Contractor dossier
162 projects on file, including joint ventures this contractor is part of.
Total projects
162
Total budget
₱9.1B
Average progress
92.8%
Completion rate
67.9%
Below 70%
Average risk score
52.9
Medium risk on average, out of 100
Flagged as unusual
7
4.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 107 | ₱7B | 54.0 | 7 | 92.6% |
| National Capital Region | 49 | ₱1.7B | 50.0 | 0 | 94.4% |
| Region IV-A | 4 | ₱260.8M | 56.0 | 0 | 76.5% |
| Central Office | 2 | ₱189M | 63.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 101 | ₱7.1B | 53.8 | 4 | 93.1% |
| Roads | 49 | ₱1.4B | 48.5 | 0 | 91.4% |
| OTHER | 4 | ₱204.6M | 66.0 | 1 | 100.0% |
| GAA 2025 SSP | 3 | ₱157.7M | 91.7 | 2 | 86.3% |
| Buildings and Facilities | 2 | ₱14.6M | 26.9 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱26.6M | 89.0 | 0 | 100.0% |
| Bridges | 1 | ₱212.3M | 53.7 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱4.2M | 25.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CC0172CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE A), BARANGAY BAMBANG (SITIO KAKULISAN), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 79% | High risk95 | Flagged0.006 |
| 25CC0177CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE B), BARANGAY BAMBANG (SITIO KAKULISAN), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 80% | High risk95 | Flagged0.005 |
| 25OB0002ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SHAW BLVD - K0008 + 133 - K0010 + 475 | National Capital Region | Metro Manila 1st DEO | On-Going | ₱26.6M | 100% | High risk89 | —-0.023 |
| 24CD0297CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER, NLEX LAMBAKIN SECTION, STA. 10+455 STA. 10+680, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 100% | High risk86 | Flagged0.045 |
| 25OB0291INSTALLATION OF ROAD SAFETY DEVICES AT BARANGAY CONCEPCION DOS, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱9.5M | 100% | High risk85 | —-0.005 |
| 24CD0296CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER, NLEX LAMBAKIN SECTION, STA. 10+680 STA. 10+905, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 98% | High risk82 | Flagged0.030 |
| 24C00096FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE), BARANGAY SIBUL, SAN MIGUEL, BULACAN, PHASE II | Region III | Region III | On-Going | ₱95M | 71% | High risk81 | —-0.011 |
| 24C00087FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE), BARANGAY SIBUL, SAN MIGUEL, BULACAN, PHASE I | Region III | Region III | On-Going | ₱95M | 100% | High risk81 | —-0.023 |
| 24C00489SUSTAINABLE INFRAS. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRAS./FACILITIES-CONST. OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER TRIBUTARY,MARUGAY-RUGAY BRIDGE 2,(UPSTREAM), BRGY.GARLANG,SAN ILDEFONSO,BUL | Region III | Region III | On-Going | ₱95M | 99% | High risk81 | —-0.020 |
| 25C00350SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 1, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 86% | High risk81 | —-0.022 |
| 25C00351SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 2, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 86% | High risk81 | —-0.022 |
| 24CC0045CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PHASE II) AT BARANGAY PIEL, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 24CC0040CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY PIEL, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.052 |
| 24CC0030CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY SAN ROQUE, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 24CC0023CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PHASE II) AT BARANGAY SAN ROQUE, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 25CD0181REHABILITATION OF ROAD, BARANGAYS LALAKHAN, SANTA CLARA, SANTA CRUZ AND MANGGAHAN, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 51% | High risk76 | —-0.020 |
| 23CC0550CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS ALONG GUIGUINTO RIVER BRGY, MALIS GUIGUINTO, BULACAN STA. 004+360 TO STA. 004+560 | Region III | Bulacan 1st DEO | On-Going | ₱72.4M | 79% | High risk76 | Flagged0.034 |
| 25CC0325CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE A) AT BARANGAY SANTA CRUZ (PUROK 5), GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 29% | High risk76 | —-0.011 |
| 25CC0068CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE B) AT BARANGAY SANTA CRUZ (PUROK 5), GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 31% | High risk76 | —-0.011 |
| 25C00500ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS-MAHARLIKA HIGHWAY, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱114.1M | 5% | High risk76 | —-0.004 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CD0297CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER, NLEX LAMBAKIN SECTION, STA. 10+455 STA. 10+680, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 100% | High risk86 | Flagged0.045 |
| 23CC0550CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS ALONG GUIGUINTO RIVER BRGY, MALIS GUIGUINTO, BULACAN STA. 004+360 TO STA. 004+560 | Region III | Bulacan 1st DEO | On-Going | ₱72.4M | 79% | High risk76 | Flagged0.034 |
| 24CD0296CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER, NLEX LAMBAKIN SECTION, STA. 10+680 STA. 10+905, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 98% | High risk82 | Flagged0.030 |
| 24CD0298CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER, NLEX LAMBAKIN SECTION, STA. 10+905 STA. 11+130, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 100% | High risk69 | Flagged0.014 |
| 24CD0315CONSTRUCTION MACAIBAN PATAG ROAD DIKE (PHASE I), SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱72.4M | 83% | Medium risk48 | Flagged0.011 |
| 25CC0172CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE A), BARANGAY BAMBANG (SITIO KAKULISAN), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 79% | High risk95 | Flagged0.006 |
| 25CC0177CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE B), BARANGAY BAMBANG (SITIO KAKULISAN), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 80% | High risk95 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 23OB0410IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER AT STA. 15 + 850 TO STA. 16 + 000, RIGHT BANK, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱93M | 100% | High risk62 | —-0.078 |
| 52 | 24OF0137PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) ALONG QUIRINO HIGHWAY (S05621LZ) K0010 + (-127) - K0012 + 000, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱115.8M | 100% | High risk61 | —-0.084 |
| 53 | 24CD0031CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER, STA. 02+400 STA. 02+550 (LIPUTAN-UBIHAN SECTION) MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 92% | High risk61 | —-0.041 |
| 54 | 24CD0030CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER, STA. 02+250 STA. 02+400 (LIPUTAN-UBIHAN SECTION) MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 92% | High risk61 | —-0.041 |
| 55 | 23C00195CONVERGENCE & SPECIAL SUPPORT PROGAM - SUSTAINABLE INFRAS. PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRAS./ FACILITIES - CONST. OF FLOOD CONTROL STRUCTURE ALONG MAG ASAWA SAPA CREEK PHASE 5, SAN ILDEFONSO, BUL | Region III | Region III | On-Going | ₱95.1M | 100% | Medium risk59 | —-0.039 |
| 56 | 23C00199CONVERGENCE & SPECIAL SUPPORT PROG.-SUSTAINABLE INFRA. PROJ. ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTS. PROTECTING PUBLIC INFRA./FACILITIES-CONST. OF FLOOD CONTROL STRUCT. ALONG MAG-ASAWA SAPA CREEK PHASE 6, SAN ILDEFONSO, BULACAN | Region III | Region III | On-Going | ₱95.1M | 100% | Medium risk59 | —-0.039 |
| 57 | 25CJ0073CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUSUBAEN CREEK (SEGMENT 26), RAMOS, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 62% | Medium risk59 | —-0.029 |
| 58 | 25CJ0080CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUSUBAEN CREEK (SEGMENT 25), RAMOS, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 70% | Medium risk59 | —-0.034 |
| 59 | 25CD0028CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN JOSE RIVER, STA. 08+620 STA. 08+920 (PARADA - SAN VICENTE SECTION), SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 64% | Medium risk58 | —-0.037 |
| 60 | 25CD0031CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN JOSE RIVER, STA. 07+720 STA. 08+020 (PARADA - SAN VICENTE SECTION), SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 67% | Medium risk57 | —-0.038 |
| 61 | 25CD0030CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN JOSE RIVER, STA. 08+020 STA. 08+320 (PARADA - SAN VICENTE SECTION), SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 66% | Medium risk57 | —-0.038 |
| 62 | 23CD0066CONSTRUCTION OF FLOOD CONTROL STRUCTURE ILOG BAYAN RIVER, SAN JOSE DEL MONTE CITY, BULACANCONTRACT LOCATION: SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.080 |
| 63 | 23CD0064CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NCR/BULACAN BDRY. BIGTE IPO DAM ROAD, ILOG BAYAN RIVER, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.080 |
| 64 | 25CD0081CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAYPOMBO RIVER, STA. 14+250 - STA. 14+650 (M. SAPA SECTION), SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 64% | Medium risk57 | —-0.037 |
| 65 | 24CD0055CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ILOG BAYAN RIVER, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.080 |
| 66 | 24CD0059CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ILOG BAYAN RIVER (BIGTE IPO DAM ROAD), SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.080 |
| 67 | 24CD0058CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, BARANGAY KAYPIAN, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.078 |
| 68 | 24CD0096CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BOCAUE SANTA MARIA RIVER, STA. 02+200 STA. 02+350 (PHASE 1), BARANGAY UBIHAN, MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.078 |
| 69 | 24CD0097CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BOCAUE SANTA MARIA RIVER, STA. 02+200 STA. 02+350 (PHASE 2), BARANGAY UBIHAN, MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.078 |
| 70 | 24CD0098CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BOCAUE SANTA MARIA RIVER, STA. 02+350 STA. 02+500 (PHASE 1), BARANGAY UBIHAN, MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.079 |
| 71 | 23CC0083CONSTRUCTION OF RIVER CONTROL PROJECT ALONG ANGAT RIVER, TIAONG SECTION, STA. 08+370 TO STA. 08+700, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | Medium risk55 | —-0.078 |
| 72 | 23CC0082CONSTRUCTION OF RIVERWALL ALONG ANGAT RIVER, TIAONG SECTION, STA. 08+710 TO STA. 09+040, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | Medium risk55 | —-0.081 |
| 73 | 23CC0134CONSTRUCTION OF RIVERWALL AT BARANGAY HINUKAY, STA. 02+370 TO STA. 02+770, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | Medium risk55 | —-0.078 |
| 74 | 23CC0132CONSTRUCTION OF RIVER CONTROL PROJECT AT BARANGAY HINUKAY, STA. 01+960 TO STA. 02+360, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | Medium risk55 | —-0.078 |
| 75 | 24CD0129ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE SECONDARY ROADS - MEYCAUAYAN-CAMALIG-BAHAY PARI RD K0020+(-854) K0020+(-194), K0020+198 K0020+596 | Region III | Bulacan 2nd DEO | Completed | ₱144.7M | 100% | Medium risk55 | —-0.079 |