Opening the dossier…
Opening the dossier…
Contractor dossier
162 projects on file, including joint ventures this contractor is part of.
Total projects
162
Total budget
₱9.1B
Average progress
92.8%
Completion rate
67.9%
Below 70%
Average risk score
52.9
Medium risk on average, out of 100
Flagged as unusual
7
4.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 107 | ₱7B | 54.0 | 7 | 92.6% |
| National Capital Region | 49 | ₱1.7B | 50.0 | 0 | 94.4% |
| Region IV-A | 4 | ₱260.8M | 56.0 | 0 | 76.5% |
| Central Office | 2 | ₱189M | 63.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 101 | ₱7.1B | 53.8 | 4 | 93.1% |
| Roads | 49 | ₱1.4B | 48.5 | 0 | 91.4% |
| OTHER | 4 | ₱204.6M | 66.0 | 1 | 100.0% |
| GAA 2025 SSP | 3 | ₱157.7M | 91.7 | 2 | 86.3% |
| Buildings and Facilities | 2 | ₱14.6M | 26.9 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱26.6M | 89.0 | 0 | 100.0% |
| Bridges | 1 | ₱212.3M | 53.7 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱4.2M | 25.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CC0172CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE A), BARANGAY BAMBANG (SITIO KAKULISAN), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 79% | High risk95 | Flagged0.006 |
| 25CC0177CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE B), BARANGAY BAMBANG (SITIO KAKULISAN), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 80% | High risk95 | Flagged0.005 |
| 25OB0002ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SHAW BLVD - K0008 + 133 - K0010 + 475 | National Capital Region | Metro Manila 1st DEO | On-Going | ₱26.6M | 100% | High risk89 | —-0.023 |
| 24CD0297CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER, NLEX LAMBAKIN SECTION, STA. 10+455 STA. 10+680, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 100% | High risk86 | Flagged0.045 |
| 25OB0291INSTALLATION OF ROAD SAFETY DEVICES AT BARANGAY CONCEPCION DOS, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱9.5M | 100% | High risk85 | —-0.005 |
| 24CD0296CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER, NLEX LAMBAKIN SECTION, STA. 10+680 STA. 10+905, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 98% | High risk82 | Flagged0.030 |
| 24C00096FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE), BARANGAY SIBUL, SAN MIGUEL, BULACAN, PHASE II | Region III | Region III | On-Going | ₱95M | 71% | High risk81 | —-0.011 |
| 24C00087FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE), BARANGAY SIBUL, SAN MIGUEL, BULACAN, PHASE I | Region III | Region III | On-Going | ₱95M | 100% | High risk81 | —-0.023 |
| 24C00489SUSTAINABLE INFRAS. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRAS./FACILITIES-CONST. OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER TRIBUTARY,MARUGAY-RUGAY BRIDGE 2,(UPSTREAM), BRGY.GARLANG,SAN ILDEFONSO,BUL | Region III | Region III | On-Going | ₱95M | 99% | High risk81 | —-0.020 |
| 25C00350SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 1, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 86% | High risk81 | —-0.022 |
| 25C00351SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 2, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 86% | High risk81 | —-0.022 |
| 24CC0045CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PHASE II) AT BARANGAY PIEL, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 24CC0040CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY PIEL, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.052 |
| 24CC0030CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY SAN ROQUE, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 24CC0023CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PHASE II) AT BARANGAY SAN ROQUE, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 25CD0181REHABILITATION OF ROAD, BARANGAYS LALAKHAN, SANTA CLARA, SANTA CRUZ AND MANGGAHAN, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 51% | High risk76 | —-0.020 |
| 23CC0550CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS ALONG GUIGUINTO RIVER BRGY, MALIS GUIGUINTO, BULACAN STA. 004+360 TO STA. 004+560 | Region III | Bulacan 1st DEO | On-Going | ₱72.4M | 79% | High risk76 | Flagged0.034 |
| 25CC0325CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE A) AT BARANGAY SANTA CRUZ (PUROK 5), GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 29% | High risk76 | —-0.011 |
| 25CC0068CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE B) AT BARANGAY SANTA CRUZ (PUROK 5), GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 31% | High risk76 | —-0.011 |
| 25C00500ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS-MAHARLIKA HIGHWAY, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱114.1M | 5% | High risk76 | —-0.004 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CD0297CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER, NLEX LAMBAKIN SECTION, STA. 10+455 STA. 10+680, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 100% | High risk86 | Flagged0.045 |
| 23CC0550CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS ALONG GUIGUINTO RIVER BRGY, MALIS GUIGUINTO, BULACAN STA. 004+360 TO STA. 004+560 | Region III | Bulacan 1st DEO | On-Going | ₱72.4M | 79% | High risk76 | Flagged0.034 |
| 24CD0296CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER, NLEX LAMBAKIN SECTION, STA. 10+680 STA. 10+905, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 98% | High risk82 | Flagged0.030 |
| 24CD0298CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER, NLEX LAMBAKIN SECTION, STA. 10+905 STA. 11+130, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 100% | High risk69 | Flagged0.014 |
| 24CD0315CONSTRUCTION MACAIBAN PATAG ROAD DIKE (PHASE I), SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱72.4M | 83% | Medium risk48 | Flagged0.011 |
| 25CC0172CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE A), BARANGAY BAMBANG (SITIO KAKULISAN), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 79% | High risk95 | Flagged0.006 |
| 25CC0177CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE B), BARANGAY BAMBANG (SITIO KAKULISAN), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 80% | High risk95 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 23CC0417NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES - BONGA MENOR FLYOVER AT PLARIDEL BYPASS (BUSTOS SECTION), BULACAN | Region III | Bulacan 1st DEO | Completed | ₱212.3M | 100% | Medium risk54 | —-0.031 |
| 77 | 23C00271ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LZ), SAN MIGUEL, BULACAN | Region III | Region III | Completed | ₱95.1M | 100% | Medium risk51 | —-0.092 |
| 78 | 24CD0128ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE SANTA MARIA NORZAGARAY ROAD K0039+649 K0040+000, K0040+000 K0040+226, K0042+000 K0042+836 | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk50 | —-0.093 |
| 79 | 21DQ0035ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SLOPE PROTECTION ALONG IMUS | Region IV-A | Cavite 3rd DEO | Completed | ₱48.2M | 100% | Medium risk50 | —-0.086 |
| 80 | 24CD0315CONSTRUCTION MACAIBAN PATAG ROAD DIKE (PHASE I), SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱72.4M | 83% | Medium risk48 | Flagged0.011 |
| 81 | 17OB0309CONSTRUCTION OF RCBC INCLUDING DRAINAGE LATERALS ALONG BONANZA CREEK, FORTUNE AVENUE, BRGY. FORTUNE, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱18.6M | 100% | Medium risk47 | —-0.064 |
| 82 | 25OF0003PREVENTIVE MAINTENANCE - SECONDARY ROADS - G ARANETA AVE - K0011+-278 - K0011+202, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱36.1M | 100% | Medium risk47 | —-0.070 |
| 83 | 25OB0078REHABILITATION OF ROAD AT BARANGAY PINAGBUHATAN, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱38.4M | 100% | Medium risk47 | —-0.098 |
| 84 | 17OB0312REHABILITATION OF MARIKINA RIVER DRAINAGE OUTFALL INCLUDING LATERALS, FOR THE 2ND DISTRICT, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱18.6M | 100% | Medium risk47 | —-0.064 |
| 85 | 24OB0349REHABILITATION OF ST. MARTIN ROAD, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱28.8M | 100% | Medium risk47 | —-0.099 |
| 86 | 17OB0280REHABILITATION OF NANGKA RIVER OUTFALL INCLUDING LATERALS, BRGY. NANGKA, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱18.6M | 100% | Medium risk47 | —-0.064 |
| 87 | 25OB0081REHABILITATION OF ROAD AT M.H. DEL PILAR, PASIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱24M | 0% | Medium risk46 | —-0.037 |
| 88 | 25OB0005ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - BONI AVE - K0009 + 498 - K0011 + 415 | National Capital Region | Metro Manila 1st DEO | On-Going | ₱22.1M | 0% | Medium risk46 | —-0.037 |
| 89 | 25OB0079REHABILITATION OF ROAD AT BARANGAY STA. LUCIA, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱24M | 100% | Medium risk46 | —-0.099 |
| 90 | 25OB0076REHABILITATION OF EXCHANGE ROAD, BARANGAY SAN ANTONIO, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱24M | 100% | Medium risk46 | —-0.099 |
| 91 | 25OB0080REHABILITATION OF ROAD AT ESCRIVA DRIVE, BARANGAY SAN ANTONIO, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱24M | 100% | Medium risk46 | —-0.100 |
| 92 | 24OB0348REHABILITATION OF ROAD, MARKET AVENUE EXTENSION, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱19.2M | 100% | Medium risk46 | —-0.098 |
| 93 | 25OB0041ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - BAYANBAYAN AVE - K0018 + 000 - K0018 + 376 | National Capital Region | Metro Manila 1st DEO | On-Going | ₱28.5M | 100% | Medium risk46 | —-0.070 |
| 94 | 24OB0347REHABILITATION OF ORANBO ST., PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱14.4M | 100% | Medium risk46 | —-0.100 |
| 95 | 22OB0324IMPROVEMENT OF MARIKINA HEIGHTS ROAD NETWORK, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱19M | 100% | Medium risk46 | —-0.095 |
| 96 | 22OB0305REHABILITATION OF WESTBANK ROAD, MANGGAHAN FLOODWAY, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱16.8M | 100% | Medium risk46 | —-0.099 |
| 97 | 21DQ0034LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONCRETING/IMPROVEMENT OF ROAD, BARANGAY SAN MIGUEL I & II, PHASE II, DASMARIÑAS CITY, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱9.9M | 100% | Medium risk46 | —-0.106 |
| 98 | 23OB0103BANK IMPROVEMENT OF SLOPE PROTECTION ALONG MARIKINA RIVER (PACKAGE 7), PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱46.5M | 100% | Medium risk46 | —-0.072 |
| 99 | 19OB0004CONSTRUCTION OF REVETMENT WALL ALONG SAN JUAN RIVER, SAN JUAN CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱27.9M | 100% | Medium risk46 | —-0.089 |
| 100 | 25OB0294INSTALLATION OF ORO VISTA SUBDIVISION ROAD SAFETY DEVICES, BARANGAY CONCEPCION UNO, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱9.5M | 25% | Medium risk46 | —-0.045 |