Opening the dossier…
Opening the dossier…
Contractor dossier
114 projects on file, including joint ventures this contractor is part of.
Total projects
114
Total budget
₱9.5B
Average progress
95.6%
Completion rate
72.8%
Average risk score
64.5
High risk on average, out of 100
Flagged as unusual
2
1.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 113 | ₱9.4B | 64.5 | 2 | 95.6% |
| National Capital Region | 1 | ₱93.8M | 64.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 67 | ₱6.3B | 63.4 | 0 | 98.4% |
| Roads | 31 | ₱2.3B | 65.4 | 0 | 91.8% |
| OTHER | 5 | ₱406.3M | 78.7 | 2 | 99.5% |
| Bridges | 5 | ₱224.8M | 59.9 | 0 | 73.8% |
| Buildings and Facilities | 3 | ₱18.1M | 55.8 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱142.9M | 93.7 | 0 | 92.0% |
| Bridges, Roads | 1 | ₱96.5M | 67.3 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱17.4M | 59.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25F00005ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY SAN JOSE, GUINOBATAN, AL | Region V | Region V | On-Going | ₱142.9M | 92% | High risk94 | —-0.009 |
| 17F00054NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS-CONSTRUCTION OF MISSING GAPS CONNECTING NATIONAL ROADS, INCLUDING ROW-BACON-MANITO ROAD INCLUDING BRIDGE AND SLOPE PROTECTION, ROAD: K0595+514.35-K0596+763.35 (BANASI);K0599+370-K0599+780 (OSIAO); | Region V | Region V | Completed | ₱144.2M | 100% | High risk81 | Flagged0.001 |
| 16F00109MFO1-NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT: CONSTRUCTION OF MISSING GAPS CONNECTING NATIONAL ROADS, INCLUDING ROW, BACON-MANITO ROAD, BRIDGE COMPONENT, BACON, SORSOGON 1ST LD | Region V | Region V | Completed | ₱107.2M | 100% | High risk80 | —-0.007 |
| 16F00101MFO1 - MAINTENANCE AND CONSTRUCTION SERVICE OF OTHER INFRASTRUCTURE, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS, TO DECLARED TOURISM DESTINATION, UPGRADING OF PIODURAN-DONSOL ROAD LEADING TO BU | Region V | Region V | Completed | ₱82.4M | 100% | High risk79 | —-0.021 |
| 18FO0036WIDENING OF PERMANENT BRIDGE, GUINOBATAN BRIDGE (B00292LZ) ALONG DAANG MAHARLIKA (LZ) | Region V | Albay 3rd DEO | On-Going | ₱44.1M | 100% | High risk77 | Flagged0.022 |
| 23F00046CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS-WATER SUPPLY SYSTEM-CONSTRUCTION OF WATER SYSTEM, LEVEL II, BRGY. BALIGANG, LIGAO CITY, ALBAY, BALIGANG, LIGAO CITY, ALBA | Region V | Region V | On-Going | ₱28.2M | 98% | High risk77 | —-0.001 |
| 18F00130CONSTRUCTION/IMPROVEMENT OF PADANG RIVER FLOOD CONTROL SYSTEM (COMPLETION OF GAPS), LEGAZPI CITY, ALBAY, ALBAY 2ND LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱149.7M | 100% | High risk74 | —-0.064 |
| 18F00004OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS,CONST./IMPV'T. OF PADANG RIVER FLOOD CONTROL SYSTEM,PADANG, LEGAZPI CITY, ALBAY 2ND LD | Region V | Region V | Completed | ₱163.2M | 100% | High risk74 | —-0.063 |
| 25F00007ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, NABONTON RIVER, LIGAO CITY, ALBAY | Region V | Region V | On-Going | ₱173.6M | 60% | High risk73 | —-0.016 |
| 25F00006ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, CABILOGAN RIVER, LIGAO CITY, ALBAY | Region V | Region V | On-Going | ₱142M | 75% | High risk73 | —-0.031 |
| 23FO0074SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF PAULBA - SAN PASCUAL - SAN MIGUEL - RAMAY ROAD WITH BRIDGE COMPONENT IN LIGAO CITY AND OAS, ALBAY | Region V | Albay 3rd DEO | On-Going | ₱140M | 84% | High risk73 | —-0.044 |
| 18F00060CLUSTER I:CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-LIGAO-PIODURAN-DONSOL ROAD LEADING TO BUTANDING SITE, ALBAY AND CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, | Region V | Region V | Completed | ₱161.2M | 100% | High risk73 | —-0.078 |
| 21F00005OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-CLUSTER I-I-CONSTRUCTION/IMPROVEMENT/REHABILITATION OF PADANG RIVER FLOOD MITIGATION STRUCTURE,(BRG | Region V | Region V | Completed | ₱289.5M | 100% | High risk73 | —-0.042 |
| 22F00024OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF NASISI RIVER FLOOD MITIGATION STRUCTURE(BRGY. CAVASI AND BRGY. TOMOL | Region V | Region V | On-Going | ₱192.9M | 96% | High risk73 | —-0.006 |
| 24F00101ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CAMARINES SUR-ALBAY DIVERSION ROAD, PACKAGE 4, ALBAY, LIBON, ALBAY (3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱151.1M | 83% | High risk73 | —-0.046 |
| 22F00009OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF KAPANTARAN RIVER FLOOD MITIGATION STRUCTURE (HOMAPON-IMALNOD SECTION), LEGAZPI CITY | Region V | Region V | On-Going | ₱139.9M | 95% | High risk73 | —-0.017 |
| 18F00006OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS:CONST.OF FLOOD MITIGATION STRUCTURES ALONG SAN AGUSTIN RIVER,LIBON AL | Region V | Region V | Completed | ₱171M | 100% | High risk72 | —-0.061 |
| 18F00014OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS:CONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL DIKES IN LIGAO CITY FOR CRITICAL SECTIONS OF BARANGAY | Region V | Region V | Completed | ₱139.7M | 100% | High risk72 | —-0.067 |
| 20FB0103FLOOD CONTROL STRUCTURES/FACILITIES: CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF BUDIAO FLOOD CONTROL STRUCTURE (DIKE) BUDIAO, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.4M | 100% | High risk72 | —-0.014 |
| 21F00002OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CLUSTER II-I-CONSTRUCTION/IMPROVEMENT/REHABILITATION OF CABILOGAN RIVER FLOOD MITIGATION STRUCTURE | Region V | Region V | Completed | ₱135M | 100% | High risk72 | —-0.068 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18FO0036WIDENING OF PERMANENT BRIDGE, GUINOBATAN BRIDGE (B00292LZ) ALONG DAANG MAHARLIKA (LZ) | Region V | Albay 3rd DEO | On-Going | ₱44.1M | 100% | High risk77 | Flagged0.022 |
| 17F00054NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS-CONSTRUCTION OF MISSING GAPS CONNECTING NATIONAL ROADS, INCLUDING ROW-BACON-MANITO ROAD INCLUDING BRIDGE AND SLOPE PROTECTION, ROAD: K0595+514.35-K0596+763.35 (BANASI);K0599+370-K0599+780 (OSIAO); | Region V | Region V | Completed | ₱144.2M | 100% | High risk81 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25F00005ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY SAN JOSE, GUINOBATAN, AL | Region V | Region V | On-Going | ₱142.9M | 92% | High risk94 | —-0.009 |
| 2 | 17F00054NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS-CONSTRUCTION OF MISSING GAPS CONNECTING NATIONAL ROADS, INCLUDING ROW-BACON-MANITO ROAD INCLUDING BRIDGE AND SLOPE PROTECTION, ROAD: K0595+514.35-K0596+763.35 (BANASI);K0599+370-K0599+780 (OSIAO); | Region V | Region V | Completed | ₱144.2M | 100% | High risk81 | Flagged0.001 |
| 3 | 16F00109MFO1-NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT: CONSTRUCTION OF MISSING GAPS CONNECTING NATIONAL ROADS, INCLUDING ROW, BACON-MANITO ROAD, BRIDGE COMPONENT, BACON, SORSOGON 1ST LD | Region V | Region V | Completed | ₱107.2M | 100% | High risk80 | —-0.007 |
| 4 | 16F00101MFO1 - MAINTENANCE AND CONSTRUCTION SERVICE OF OTHER INFRASTRUCTURE, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS, TO DECLARED TOURISM DESTINATION, UPGRADING OF PIODURAN-DONSOL ROAD LEADING TO BU | Region V | Region V | Completed | ₱82.4M | 100% | High risk79 | —-0.021 |
| 5 | 18FO0036WIDENING OF PERMANENT BRIDGE, GUINOBATAN BRIDGE (B00292LZ) ALONG DAANG MAHARLIKA (LZ) | Region V | Albay 3rd DEO | On-Going | ₱44.1M | 100% | High risk77 | Flagged0.022 |
| 6 | 23F00046CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS-WATER SUPPLY SYSTEM-CONSTRUCTION OF WATER SYSTEM, LEVEL II, BRGY. BALIGANG, LIGAO CITY, ALBAY, BALIGANG, LIGAO CITY, ALBA | Region V | Region V | On-Going | ₱28.2M | 98% | High risk77 | —-0.001 |
| 7 | 18F00130CONSTRUCTION/IMPROVEMENT OF PADANG RIVER FLOOD CONTROL SYSTEM (COMPLETION OF GAPS), LEGAZPI CITY, ALBAY, ALBAY 2ND LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱149.7M | 100% | High risk74 | —-0.064 |
| 8 | 18F00004OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS,CONST./IMPV'T. OF PADANG RIVER FLOOD CONTROL SYSTEM,PADANG, LEGAZPI CITY, ALBAY 2ND LD | Region V | Region V | Completed | ₱163.2M | 100% | High risk74 | —-0.063 |
| 9 | 25F00007ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, NABONTON RIVER, LIGAO CITY, ALBAY | Region V | Region V | On-Going | ₱173.6M | 60% | High risk73 | —-0.016 |
| 10 | 25F00006ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, CABILOGAN RIVER, LIGAO CITY, ALBAY | Region V | Region V | On-Going | ₱142M | 75% | High risk73 | —-0.031 |
| 11 | 23FO0074SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF PAULBA - SAN PASCUAL - SAN MIGUEL - RAMAY ROAD WITH BRIDGE COMPONENT IN LIGAO CITY AND OAS, ALBAY | Region V | Albay 3rd DEO | On-Going | ₱140M | 84% | High risk73 | —-0.044 |
| 12 | 18F00060CLUSTER I:CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-LIGAO-PIODURAN-DONSOL ROAD LEADING TO BUTANDING SITE, ALBAY AND CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, | Region V | Region V | Completed | ₱161.2M | 100% | High risk73 | —-0.078 |
| 13 | 21F00005OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-CLUSTER I-I-CONSTRUCTION/IMPROVEMENT/REHABILITATION OF PADANG RIVER FLOOD MITIGATION STRUCTURE,(BRG | Region V | Region V | Completed | ₱289.5M | 100% | High risk73 | —-0.042 |
| 14 | 22F00024OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF NASISI RIVER FLOOD MITIGATION STRUCTURE(BRGY. CAVASI AND BRGY. TOMOL | Region V | Region V | On-Going | ₱192.9M | 96% | High risk73 | —-0.006 |
| 15 | 24F00101ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CAMARINES SUR-ALBAY DIVERSION ROAD, PACKAGE 4, ALBAY, LIBON, ALBAY (3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱151.1M | 83% | High risk73 | —-0.046 |
| 16 | 22F00009OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF KAPANTARAN RIVER FLOOD MITIGATION STRUCTURE (HOMAPON-IMALNOD SECTION), LEGAZPI CITY | Region V | Region V | On-Going | ₱139.9M | 95% | High risk73 | —-0.017 |
| 17 | 18F00006OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS:CONST.OF FLOOD MITIGATION STRUCTURES ALONG SAN AGUSTIN RIVER,LIBON AL | Region V | Region V | Completed | ₱171M | 100% | High risk72 | —-0.061 |
| 18 | 18F00014OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS:CONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL DIKES IN LIGAO CITY FOR CRITICAL SECTIONS OF BARANGAY | Region V | Region V | Completed | ₱139.7M | 100% | High risk72 | —-0.067 |
| 19 | 20FB0103FLOOD CONTROL STRUCTURES/FACILITIES: CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF BUDIAO FLOOD CONTROL STRUCTURE (DIKE) BUDIAO, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.4M | 100% | High risk72 | —-0.014 |
| 20 | 21F00002OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CLUSTER II-I-CONSTRUCTION/IMPROVEMENT/REHABILITATION OF CABILOGAN RIVER FLOOD MITIGATION STRUCTURE | Region V | Region V | Completed | ₱135M | 100% | High risk72 | —-0.068 |
| 21 | 22F00031CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF AMTIC-BALIGANG-TAMBO-MULADBUC | Region V | Region V | Completed | ₱144.7M | 100% | High risk72 | —-0.077 |
| 22 | 21F00011OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF BONGA FLOOD CONTROL SYSTEM,LEGAZPI CITY, ALBAY,LEGAZPI CITY, ALBAY 2 | Region V | Region V | Completed | ₱115.8M | 100% | High risk71 | —-0.071 |
| 23 | 21FK0048FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION OF SPILLWAY FACILITIES ALONG MANLATO RIVER, DONSOL, SORSOGON | Region V | Sorsogon DEO | On-Going | ₱94M | 90% | High risk71 | —-0.016 |
| 24 | 23F00006OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF NABONTON RIVER FLOOD MITIGATION STRUCTURE(BRGY. TOMOL | Region V | Region V | Completed | ₱125.4M | 100% | High risk71 | —-0.070 |
| 25 | 23F00363ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CAMARINES SUR-ALBAY DIVERSION ROAD, PACKAGE 1, ALBAY, GUINOBATAN, ALBAY(3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱123.6M | 54% | High risk71 | —-0.036 |