Contractor dossier
236 projects on file, including joint ventures this contractor is part of.
Total projects
236
Total budget
₱8.5B
Average progress
97.5%
Completion rate
89.8%
Average risk score
48.1
Medium risk on average, out of 100
Flagged as unusual
12
5.1% of their projects
Risk mix
Exhibit A
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 120 | ₱3.7B | 46.8 | 0 | 98.8% |
| Flood Control and Drainage | 59 | ₱3.2B | 51.0 | 3 | 98.5% |
| Buildings and Facilities | 34 | ₱283.2M | 32.6 | 0 | 97.1% |
| Bridges | 7 | ₱339.6M | 48.8 | 0 | 100.0% |
| GAA 2025 SSP | 4 | ₱418.3M | 95.6 | 4 | 79.2% |
| GAA 2025 OO-1 | 4 | ₱286.6M | 94.0 | 2 | 58.8% |
| OTHER | 4 | ₱253M | 80.2 | 3 | 97.0% |
| Water Provision and Storage | 3 | ₱29.3M | 45.7 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱58.8M | 51.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25B00046CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R. A. 11239 - PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY - K0349+012 - K0350+700 , K0358+005 - K0358+581 | Region II | Region II | On-Going | ₱130.7M | 64% | High risk96 | Flagged0.033 |
| 25BG0110CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF RIVER CONTROL PROJECT, BRGY PALATTAO, NAGUILLIAN, ISABELA (PHASE 3) | Region II | Isabela 3rd DEO | On-Going | ₱95.8M | 100% | High risk96 | Flagged0.016 |
| 25BG0112CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF RIVER FLOOD CONTROL PROJECT, BRGY NAPACCU GRANDE, REINA MERCEDES, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱95.9M | 71% | High risk96 | Flagged0.025 |
| 25BG0113CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF RIVER FLOOD CONTROL PROJECT, BRGY BINARSANG, REINA MERCEDES, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱95.9M | 81% | High risk96 | Flagged0.023 |
| 25B00083OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SANTIAGO CIRCUMFERENTIAL ROAD, ISABELA | Region II | Region II | On-Going | ₱93.6M | 57% | High risk95 | Flagged0.013 |
| 25B00017OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS: CAUAYAN CITY BYPASS ROAD, ISABELA | Region II | Region II | On-Going | ₱73.6M | 88% | High risk95 | —-0.001 |
| 25BF0100OO1: NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - SANTIAGO-TUGUEGARAO ROAD - K0366 + 735.70 - K0367 + 578.70, K0367 + 799 - K0369 + 000, AURORA, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱93.6M | 1% | High risk94 | Flagged0.031 |
| 25BF0019OO1 - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADSSANTIAGO-TUGUEGARAO RD - K0366 + 470 K0367 + 364, AURORA, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱25.8M | 89% | High risk92 | —-0.006 |
| 25BG0172CONSTRUCTION OF SCHOOL BUILDING, LA PAZ ELEMENTARY SCHOOL, BARANGAY LA PAZ, CABATUAN. ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱9.7M | 88% | High risk86 | Flagged0.044 |
| 24B00002OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CAUAYAN CITY BYPASS ROAD, ISABELA | Region II | Region II | On-Going | ₱149.6M | 100% | High risk83 | Flagged0.024 |
| 25BG0111CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF RIVER FLOOD PROJECT, BRGY DANGAN, REINA MERCEDES, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱95.9M | 70% | High risk80 | —-0.000 |
| 24B00028OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0309 + (-496) - K0309 + (-423), K0309 + 000 - K0309 + 828 | Region II | Region II | On-Going | ₱50.4M | 100% | High risk77 | Flagged0.003 |
| 16BH0103WIDENING OF PERMANENT BRIDGE | Region II | Isabela 4th DEO | Completed | ₱43.4M | 100% | High risk75 | —-0.026 |
| 17BG0111FLOOD CONTROL/URGENT RIVER BANK PROTECTION WORKS, PHASE I, BARINGIN, CAUAYAN CITY, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱50.2M | 100% | High risk72 | —-0.041 |
| 17B00033MFO 1: NAT'L ROAD NETWORK SERVICES: NETWORK DEV'T: IMPV'T/WIDENING OF NAT'L ROADS TERTIARY ROADS, JCT. IPIL-QUIRINO BDRY. ROAD, K0337+(-152) TO K0337+540, K0350+000 TO K0352+620, ECHAGUE-JONES-SAN AGUSTIN, ISABELA | Region II | Region II | Completed | ₱128.7M | 100% | High risk70 | —-0.033 |
| 25BG0070ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CAUAYAN CITY-CABATUAN DIVERSION ROAD, CABATUAN SECTION, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱78.1M | 92% | High risk70 | —-0.022 |
| 17AB0030CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURESAND DRAINAGE SYSTEMS; CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LADING RIVER BRGY. CABITTAURAN, NUEVA ERA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱49M | 100% | High risk69 | —-0.037 |
| 17AB0004CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURESAND DRAINAGE SYSTEMS; CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DONGDONG RIVER, BRGY. CARAY, NUEVA ERA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱49M | 100% | High risk69 | —-0.038 |
| 16B00064PROPOSED CONSTRUCTION OF REGIONAL EVACUATION CENTER, SITIO MANALPAAC, SAN PABLO, CAUAYAN CITY | Region II | Region II | Completed | ₱34.6M | 100% | High risk69 | —-0.049 |
| 17AB0012CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG TIBANGRAN RIVER, BRGY. BARANGUBONG , NUEVA ERA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱49M | 100% | High risk68 | —-0.038 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BG0172CONSTRUCTION OF SCHOOL BUILDING, LA PAZ ELEMENTARY SCHOOL, BARANGAY LA PAZ, CABATUAN. ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱9.7M | 88% | High risk86 | Flagged0.044 |
| 25B00046CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R. A. 11239 - PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY - K0349+012 - K0350+700 , K0358+005 - K0358+581 | Region II | Region II | On-Going | ₱130.7M | 64% | High risk96 | Flagged0.033 |
| 25BF0100OO1: NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - SANTIAGO-TUGUEGARAO ROAD - K0366 + 735.70 - K0367 + 578.70, K0367 + 799 - K0369 + 000, AURORA, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱93.6M | 1% | High risk94 | Flagged0.031 |
| 25BG0112CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF RIVER FLOOD CONTROL PROJECT, BRGY NAPACCU GRANDE, REINA MERCEDES, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱95.9M | 71% | High risk96 | Flagged0.025 |
| 24B00002OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CAUAYAN CITY BYPASS ROAD, ISABELA | Region II | Region II | On-Going | ₱149.6M | 100% | High risk83 | Flagged0.024 |
| 25BG0113CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF RIVER FLOOD CONTROL PROJECT, BRGY BINARSANG, REINA MERCEDES, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱95.9M | 81% | High risk96 | Flagged0.023 |
| 25BG0110CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF RIVER CONTROL PROJECT, BRGY PALATTAO, NAGUILLIAN, ISABELA (PHASE 3) | Region II | Isabela 3rd DEO | On-Going | ₱95.8M | 100% | High risk96 | Flagged0.016 |
| 25B00083OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SANTIAGO CIRCUMFERENTIAL ROAD, ISABELA | Region II | Region II | On-Going | ₱93.6M | 57% | High risk95 | Flagged0.013 |
| 17BH0168REHABILITATION/IMPROVEMENT OF VARIOUS FLOOD CONTROL PROJECTS IN ISABELA - FLOOD CONTROL (STA. 0+000 - STA. 0+259.725 AND STA. 0+000 - STA. -0+432.645), MASAYA NORTE | Region II | Isabela 4th DEO | Completed | ₱41.8M | 100% | Medium risk57 | Flagged0.008 |
| 17BH0169REHABILITATION/IMPROVEMENT OF VARIOUS FLOOD CONTROL PROJECTS IN ISABELA - FLOOD CONTROL (STA. 0+000 - STA. 0+259.725 AND STA. 0+000 - STA. -0+432.645), NEMMATAN | Region II | Isabela 4th DEO | Completed | ₱42.3M | 100% | Medium risk57 | Flagged0.007 |
| 17BI0090REPAIR/RECONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE, SAN LEONARDO REVETMENT, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱4.6M | 100% | Low risk22 | Flagged0.004 |
| 24B00028OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0309 + (-496) - K0309 + (-423), K0309 + 000 - K0309 + 828 | Region II | Region II | On-Going | ₱50.4M | 100% | High risk77 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 17BG0028NETWORK DEVELOPMENT, IMPROVEMENT/WIDENING OF NATIONAL ROADS, CAUAYAN-CABATUAN ROAD., K0373+472-K0375+549, DADAP, LUNA, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱46.5M | 100% | High risk66 | —-0.052 |
| 27 | 17BG0026ASSET PRESERVATION OF NATIONAL ROADS-PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT MANAGEMENT-4 (HDM-4) - PRIMARY-CAUAYAN-CABATUAN ROAD (LZ) - K0370+(-090.20)-K0371+000, K0377+436, K0377+511, K0377+549, K0377+624, CAUAYAN | Region II | Isabela 3rd DEO | Completed | ₱10.5M | 100% | High risk66 | —-0.055 |
| 28 | 17BG0029CONCRETING OF M.H. DEL PILAR - VIGA BARANGAY ROAD, BARANGAY M.H. DEL PILAR, ALICIA, ISABELA 3RD LD, M.H. DEL PILAR, ALICIA, ISABELA, STATION 0+000 - 1+470.00 | Region II | Isabela 3rd DEO | Completed | ₱11.3M | 100% | High risk66 | —-0.055 |
| 29 | 25BG0061CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY CULING EAST, CABATUAN, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱9.9M | 100% | High risk66 | —-0.055 |
| 30 | 17BG0032CONCRETING OF SAN FERNANDO -DALAKIP BARANGAY ROAD, BARANGAY SAN FERNANDO, ALICIA, ISABELA 3RD LD, SAN FERNANDO, ALICIA, ISABELA, STA. 0+000 - 0+898.30 (SECT. 1), STA. 0+000 - 0+141.00 (SECT. 2), STA. 0+000 - 0+582.00 (SECT. 3) | Region II | Isabela 3rd DEO | Completed | ₱9.4M | 100% | High risk66 | —-0.056 |
| 31 | 25BG0063CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY LUZON (PUROK SILAHIS), CABATUAN, | Region II | Isabela 3rd DEO | Completed | ₱9.9M | 100% | High risk65 | —-0.054 |
| 32 | 17BF0005NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROAD-PRIMARY ROADS-ALONG N1, DAANG MAHARLIKA; K0382+000-K0382+977, NAGUILIAN, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱27.9M | 100% | High risk65 | —-0.049 |
| 33 | 17BF0002ASSET PRESERVATION OF NATIONAL ROADS:REHABILITATION/RECONSTRUCTION/UPGRADING OF NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM-HIGHWAY DEVELOPMENT MANAGEMENT-4 (HDM-4) TERTIARY ROAD ALONG GAMU-ROXAS ROAD (S007811LZ) K0391+231-K0391+ | Region II | Isabela 2nd DEO | Completed | ₱17.7M | 100% | High risk65 | —-0.052 |
| 34 | 17BF0001ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION/ UPGRADING OF NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT MANAGEMENT-4 (HDM-4)-PRIMARY ROAD ALONG SANTIAGO-TUGUEGARAO ROAD K0376+200-K0377+000 | Region II | Isabela 2nd DEO | Completed | ₱25.3M | 100% | High risk64 | —-0.051 |
| 35 | 16BF0124ASSET PRESERVATION OF NATIONAL ROADS REHABILITATION/RECONSTRUCTION/UPGRADING OF NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT SYSTEM/HIGHWAY DEVELOPMENT MANAGEMENT-4(HDM-4) - PRIMARY ROAD ALONG SANTIAGO-TUGUEGARAO ROADS (S00760ILZ), K0377+00,NUEVA E | Region II | Isabela 2nd DEO | Completed | ₱27.5M | 100% | High risk64 | —-0.051 |
| 36 | 16BF0126ASSET PRESERVATION OF NATIONAL ROADS:REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED OF NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT MANAGEMENT-4(HDM-4) PRIMARY ALONG DAANGMAHARLIKA(LZ) K0389+286-K0389 | Region II | Isabela 2nd DEO | Completed | ₱14M | 100% | High risk64 | —-0.052 |
| 37 | 25BF0070OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL STRUCTURE (VILLA BULUSAN SECTSECTION), PHASE III, QUIRINO, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱93.6M | 53% | High risk63 | —-0.016 |
| 38 | 22B00042CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM(BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BANNAWAG-SAN RAFAEL BRIDGE, AURORA, ISABELA | Region II | Region II | Completed | ₱120.6M | 100% | High risk62 | —-0.024 |
| 39 | 24BF0050ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTR | Region II | Isabela 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.050 |
| 40 | 24BG0101CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION (COMPLETION) OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. DISTRICT I, REINA | Region II | Isabela 3rd DEO | On-Going | ₱99M | 100% | High risk62 | —-0.027 |
| 41 | 23BG0107CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM - FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BGY. DISTRICT 1 (PACKAGE 1), REINA MERCEDES, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱99M | 100% | High risk62 | —-0.051 |
| 42 | 23BG0110CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM - FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BGY. DISTRICT 1 (PACKAGE 2), REINA MERCEDES, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱99M | 100% | High risk62 | —-0.051 |
| 43 | 24BG0110CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL PROJECT, BRGY. BANQUERO, REINA MERCEDES, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱99M | 100% | High risk62 | —-0.052 |
| 44 | 24BG0064CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION (CONTINUATION) OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. DISTRICT I, REINA MERCEDES, | Region II | Isabela 3rd DEO | Completed | ₱99M | 100% | High risk62 | —-0.053 |
| 45 | 19B00037OO 1: ENSURE SAFE AND RELIABLE NAT'L ROAD SYSTEM: BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES: PUZZER BRIDGE (B01189LZ) ALONG DAANG MAHARLIKA (LZ), REINA MERCEDES, ISABELA, K0375+073 | Region II | Region II | Completed | ₱104.1M | 100% | High risk62 | —-0.013 |
| 46 | 22BF0075ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT (HOLY FRIDAY SECTION), MALLIG, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱96.4M | 100% | High risk62 | —-0.055 |
| 47 | 22BF0077ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT (LUNA SECTION), QUIRINO, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.053 |
| 48 | 25BH0039ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PANANG FLOOD CONTROL STRUCTURE, SECTION 2, SAN AGUSTI | Region II | Isabela 4th DEO | On-Going | ₱106.1M | 89% | High risk61 | —-0.027 |
| 49 | 23BH0175SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES - CONSTRUCTION OF BARANGAY PALAGAO FLOOD CONTROL STRUCTURE,SECTION 1,JONES , ISABELA | Region II | Isabela 4th DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.056 |
| 50 | 23BH0181SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES-CONSTRUCTION OF BARANGAY PALAGAO FLOOD CONTROL STRUCTURE, SECTION 2, JONES, ISABELA | Region II | Isabela 4th DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.057 |