Contractor dossier
236 projects on file, including joint ventures this contractor is part of.
Total projects
236
Total budget
₱8.5B
Average progress
97.5%
Completion rate
89.8%
Average risk score
48.1
Medium risk on average, out of 100
Flagged as unusual
12
5.1% of their projects
Risk mix
Exhibit A
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 120 | ₱3.7B | 46.8 | 0 | 98.8% |
| Flood Control and Drainage | 59 | ₱3.2B | 51.0 | 3 | 98.5% |
| Buildings and Facilities | 34 | ₱283.2M | 32.6 | 0 | 97.1% |
| Bridges | 7 | ₱339.6M | 48.8 | 0 | 100.0% |
| GAA 2025 SSP | 4 | ₱418.3M | 95.6 | 4 | 79.2% |
| GAA 2025 OO-1 | 4 | ₱286.6M | 94.0 | 2 | 58.8% |
| OTHER | 4 | ₱253M | 80.2 | 3 | 97.0% |
| Water Provision and Storage | 3 | ₱29.3M | 45.7 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱58.8M | 51.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25B00046CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R. A. 11239 - PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY - K0349+012 - K0350+700 , K0358+005 - K0358+581 | Region II | Region II | On-Going | ₱130.7M | 64% | High risk96 | Flagged0.033 |
| 25BG0110CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF RIVER CONTROL PROJECT, BRGY PALATTAO, NAGUILLIAN, ISABELA (PHASE 3) | Region II | Isabela 3rd DEO | On-Going | ₱95.8M | 100% | High risk96 | Flagged0.016 |
| 25BG0112CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF RIVER FLOOD CONTROL PROJECT, BRGY NAPACCU GRANDE, REINA MERCEDES, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱95.9M | 71% | High risk96 | Flagged0.025 |
| 25BG0113CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF RIVER FLOOD CONTROL PROJECT, BRGY BINARSANG, REINA MERCEDES, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱95.9M | 81% | High risk96 | Flagged0.023 |
| 25B00083OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SANTIAGO CIRCUMFERENTIAL ROAD, ISABELA | Region II | Region II | On-Going | ₱93.6M | 57% | High risk95 | Flagged0.013 |
| 25B00017OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS: CAUAYAN CITY BYPASS ROAD, ISABELA | Region II | Region II | On-Going | ₱73.6M | 88% | High risk95 | —-0.001 |
| 25BF0100OO1: NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - SANTIAGO-TUGUEGARAO ROAD - K0366 + 735.70 - K0367 + 578.70, K0367 + 799 - K0369 + 000, AURORA, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱93.6M | 1% | High risk94 | Flagged0.031 |
| 25BF0019OO1 - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADSSANTIAGO-TUGUEGARAO RD - K0366 + 470 K0367 + 364, AURORA, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱25.8M | 89% | High risk92 | —-0.006 |
| 25BG0172CONSTRUCTION OF SCHOOL BUILDING, LA PAZ ELEMENTARY SCHOOL, BARANGAY LA PAZ, CABATUAN. ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱9.7M | 88% | High risk86 | Flagged0.044 |
| 24B00002OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CAUAYAN CITY BYPASS ROAD, ISABELA | Region II | Region II | On-Going | ₱149.6M | 100% | High risk83 | Flagged0.024 |
| 25BG0111CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF RIVER FLOOD PROJECT, BRGY DANGAN, REINA MERCEDES, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱95.9M | 70% | High risk80 | —-0.000 |
| 24B00028OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0309 + (-496) - K0309 + (-423), K0309 + 000 - K0309 + 828 | Region II | Region II | On-Going | ₱50.4M | 100% | High risk77 | Flagged0.003 |
| 16BH0103WIDENING OF PERMANENT BRIDGE | Region II | Isabela 4th DEO | Completed | ₱43.4M | 100% | High risk75 | —-0.026 |
| 17BG0111FLOOD CONTROL/URGENT RIVER BANK PROTECTION WORKS, PHASE I, BARINGIN, CAUAYAN CITY, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱50.2M | 100% | High risk72 | —-0.041 |
| 17B00033MFO 1: NAT'L ROAD NETWORK SERVICES: NETWORK DEV'T: IMPV'T/WIDENING OF NAT'L ROADS TERTIARY ROADS, JCT. IPIL-QUIRINO BDRY. ROAD, K0337+(-152) TO K0337+540, K0350+000 TO K0352+620, ECHAGUE-JONES-SAN AGUSTIN, ISABELA | Region II | Region II | Completed | ₱128.7M | 100% | High risk70 | —-0.033 |
| 25BG0070ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CAUAYAN CITY-CABATUAN DIVERSION ROAD, CABATUAN SECTION, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱78.1M | 92% | High risk70 | —-0.022 |
| 17AB0030CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURESAND DRAINAGE SYSTEMS; CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LADING RIVER BRGY. CABITTAURAN, NUEVA ERA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱49M | 100% | High risk69 | —-0.037 |
| 17AB0004CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURESAND DRAINAGE SYSTEMS; CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DONGDONG RIVER, BRGY. CARAY, NUEVA ERA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱49M | 100% | High risk69 | —-0.038 |
| 16B00064PROPOSED CONSTRUCTION OF REGIONAL EVACUATION CENTER, SITIO MANALPAAC, SAN PABLO, CAUAYAN CITY | Region II | Region II | Completed | ₱34.6M | 100% | High risk69 | —-0.049 |
| 17AB0012CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG TIBANGRAN RIVER, BRGY. BARANGUBONG , NUEVA ERA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱49M | 100% | High risk68 | —-0.038 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BG0172CONSTRUCTION OF SCHOOL BUILDING, LA PAZ ELEMENTARY SCHOOL, BARANGAY LA PAZ, CABATUAN. ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱9.7M | 88% | High risk86 | Flagged0.044 |
| 25B00046CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R. A. 11239 - PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY - K0349+012 - K0350+700 , K0358+005 - K0358+581 | Region II | Region II | On-Going | ₱130.7M | 64% | High risk96 | Flagged0.033 |
| 25BF0100OO1: NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - SANTIAGO-TUGUEGARAO ROAD - K0366 + 735.70 - K0367 + 578.70, K0367 + 799 - K0369 + 000, AURORA, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱93.6M | 1% | High risk94 | Flagged0.031 |
| 25BG0112CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF RIVER FLOOD CONTROL PROJECT, BRGY NAPACCU GRANDE, REINA MERCEDES, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱95.9M | 71% | High risk96 | Flagged0.025 |
| 24B00002OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CAUAYAN CITY BYPASS ROAD, ISABELA | Region II | Region II | On-Going | ₱149.6M | 100% | High risk83 | Flagged0.024 |
| 25BG0113CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF RIVER FLOOD CONTROL PROJECT, BRGY BINARSANG, REINA MERCEDES, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱95.9M | 81% | High risk96 | Flagged0.023 |
| 25BG0110CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF RIVER CONTROL PROJECT, BRGY PALATTAO, NAGUILLIAN, ISABELA (PHASE 3) | Region II | Isabela 3rd DEO | On-Going | ₱95.8M | 100% | High risk96 | Flagged0.016 |
| 25B00083OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SANTIAGO CIRCUMFERENTIAL ROAD, ISABELA | Region II | Region II | On-Going | ₱93.6M | 57% | High risk95 | Flagged0.013 |
| 17BH0168REHABILITATION/IMPROVEMENT OF VARIOUS FLOOD CONTROL PROJECTS IN ISABELA - FLOOD CONTROL (STA. 0+000 - STA. 0+259.725 AND STA. 0+000 - STA. -0+432.645), MASAYA NORTE | Region II | Isabela 4th DEO | Completed | ₱41.8M | 100% | Medium risk57 | Flagged0.008 |
| 17BH0169REHABILITATION/IMPROVEMENT OF VARIOUS FLOOD CONTROL PROJECTS IN ISABELA - FLOOD CONTROL (STA. 0+000 - STA. 0+259.725 AND STA. 0+000 - STA. -0+432.645), NEMMATAN | Region II | Isabela 4th DEO | Completed | ₱42.3M | 100% | Medium risk57 | Flagged0.007 |
| 17BI0090REPAIR/RECONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE, SAN LEONARDO REVETMENT, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱4.6M | 100% | Low risk22 | Flagged0.004 |
| 24B00028OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0309 + (-496) - K0309 + (-423), K0309 + 000 - K0309 + 828 | Region II | Region II | On-Going | ₱50.4M | 100% | High risk77 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 18BG0011CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT (PHASE I), TAGARAN, CAUAYAN CITY, ISABELA STA. 0+000 - STA. 0+226.00 | Region II | Isabela 3rd DEO | Completed | ₱27.9M | 100% | Medium risk44 | —-0.068 |
| 127 | 18BG0012CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT (PHASE I) ALICAOCAO, CAUAYAN CITY, ISABELA, STA. 0+000 - STA. 0+226 | Region II | Isabela 3rd DEO | Completed | ₱27.9M | 100% | Medium risk44 | —-0.068 |
| 128 | 19BG0038002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT (PHASE II), ALICAOCAO, CAUAYAN CITY, IS | Region II | Isabela 3rd DEO | Completed | ₱18.9M | 100% | Medium risk44 | —-0.069 |
| 129 | 22BG0021CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. LABINAB PEQUEÑO, | Region II | Isabela 3rd DEO | Completed | ₱43.5M | 100% | Medium risk44 | —-0.064 |
| 130 | 21BG0024OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. LABINAB PEQUEÑO, REINA MERCEDES, | Region II | Isabela 3rd DEO | Completed | ₱45.8M | 100% | Medium risk44 | —-0.066 |
| 131 | 19BG0040OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, GUAYABAL, CAUAYAN CITY, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱43.4M | 100% | Medium risk44 | —-0.067 |
| 132 | 18BH0029REHAB./RECONSTRUCTOIN OF JCT. NAT'L. POTIA ROAD WITH SLIP, SLOPE COLLAPSE AND LANDSLIDE K0342+018 - K0342+250, K0343+780 - K0334+257 | Region II | Isabela 4th DEO | Completed | ₱45.8M | 100% | Medium risk44 | —-0.082 |
| 133 | 19BH0021CONSTRUCTION/ IMPROVEMENT OF ACCESS ROAD LEADING TO DARIUK HILLS | Region II | Isabela 4th DEO | Completed | ₱39.2M | 100% | Medium risk44 | —-0.084 |
| 134 | 19BG0005NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - CAUAYAN - CABATUAN RD. K0378+706 - K0380+267, CABATUAN, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱27.8M | 100% | Medium risk44 | —-0.082 |
| 135 | 21BH0124CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CAUAYAN CITY - CABATUAN DIVERSION ROAD | Region II | Isabela 4th DEO | Completed | ₱24.5M | 100% | Medium risk44 | —-0.085 |
| 136 | 24BG0049CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF MAGAT RIVER IRRIGATION, A2A12 SERVICE ROAD, BRGY. LUZON, | Region II | Isabela 3rd DEO | Completed | ₱26M | 100% | Medium risk44 | —-0.086 |
| 137 | 18BG0054CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT (PHASE I), DABBURAB, CAUAYAN CITY, ISABELA, STA. 0+000 - STA. 0+171.60 | Region II | Isabela 3rd DEO | Completed | ₱27.9M | 100% | Medium risk44 | —-0.068 |
| 138 | 18BG0023CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT (PHASE I), GUAYABAL-BARINGIN NORTE, CAUAYAN CITY, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱27.9M | 100% | Medium risk44 | —-0.068 |
| 139 | 18BG0034CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT (PHASE I), GUAYABAL, CAUAYAN CITY, ISABELA, STA. 0+530 - STA. 0+641.60 | Region II | Isabela 3rd DEO | Completed | ₱27.9M | 100% | Medium risk44 | —-0.068 |
| 140 | 18BG0022CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT (PHASE I) BARINGIN, CAUAYAN CITY, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱27.9M | 100% | Medium risk44 | —-0.068 |
| 141 | 19BG0078FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT (PHASE II), STA. LUCIANA, CAUAYAN CITY, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱18.6M | 100% | Medium risk44 | —-0.069 |
| 142 | 22BF0001SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL STRUCTURE (S | Region II | Isabela 2nd DEO | Completed | ₱41.7M | 100% | Medium risk44 | —-0.067 |
| 143 | 22B00031OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BYPASS AND DIVERSION ROADS -CAUAYAN CITY ALTERNATE ROUTE, PACKAGE 1, ISABELA | Region II | Region II | Completed | ₱21.6M | 100% | Medium risk44 | —-0.083 |
| 144 | 18BG0046NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - SANTIAGO-TUGUEGARAO BY-PASS RD, CABATUAN, ISABELA, K0363+(-703) + K0363+027 | Region II | Isabela 3rd DEO | Completed | ₱22.4M | 100% | Medium risk44 | —-0.083 |
| 145 | 23B00027OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS -CAUAYAN CITY BYPASS ROAD, ISABELA | Region II | Region II | Completed | ₱19.2M | 100% | Medium risk44 | —-0.084 |
| 146 | 23BH0008OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY - PASS AND DIVERSION ROADS - CAUAYAN CITY - CABATUAN DIVERSION ROAD, PACKAGE 1, ISABELA | Region II | Isabela 4th DEO | Completed | ₱19.5M | 100% | Medium risk44 | —-0.085 |
| 147 | 22BH0019NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CAUAYAN CITY - CABATUAN DIVERSION ROAD, CAUAYAN CITY, ISABELA | Region II | Isabela 4th DEO | Completed | ₱19.2M | 100% | Medium risk44 | —-0.086 |
| 148 | 19BH0011NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROAD - WIDENING ALONG SANTIAGO - TUGUEGARAO RD., K0328+(-444) - K0328+010, K0336+894-K0337+606 | Region II | Isabela 4th DEO | Completed | ₱38.2M | 100% | Medium risk44 | —-0.081 |
| 149 | 24BH0053OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - CORDON - DIFFUN RD. - K0318 + 309 - K0320 + 000 | Region II | Isabela 4th DEO | Completed | ₱39M | 100% | Medium risk44 | —-0.084 |
| 150 | 18BH0012CONSTRUCTION OF NEMMATAN FLOOD CONTROL (STA. 0+000 - STA. 0+476) | Region II | Isabela 4th DEO | Completed | ₱44M | 100% | Medium risk44 | —-0.067 |