Contractor dossier
147 projects on file, including joint ventures this contractor is part of.
Total projects
147
Total budget
₱5.2B
Average progress
89.3%
Completion rate
68.0%
Below 70%
Average risk score
48.1
Medium risk on average, out of 100
Flagged as unusual
4
2.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 132 | ₱5.1B | 50.5 | 4 | 88.5% |
| National Capital Region | 11 | ₱14.8M | 21.3 | 0 | 100.0% |
| Region III | 4 | ₱98M | 41.7 | 0 | 87.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 49 | ₱1.5B | 42.7 | 2 | 79.5% |
| Buildings and Facilities | 48 | ₱807.3M | 44.0 | 0 | 92.9% |
| Flood Control and Drainage | 35 | ₱2.3B | 54.3 | 0 | 97.8% |
| OTHER | 4 | ₱158.4M | 72.8 | 1 | 100.0% |
| Water Provision and Storage | 4 | ₱33.6M | 48.1 | 0 | 99.8% |
| Bridges | 3 | ₱75.1M | 47.8 | 0 | 82.3% |
| GAA 2025 SSP | 2 | ₱53.5M | 93.6 | 1 | 52.5% |
| GAA 2025 OO-2 | 1 | ₱47.8M | 86.3 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱168.5M | 67.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DI0084CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAN ROQUE, SAN PEDRO CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱46.2M | 6% | High risk95 | Flagged0.022 |
| 25DI0144CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY FATIMA, SAN PEDRO CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱7.3M | 99% | High risk93 | —-0.010 |
| 25DI0021CONSTRUCTION OF RIVER PROTECTION STRUCTURE NEAR F.T. SAN LUIS ROAD, BRGY. TRANCA, BAY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱47.8M | 100% | High risk86 | —-0.062 |
| 20DI0178CAPITAL OUTLAY - CONTINGENT FUND - FUND SUBSIDIES FOR CONTINGENCIES - REPAIR / REHABILITATION OF PRIMARY ROAD W/ DRAINAGE INSIDE FORT STO. DOMINGO, STA. ROSA, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱57.9M | 100% | High risk83 | Flagged0.012 |
| 25CC0264CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PANDUCOT, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱14.5M | 50% | High risk74 | —-0.024 |
| 17DP0006NETWORK DEVELOPMENT - IMPROVEMENT / WIDENING OF NATIONAL ROADS ALONG SAN PABLO-RIZAL - NAGCARLAN - LILIW RD. (S05817LZ) K0095 + 465 - K0096 + 912 | Region IV-A | Laguna 3rd DEO | Completed | ₱48.3M | 100% | High risk72 | —-0.042 |
| 22DI0141CONSTRUCTION OF ROAD WITH DRAINAGE, BARANGAYS BAMBANG AND LALAKAY, LOS BANOS, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱29.7M | 100% | High risk68 | —-0.043 |
| 24DC0178REHABILITATION/RECONSTRUCTION OF SLOPE PROTECTION ALONG LAKE TAAL-TAGAYTAY ROAD K0067+507 - K0067+592 | Region IV-A | Batangas 3rd DEO | Completed | ₱22.4M | 100% | High risk67 | —-0.042 |
| 18D00039FY 2018 DPWH INFRASTRUCTURE PROGRAM, ORGANIZATIONAL OUTCOME 1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS & DIVERSION ROADS, BIÑAN-CARMONA BYPASS ROAD, INCL.. BRIDGE & ROW, LAGUNA | Region IV-A | Region IV-A | Completed | ₱168.5M | 100% | High risk67 | —-0.049 |
| 25D00095CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CARMONA-BIÑAN DIVERSION ROAD, BIÑAN SECTION, LAGUNA | Region IV-A | Region IV-A | On-Going | ₱141.1M | 20% | High risk66 | —-0.030 |
| 25DI0043REHABILITATION OF BANK STRUCTURE ALONG SANTA ROSA RIVER, PHASE 1, BINAN CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱95.5M | 97% | High risk65 | —-0.045 |
| 23DI0061CONSTRUCTION OF STRUCTURE FOR RIVERBANK PROTECTION ALONG STA. ROSA RIVER, (NEAR NUVALI ROAD), STA. ROSA CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱93.8M | 100% | High risk65 | —-0.075 |
| 23DI0065CONSTRUCTION OF STRUCTURE FOR RIVERBANK PROTECTION ALONG STA. ROSA RIVER, (NEAR SAF), BRGY. STO. DOMINGO, STA. ROSA CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱93.9M | 100% | High risk65 | —-0.075 |
| 23D00080CONSTRUCTION OF SLOPE PROTECTION AT BARANGAY LARAM, SAN PEDRO, LAGUNA | Region IV-A | Region IV-A | On-Going | ₱108.1M | 100% | High risk65 | —-0.030 |
| 23D00098CONSTRUCTION OF SLOPE PROTECTION AT BARANGAY LANGGAM, SAN PEDRO, LAGUNA | Region IV-A | Region IV-A | On-Going | ₱103M | 99% | High risk64 | —-0.029 |
| 20D00054PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF RIVER CONTROL ALONG SAN PEDRO RIVER (PHASE II), SAN PEDRO CITY, LAGUNA | Region IV-A | Region IV-A | Completed | ₱106.1M | 100% | High risk64 | —-0.071 |
| 23DC0095CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG SAN JUAN RIVER-PHASE 5, TANAUAN-STO. TOMAS, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱99M | 100% | High risk64 | —-0.077 |
| 24DI0185CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG STA. ROSA RIVER (NEAR CALAX BRIDGE), STO. DOMINGO SIDE, SANTA ROSA, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.079 |
| 23DI0109CONSTRUCTION OF STRUCTURE FOR RIVERBANK PROTECTION ALONG MAULAWIN WATERWAYS, BRGY. SAN ANTONIO, LOS BANOS, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱99M | 100% | High risk64 | —-0.075 |
| 24DI0112CONSTRUCTION OF WATERWAYS PROTECTION STRUCTURE, BARANGAYS BAMBANG AND LALAKAY, LOS BANOS, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱96.4M | 96% | High risk64 | —-0.036 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DI0084CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAN ROQUE, SAN PEDRO CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱46.2M | 6% | High risk95 | Flagged0.022 |
| 25DC0198CONCRETING OF BRGY. J. LEVISTE FMR, BRGY. J. LEVISTE, LAUREL, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱14.5M | 0% | Medium risk48 | Flagged0.013 |
| 20DI0178CAPITAL OUTLAY - CONTINGENT FUND - FUND SUBSIDIES FOR CONTINGENCIES - REPAIR / REHABILITATION OF PRIMARY ROAD W/ DRAINAGE INSIDE FORT STO. DOMINGO, STA. ROSA, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱57.9M | 100% | High risk83 | Flagged0.012 |
| 25DH0064CONCRETING OF BRGY. SISILMIN TO BRGY. TIBATIB FMR, BRGY. SISILMIN TO BRGY. TIBATIB, CAVINTI, LAGUNA | Region IV-A | Laguna 1st DEO | On-Going | ₱14.5M | 8% | Medium risk48 | Flagged0.011 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 25DC0198CONCRETING OF BRGY. J. LEVISTE FMR, BRGY. J. LEVISTE, LAUREL, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱14.5M | 0% | Medium risk48 | Flagged0.013 |
| 77 | 24DC0157CONCRETING OF BRGY. JANOPOL ORIENTAL FMR, BRGY. JANOPOL ORIENTAL, TANAUAN CITY, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱15.4M | 100% | Medium risk48 | —-0.056 |
| 78 | 24D00093CONSTRUCTION OF CARMONA-BIÑAN EXTENSION ROAD, BIÑAN SECTION, LAGUNA | Region IV-A | Region IV-A | On-Going | ₱42.3M | 54% | Medium risk48 | —-0.020 |
| 79 | 25DC0097CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP-PUBLIC WATER SUPPLY SYSTEM, REHABILITATION/IMPROVEMENT OF WATER SYSTEM (BARANGAY SAN PABLO WATER COOPERATIVE SYSTEM), BARANGAY SAN PABLO, STO. TOMAS CITY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 99% | Medium risk48 | —-0.045 |
| 80 | 25DH0064CONCRETING OF BRGY. SISILMIN TO BRGY. TIBATIB FMR, BRGY. SISILMIN TO BRGY. TIBATIB, CAVINTI, LAGUNA | Region IV-A | Laguna 1st DEO | On-Going | ₱14.5M | 8% | Medium risk48 | Flagged0.011 |
| 81 | 23DI0208CONSTRUCTION OF SOLAR WATER SYSTEM, SITIO RUSTANS, BRGY. LANGGAM, SAN PEDRO CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱9.6M | 100% | Medium risk48 | —-0.040 |
| 82 | 23DI0220CONSTRUCTION OF SOLAR WATER SYSTEM, BAYAN-BAYANAN, BRGY. SAN VICENTE, SAN PEDRO CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱9.6M | 100% | Medium risk48 | —-0.040 |
| 83 | 23DI0219CONSTRUCTION OF SOLAR WATER SYSTEM, BRGY. PACITA 1, SAN PEDRO CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱9.6M | 100% | Medium risk48 | —-0.072 |
| 84 | 23DI0163WIDENING OF BRIDGE AT BARANGAY ESTRELLA, SAN PEDRO CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱23.4M | 95% | Medium risk48 | —-0.024 |
| 85 | 24DI0039CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM, BARANGAY LANGKIWA, BINAN CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱38.6M | 98% | Medium risk48 | —-0.065 |
| 86 | 20DI0030OFF- CARRIAGEWAY IMPROVEMENT- PRIMARY ROADS -MANILA SOUTH RD. -K0036+300 -K0036+600, K0036+845 - K0037+550, K0037+800 - K0038+437 | Region IV-A | Laguna 2nd DEO | Completed | ₱38.3M | 100% | Medium risk48 | —-0.106 |
| 87 | 23DI0027PREVENTIVE MAINTENANCE - PRIMARY ROADS - MANILA SOUTH RD - K0040 + 000 - K0040 + 519 | Region IV-A | Laguna 2nd DEO | Completed | ₱34.2M | 100% | Medium risk48 | —-0.106 |
| 88 | 25DI0099CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - CALAMBA-STA CRUZ-FAMY JCT RD - K0058 + 774 - K0059 +359 | Region IV-A | Laguna 2nd DEO | On-Going | ₱29.1M | 0% | Medium risk47 | —-0.045 |
| 89 | 24DC0181REHABILITATION OF VIGA BR. I AND II ALONG MAHARLIKA HIGHWAY LZ | Region IV-A | Batangas 3rd DEO | On-Going | ₱9.4M | 97% | Medium risk47 | —-0.036 |
| 90 | 20DH0076CONCRETING/CONSTRUCTION OF LOCAL ROAD, BRGY. BAGUMBAYAN, STA. CRUZ, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱31.3M | 100% | Medium risk47 | —-0.108 |
| 91 | 25DC0087CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF BUGAAN-GULOD-BUSO-BUS | Region IV-A | Batangas 3rd DEO | On-Going | ₱29.4M | 1% | Medium risk47 | —-0.044 |
| 92 | 25DC0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION/ APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG TALISAY-LAUREL-AGONCILLO RD | Region IV-A | Batangas 3rd DEO | On-Going | ₱32.8M | 90% | Medium risk47 | —-0.073 |
| 93 | 23DP0043ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - REHABILITATION OF NATIONAL ROADS ALONG DAANG MAHARLIKA (S01681LZ) K0074+017 - K0075+030 | Region IV-A | Laguna 3rd DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.103 |
| 94 | 22DP0028CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SIGNAGE AND SOLAR STUDS ALONG NATIONAL ROAD, LAGUNA 3RD DISTRICT ENGINEERING | Region IV-A | Laguna 3rd DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.105 |
| 95 | 23DH0012ROAD WIDENING-SECONDARY ROADS, RIZAL BDRY.-FAMY-QUEZON RD., K0080 + 831 - K0081 + 306 | Region IV-A | Laguna 1st DEO | Completed | ₱34.7M | 100% | Medium risk47 | —-0.106 |
| 96 | 22DI0077CONSTRUCTION OF RIVER PROTECTION STRUCTURE ALONG SAN ISIDRO RIVER, SITIO BAYAN BAYANAN, BRGY. SAN VICENTE, SAN PEDRO CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱43.1M | 100% | Medium risk47 | —-0.029 |
| 97 | 18DI0060FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD CONTROL ALONG SAN ISIDRO RIVER, BRGY. MAGSAYSAY, SAN PEDRO CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.085 |
| 98 | 24DI0049CONSTRUCTION OF SLOPE PROTECTION AT BARANGAY GANADO, BINAN CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱29.3M | 100% | Medium risk47 | —-0.088 |
| 99 | 23DI0106CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY MALABAN, BINAN CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱19.3M | 100% | Medium risk47 | —-0.089 |
| 100 | 25DC0093CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SEAWALL, BRGY. POBLACION 8, TALISAY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱23.9M | 56% | Medium risk47 | —-0.039 |