRUCTION OF FLOOD CONTROL STRUCTURE INCLUDING PUMPING STATION AND FLOOD GATE AT BARANGAY SANTO ROSARIO, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 0% | High risk81 | Flagged0.008 |
| 25CC0330CONSTRUCTION OF PUMPING STATION AND FLOOD GATE AT CALERO CREEK, PHASE II, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.5M | 0% | High risk80 | Flagged0.005 |
| 24CC0560CONSTRUCTION OF NEW PANDI MUNICIPAL HALL, BARANGAY POBLACION, PANDI, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱95M | 13% | High risk80 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 25DC0188CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD ALONG TAAL LAKE | Region IV-A | Batangas 3rd DEO | On-Going | ₱94.1M | 70% | High risk61 | —-0.060 |
| 27 | 25DC0204CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD ALONG TAAL LAKE | Region IV-A | Batangas 3rd DEO | On-Going | ₱94.1M | 68% | High risk61 | —-0.060 |
| 28 | 25DC0205CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD ALONG TAAL LAKE | Region IV-A | Batangas 3rd DEO | On-Going | ₱94M | 80% | High risk61 | —-0.065 |
| 29 | 23CC0151CONSTRUCTION OF REVETMENT WALL AT BARANGAY TANGOS, STA. 01+120 TO STA. 01+520, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | Medium risk55 | —-0.079 |
| 30 | 23CC0133CONSTRUCTION OF REVETMENT WALL AT BARANGAY HINUKAY, STA. 02+780 TO STA. 03+180, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | Medium risk55 | —-0.078 |
| 31 | 23CC0131CONSTRUCTION OF REVETMENT WALL AT BARANGAY PIEL, STA, 01+820 TO STA. 02+220, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | Medium risk55 | —-0.080 |
| 32 | 24D00176CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, GENERAL NAKAR, QUEZON, (PACKAGE O) | Region IV-A | Region IV-A | On-Going | ₱84.1M | 80% | Medium risk53 | —-0.034 |
| 33 | 23GI0027CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - JCT BANCAL-LEON-ANTIQUE BDRY RD- K0048 + 495 - K0048 + 560 | Region VI | Iloilo 4th DEO | Completed | ₱62.7M | 100% | Medium risk52 | —-0.082 |
| 34 | 24OA0053REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS C-3 ROAD (RIGHT) (S02120LZ), NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.097 |
| 35 | 24OA0052REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS C-3 ROAD (LEFT) (S02121LZ), NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.097 |
| 36 | 19OB0317CONSTRUCTION OF MULTI-PURPOSE BUILDING AND LAUNDRY BUILDING INCLUDING GROUND IMPROVEMENT AND COMPLETION OF FACILITIES (NCMH), BRGY. MAUWAY, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱28.5M | 100% | Medium risk50 | —-0.100 |
| 37 | 24OA0037CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, MUZON RIVERWALL (PHASE 4), BRGY. MUZON, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.086 |
| 38 | 24OA0036CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, MUZON RIVERWALL (PHASE 3), BRGY. MUZON, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.086 |
| 39 | 19OA0099UPGRADE AND REHABILITATION OF PANGHULO OUTPOST BRGY. PANGHULO MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱9.6M | 100% | Medium risk48 | —-0.093 |
| 40 | 17OB0313REHABILITATION/IMPROVEMENT OF DRAINAGE SYSTEM AT SAN GABRIEL VIA SAN VENANCIO STREET, SAN JORGE, AND E. FERNANDEZ ST., SAN JUAN CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱13.9M | 100% | Medium risk48 | —-0.064 |
| 41 | 18OB0445CONSTRUCTION OF BYPASS ROAD (MARCOS HIGHWAY TO J.P. RIZAL ST.), MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱32.1M | 100% | Medium risk47 | —-0.099 |
| 42 | 23CC0537CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS ALONG BALAGTAS RIVER PANGINAY (TRIBUTARY SECTION) (LS) BALAGTAS, BULACAN STA. 013+200 TO STA. 013+350 | Region III | Bulacan 1st DEO | Completed | ₱69.5M | 100% | Medium risk47 | —-0.026 |
| 43 | 22D00026FY 2022 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS BACOOR DIVERSION ROAD, PACKAGE 1, CAVITE | Region IV-A | Region IV-A | Completed | ₱23.9M | 100% | Medium risk46 | —-0.093 |
| 44 | 23CC0544CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS ALONG BALAGTAS RIVER PANGINAY (LS) BALAGTAS, BULACAN STA. 014+980 TO STA. 015+130 | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | Medium risk46 | —-0.026 |
| 45 | 23DF0080REHAB. OF DISASTER-RELATED INFRASTRUCTURES AND OTHER FACILITIES REHAB. OF DAMAGED INFRASTRUCTURES WROUGHT BY TYPHOON PAENG REHAB. OF REVETMENT ALONG CANAS RIVER, BRGY. PINAGTIPUNAN, GEN. TRIAS,CAVITE STA.0+000-STA.0+200 | Region IV-A | Cavite 1st DEO | Completed | ₱36.5M | 100% | Medium risk46 | —-0.087 |
| 46 | 23C00120CONVERGENCE & SPL. SUPPORT PROG.-BASIC INFRA. PROG. 1.MPB BRGY. BAGONG BUHAY 1, 2. MPB BRGY. GUMAOC EAST. 3. MPB CITY COLLEGE BRGY. MINUYAN I, 4. MPB BRGY. MUZON, 5. MPB BRGY. SAN MARTIN, 6. MPB BRGY. CITRUS, 7. MPB BRGY. MINUYAN 1, SJDM, PROV. OF BULACAN | Region III | Region III | Completed | ₱59.4M | 100% | Medium risk46 | —-0.096 |
| 47 | 22OG0097REHABILITATION OF SAN JUAN RIVER, PHASE I, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱43.1M | 100% | Medium risk46 | —-0.088 |
| 48 | 23C00206CONVERGENCE & SPL. SUPPORT PROG.-BASIC INFRA PROG.-MULTI-PURPOSE BLDGS./FACILITIES TO SUPPORT SOCIAL SERVICES: 1. CONST. OF MPB AT BRGY. ABANGAN SUR, MARILAO 2. CONST. OF MPB LIWASANG PANGKALIKASAN NG MARILAO, BRGY. PRENZA I, 3. CONST. OF MPB, BRGY. STA. | Region III | Region III | Completed | ₱84.1M | 100% | Medium risk46 | —-0.090 |
| 49 | 23C00207CONVERGENCE & SPL. SUPPORT PROG.-BIF-MULTI-PURPOSE BLDGS./FACILITIES TO SUPPORT SOCIAL SERVICES: 1. CONST. OF MPB, BRGY. BANCAL, MEYCAUAYAN CITY, BULACAN, 2. CONST. OF MPB, PANDAYAN ELEM. SCHOOL, BRGY. PANDAYAN, CITY OF MEYCAUAYAN, BULACAN, PROV. OF BUL. | Region III | Region III | Completed | ₱59.4M | 100% | Medium risk46 | —-0.097 |
| 50 | 18OB0299REHABILITATION/IMPROVEMENT OF DRAINAGE ALONG SAN JUAN-SANTOLAN ROAD, SAN JUAN CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱8.7M | 100% | Medium risk46 | —-0.088 |