Contractor dossier
162 projects on file, including joint ventures this contractor is part of.
Total projects
162
Total budget
₱9.1B
Average progress
92.8%
Completion rate
67.9%
Below 70%
Average risk score
52.9
Medium risk on average, out of 100
Flagged as unusual
7
4.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 107 | ₱7B | 54.0 | 7 | 92.6% |
| National Capital Region | 49 | ₱1.7B | 50.0 | 0 | 94.4% |
| Region IV-A | 4 | ₱260.8M | 56.0 | 0 | 76.5% |
| Central Office | 2 | ₱189M | 63.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 101 | ₱7.1B | 53.8 | 4 | 93.1% |
| Roads | 49 | ₱1.4B | 48.5 | 0 | 91.4% |
| OTHER | 4 | ₱204.6M | 66.0 | 1 | 100.0% |
| GAA 2025 SSP | 3 | ₱157.7M | 91.7 | 2 | 86.3% |
| Buildings and Facilities | 2 | ₱14.6M | 26.9 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱26.6M | 89.0 | 0 | 100.0% |
| Bridges | 1 | ₱212.3M | 53.7 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱4.2M | 25.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CC0172CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE A), BARANGAY BAMBANG (SITIO KAKULISAN), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 79% | High risk95 | Flagged0.006 |
| 25CC0177CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE B), BARANGAY BAMBANG (SITIO KAKULISAN), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 80% | High risk95 | Flagged0.005 |
| 25OB0002ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SHAW BLVD - K0008 + 133 - K0010 + 475 | National Capital Region | Metro Manila 1st DEO | On-Going | ₱26.6M | 100% | High risk89 | —-0.023 |
| 24CD0297CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER, NLEX LAMBAKIN SECTION, STA. 10+455 STA. 10+680, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 100% | High risk86 | Flagged0.045 |
| 25OB0291INSTALLATION OF ROAD SAFETY DEVICES AT BARANGAY CONCEPCION DOS, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱9.5M | 100% | High risk85 | —-0.005 |
| 24CD0296CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER, NLEX LAMBAKIN SECTION, STA. 10+680 STA. 10+905, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 98% | High risk82 | Flagged0.030 |
| 24C00096FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE), BARANGAY SIBUL, SAN MIGUEL, BULACAN, PHASE II | Region III | Region III | On-Going | ₱95M | 71% | High risk81 | —-0.011 |
| 24C00087FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE), BARANGAY SIBUL, SAN MIGUEL, BULACAN, PHASE I | Region III | Region III | On-Going | ₱95M | 100% | High risk81 | —-0.023 |
| 24C00489SUSTAINABLE INFRAS. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRAS./FACILITIES-CONST. OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER TRIBUTARY,MARUGAY-RUGAY BRIDGE 2,(UPSTREAM), BRGY.GARLANG,SAN ILDEFONSO,BUL | Region III | Region III | On-Going | ₱95M | 99% | High risk81 | —-0.020 |
| 25C00350SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 1, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 86% | High risk81 | —-0.022 |
| 25C00351SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 2, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 86% | High risk81 | —-0.022 |
| 24CC0045CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PHASE II) AT BARANGAY PIEL, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 24CC0040CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY PIEL, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.052 |
| 24CC0030CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY SAN ROQUE, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 24CC0023CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PHASE II) AT BARANGAY SAN ROQUE, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 25CD0181REHABILITATION OF ROAD, BARANGAYS LALAKHAN, SANTA CLARA, SANTA CRUZ AND MANGGAHAN, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 51% | High risk76 | —-0.020 |
| 23CC0550CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS ALONG GUIGUINTO RIVER BRGY, MALIS GUIGUINTO, BULACAN STA. 004+360 TO STA. 004+560 | Region III | Bulacan 1st DEO | On-Going | ₱72.4M | 79% | High risk76 | Flagged0.034 |
| 25CC0325CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE A) AT BARANGAY SANTA CRUZ (PUROK 5), GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 29% | High risk76 | —-0.011 |
| 25CC0068CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE B) AT BARANGAY SANTA CRUZ (PUROK 5), GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 31% | High risk76 | —-0.011 |
| 25C00500ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS-MAHARLIKA HIGHWAY, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱114.1M | 5% | High risk76 | —-0.004 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CD0297CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER, NLEX LAMBAKIN SECTION, STA. 10+455 STA. 10+680, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 100% | High risk86 | Flagged0.045 |
| 23CC0550CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS ALONG GUIGUINTO RIVER BRGY, MALIS GUIGUINTO, BULACAN STA. 004+360 TO STA. 004+560 | Region III | Bulacan 1st DEO | On-Going | ₱72.4M | 79% | High risk76 | Flagged0.034 |
| 24CD0296CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER, NLEX LAMBAKIN SECTION, STA. 10+680 STA. 10+905, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 98% | High risk82 | Flagged0.030 |
| 24CD0298CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER, NLEX LAMBAKIN SECTION, STA. 10+905 STA. 11+130, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 100% | High risk69 | Flagged0.014 |
| 24CD0315CONSTRUCTION MACAIBAN PATAG ROAD DIKE (PHASE I), SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱72.4M | 83% | Medium risk48 | Flagged0.011 |
| 25CC0172CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE A), BARANGAY BAMBANG (SITIO KAKULISAN), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 79% | High risk95 | Flagged0.006 |
| 25CC0177CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BOCAUE RIVER (PACKAGE B), BARANGAY BAMBANG (SITIO KAKULISAN), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 80% | High risk95 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 23CD0119CONSTRUCTION OF POBLACION-MACAIBAN DIKE, SANTA MARIA, BULACAN (PHASE I) | Region III | Bulacan 2nd DEO | Completed | ₱86.8M | 100% | Medium risk37 | —-0.080 |
| 127 | 19CD0023REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG PALASAN RIVER, OBANDO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱23.3M | 100% | Medium risk37 | —-0.092 |
| 128 | 23C00198FLOOD MANAGEMENT PROG.-CONST./MAINT. OF FLOOD MITIGATION STRUCTS. & DRAINAGE SYS.-CONST. OF FLOOD CONTROL STRUCT. ALONG MAG-ASAWA SAPA CREEK PHASE 3, SAN ILDEFONSO, BULACAN | Region III | Region III | Completed | ₱86.8M | 100% | Medium risk36 | —-0.081 |
| 129 | 23C00191FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE MAG-ASAWANG SAPA CREEK, SAN ILDEFONSO, BULACAN PHASE 2 | Region III | Region III | Completed | ₱57.9M | 100% | Medium risk35 | —-0.090 |
| 130 | 23CC0299CONSTRUCTION OF ROAD BARANGAY DUHAT, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱4.9M | 100% | Medium risk35 | —-0.106 |
| 131 | 23CC0300REHABILITATION OF ROAD, BARANGAY LOLOMBOY, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱4.9M | 100% | Medium risk35 | —-0.104 |
| 132 | 23CC0278CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY SULIVAN, BALIUAG, BULACAN (K003+821 TO K004+121) BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | Medium risk35 | —-0.087 |
| 133 | 23CC0282CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY SAN ROQUE, BALIUAG, BULACAN (K001+600 TO K001+900) BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | Medium risk35 | —-0.088 |
| 134 | 23CC0370CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY TILAPAYONG, BALIUAG, BULACAN (K000+761 TO K000+972.2), BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | Medium risk35 | —-0.090 |
| 135 | 22CC0269CONSTRUCTION OF RIVERBANK PROTECTION ALONG ANGAT RIVER CULIANIN TO CAMBAOG, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱57.9M | 100% | Medium risk35 | —-0.091 |
| 136 | 22CC0213CONSTRUCTION OF RIVERBANK PROTECTION ALONG BOCAUE RIVER, BRGY. TAAL, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱57.9M | 100% | Medium risk35 | —-0.088 |
| 137 | 21CC0090REHABILITATION OF ANGAT RIVER, BRGY. DAMPOL, STA. 00+000 - STA. 00+557, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱57.9M | 100% | Medium risk35 | —-0.091 |
| 138 | 22CD0154CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER STA. 11+400 STA. 12+700, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱48.2M | 100% | Medium risk34 | —-0.090 |
| 139 | 21CD0061CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVER (LAMBAKIN SECTION) BARANGAY LAMBAKIN, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱49M | 100% | Medium risk34 | —-0.093 |
| 140 | 21CD0121CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT MAASIM RIVER, DILIMAN II SECTION, DILIMAN II, STA. 000+000 STA. 000+350, SAN RAFAEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱48.6M | 100% | Medium risk34 | —-0.093 |
| 141 | 19CC0035CONSTRUCTION OF FLOOD CONTROL ALONG BOCAUE RIVER LOLOMBOY SECTION BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱23.3M | 100% | Medium risk33 | —-0.093 |
| 142 | 18CC0013CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG BOCAUE RIVER AT TURO SECTION BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱23.3M | 100% | Medium risk33 | —-0.093 |
| 143 | 20CD0015CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAN JOSE RIVER DULONG BAYAN AND MUZON, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱32.6M | 100% | Medium risk32 | —-0.093 |
| 144 | 22CD0036REHABILITATION OF ROAD AT BARANGAY BAGBAGUIN, STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱9.8M | 100% | Medium risk32 | —-0.105 |
| 145 | 22CC0293CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY HINUKAY, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49.5M | 100% | Medium risk32 | —-0.090 |
| 146 | 24CD0214IMPROVEMENT OF INTERSECTION STA. MARIA BYPASS ROAD (S01372LZ) K0031 + 181 AND STA. MARIA PANDI ROAD | Region III | Bulacan 2nd DEO | Completed | ₱9.8M | 100% | Medium risk32 | —-0.105 |
| 147 | 23CC0052CONSTRUCTION OF FLOOD CONTROL STRUCTURE SAN JOSE-BINTOG TRIBUTARIES OF ANGAT RIVER, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.090 |
| 148 | 20CD0020CONSTRUCTION OF SLOPE PROTECTION, BRGY. MUZON, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱33.9M | 100% | Medium risk32 | —-0.093 |
| 149 | 22CD0168CONSTRUCTION OF FLOOD CONTROL PROJECT, BARANGAY BAGBAGUIN, STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱9.9M | 100% | Medium risk32 | —-0.091 |
| 150 | 22CC0052IMPROVEMENT OF ROAD DIKE, BARANGAY TIBAG, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱4.9M | 100% | Medium risk30 | —-0.103 |