Contractor dossier
199 projects on file, including joint ventures this contractor is part of.
Total projects
199
Total budget
₱2.8B
Average progress
96.0%
Completion rate
83.4%
Average risk score
33.8
Medium risk on average, out of 100
Flagged as unusual
19
9.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 177 | ₱2.4B | 33.1 | 15 | 97.0% |
| Region XIII | 16 | ₱388.2M | 38.5 | 3 | 88.5% |
| Region X | 3 | ₱14.3M | 45.1 | 0 | 99.3% |
| Region XII | 3 | ₱54.2M | 39.1 | 1 | 77.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 114 | ₱1.1B | 24.0 | 3 | 97.7% |
| Roads | 57 | ₱1.1B | 42.1 | 3 | 98.0% |
| OTHER | 11 | ₱396.1M | 68.3 | 10 | 81.9% |
| Water Provision and Storage | 8 | ₱51.5M | 38.4 | 1 | 95.0% |
| Flood Control and Drainage | 5 | ₱83.9M | 41.1 | 0 | 92.0% |
| GAA 2025 SSP | 2 | ₱52.7M | 94.4 | 1 | 64.5% |
| GAA 2025 OO-1 | 1 | ₱93.6M | 87.3 | 1 | 30.7% |
| Bridges | 1 | ₱6.9M | 46.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25ME0073CONSTRUCTION OF ROAD ALONG JCT. NHW ILAYA, DATALBUKAY - LANAO KAFANGLAO ROAD, GLAN, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱46.8M | 31% | High risk95 | Flagged0.041 |
| 25KA0069CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BUSDI, MALAYBALAY CITY, BUKIDNONBRGY. BUSDI, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱5.9M | 98% | High risk94 | —-0.001 |
| 24LI0127CONSTRUCTION OF 2 UNITS OF 2-STOREY 10-CLASSROOM SCHOOL BUILDING IN MONKAYO CES, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱75.3M | 90% | High risk89 | Flagged0.067 |
| 25L00159CONSTRUCTION OF 2-STOREY NCMF DAVAO REGIONAL OFFICE BUILDING, RGC, BAGO OSHIRO, DAVAO CITY | Region XI | Region XI | On-Going | ₱71.3M | 2% | High risk88 | Flagged0.090 |
| 24LA0147CONSTRUCTION/COMPLETION OF KNP BUILDING, KINGKING, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱49.4M | 53% | High risk88 | Flagged0.073 |
| 25NI0064ROAD WIDENING - SECONDARY ROADS - SURIGAO - DAVAO COASTAL ROAD - K1444+334 - K1445+427, K1447+697 - K1448+700 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱93.6M | 31% | High risk87 | Flagged0.032 |
| 24LB0117CONSTRUCTION OF 3-STOREY 9-CLASSROOM SCHOOL BUILDING AT BUHISAN NATIONAL HIGH SCHOOL, BRGY. TIBUNGCO, DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱39M | 99% | High risk86 | Flagged0.057 |
| 24LA0138CONSTRUCTION OF CONCRETE ROAD, PUROK 6 SITIO NAGAS TO PUROK 10 SITIO TAPIS, TAMBONGON, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱38.4M | 72% | High risk86 | Flagged0.069 |
| 25NI0001POBLACION TO MAGSAYSAY TO OSMEÑA TO VILLAVERDE TO SSF KAHAYAGAN IN SUPPORT TO AGRIBUSINESS INDUSTRY, SITIO MABUHAY, KAHAYAGAN, TAGBINA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱35.8M | 85% | High risk74 | Flagged0.014 |
| 22LB0176CONSTRUCTION OF ROAD, PUROK 2 AND PUROK 8, BARANGAY MAHAYAG, BUNAWAN DISTRICT, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱9.8M | 100% | High risk72 | —-0.028 |
| 24LB0107CONSTRUCTION OF PANAGA-PANDAITAN (SITIO TIBUNGOL)-PARADISE EMBAK-JCT. MABUHAY PAÑALUM ROAD, DAVAO CITY, PACKAGE 3 | Region XI | Davao City DEO | On-Going | ₱98M | 92% | High risk61 | —-0.041 |
| 23LB0133CONSTRUCTION OF MISSING GAP, NRJ TAGUM - PANABO CIRCUMFERENTIAL ROAD BARANGAY MALITBOG TO MABUHAY, DAVAO DEL NORTE TO PAÑALUM, DAVAO CITY, DAVAO DEL NORTE | Region XI | Davao City DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.073 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25L00159CONSTRUCTION OF 2-STOREY NCMF DAVAO REGIONAL OFFICE BUILDING, RGC, BAGO OSHIRO, DAVAO CITY | Region XI | Region XI | On-Going | ₱71.3M | 2% | High risk88 | Flagged0.090 |
| 24LA0147CONSTRUCTION/COMPLETION OF KNP BUILDING, KINGKING, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱49.4M | 53% | High risk88 | Flagged0.073 |
| 24LA0138CONSTRUCTION OF CONCRETE ROAD, PUROK 6 SITIO NAGAS TO PUROK 10 SITIO TAPIS, TAMBONGON, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱38.4M | 72% | High risk86 | Flagged0.069 |
| 24LI0127CONSTRUCTION OF 2 UNITS OF 2-STOREY 10-CLASSROOM SCHOOL BUILDING IN MONKAYO CES, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱75.3M | 90% | High risk89 | Flagged0.067 |
| 24LB0117CONSTRUCTION OF 3-STOREY 9-CLASSROOM SCHOOL BUILDING AT BUHISAN NATIONAL HIGH SCHOOL, BRGY. TIBUNGCO, DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱39M | 99% | High risk86 | Flagged0.057 |
| 25ME0073CONSTRUCTION OF ROAD ALONG JCT. NHW ILAYA, DATALBUKAY - LANAO KAFANGLAO ROAD, GLAN, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱46.8M | 31% | High risk95 | Flagged0.041 |
| 25NI0064ROAD WIDENING - SECONDARY ROADS - SURIGAO - DAVAO COASTAL ROAD - K1444+334 - K1445+427, K1447+697 - K1448+700 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱93.6M | 31% | High risk87 | Flagged0.032 |
| 25NI0001POBLACION TO MAGSAYSAY TO OSMEÑA TO VILLAVERDE TO SSF KAHAYAGAN IN SUPPORT TO AGRIBUSINESS INDUSTRY, SITIO MABUHAY, KAHAYAGAN, TAGBINA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱35.8M | 85% | High risk74 | Flagged0.014 |
| 22LB0428CONSTRUCTION OF WATER SYSTEM AT PUROK 3 CENTRO AND PUROK 4 SITIO KAUSWAGAN,PUROK 5 SITIO TINAGO, DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱14.4M | 60% | Medium risk49 | Flagged0.013 |
| 24LB0108CONCRETING OF PUROK MALINAWON, SITIO QUARRY FMR, BRGY. MALABOG, PAQUIBATO DISTRICT, DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱49.5M | 86% | Medium risk53 | Flagged0.012 |
| 23LB0172CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BRGY. SAN ANTONIO, DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱29.6M | 79% | Medium risk42 | Flagged0.009 |
| 23N00189CONSTRUCTION OF REGIONAL EVACUATION CENTER | Region XIII | Region XIII | On-Going | ₱31.5M | 0% | Medium risk56 | Flagged0.007 |
| 24LA0142ROAD CONCRETING FROM CADUNAN NATIONAL HIGHWAY TO NEW MABINI SANITARY LANDFILL SITE MABINI, DAVAO DE ORO, PHASE 2 | Region XI | Davao de Oro 1st DEO | On-Going | ₱9.4M | 96% | Medium risk41 | Flagged0.003 |
| 25LK0064CONCRETING OF BRGY. SALAPAWAN FMR, BRGY. SALAPAWAN, PAQUIBATO DISTRICT, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱14.6M | 80% | Medium risk47 | Flagged0.003 |
| 24L00292CONSTRUCTION OF THREE-STOREY GREEN TECHNOLOGY EARTHQUAKE-PROOF TEACHER EDUCATION TECHNOLOGY ACADEMIC BUILDING, PHASE II, DAVAO ORIENTAL STATE UNIVERSITY, MATI, DAVAO ORIENTAL | Region XI | Region XI | On-Going | ₱14.7M | 92% | Medium risk41 | Flagged0.002 |
| 21LH0126CONSTRUCTION OF THE FOLLOWING PROJECTS AT BRGY. TAGURANO, TORIL DISTRICT, DAVAO CITY, LGSF-BPD, ELCAC (1) CONST. OF DAY CARE CENTER BESIDE BRGY. HALL AT PUROK 2, BRGY. TAGURANO, D.C. (2) CONST. OF ROAD AT PUROK 4, 5 AND 6, BRGY. TAGURANO, D.C. | Region XI | Davao City 2nd DEO | Completed | ₱19.5M | 100% | Medium risk42 | Flagged0.001 |
| 21LH0143CONST. OF THE FF. PROJECTS AT BRGY. KILATE, TORIL DIST., D.C., LGSF-BPD, ELCAC (1) CONST. OF WATER SUPPLY SYSTEM AT PUROK 1, BRGY. KILATE, D.C. (2) CONST. OF ROAD AT PUROK 1, BRGY. KILATE, D.C. | Region XI | Davao City 2nd DEO | Completed | ₱19.5M | 100% | Medium risk42 | Flagged0.001 |
| 21LH0154CONST. OF THE FF. PROJECTS AT BRGY. MARAPANGI, TORIL DIST., D.C., LGSF-BPD, ELCAC (1) CONST. OF ROAD AT PUROK 4, 5 AND 6, SITIO 2, BRGY. MARAPANGI, D.C. (2) CONST. OF ROAD AT PUROK 7, 8 AND 9, SITIO 3, BRGY. MARAPANGI, D.C. (3) CONST. OF WATER SUPPLY SYST | Region XI | Davao City 2nd DEO | Completed | ₱19.5M | 100% | Medium risk42 | Flagged0.001 |
| 21LH0152CONST. OF THE FF. PROJECTS AT BRGY. EDEN, TORIL DIST., LGSF-BPD, ELCAC (1) CONST. OF ROAD AT PUROK 1 AND PUROK 2, BRGY. EDEN, D.C. (2) CONST. OF HEALTH CENTER CONST. AT PUROK 4, BRGY. EDEN, D.C. (3) CONST. OF WATER SUPPLY SYSTEM AT PUROK 3, PUROK 4, PUROK | Region XI | Davao City 2nd DEO | Completed | ₱18.5M | 100% | Medium risk42 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 17LA0091CONSTRUCTION OF MPB/SENIOR CITIZENS BLDG. AT POBLACION, NABUNTURAN, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱1.5M | 100% | Low risk8 | —-0.053 |
| 177 | 17LA0129CONSTRUCTION OF MPB (BRGY. HALL) IN BRGY. CAMBAGANG, MUNICIPALITY OF MARAGUSAN, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱1.8M | 100% | Low risk8 | —-0.053 |
| 178 | 17LA0097CONSTRUCTION OF SENIOR CITIZENS BLDG. AT BRGY. NEW MANAY, MUNICIPALITY OF MARAGUSAN, MARAGUSAN, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱1.5M | 100% | Low risk8 | —-0.054 |
| 179 | 17LA0101CONSTRUCTION OF SOCIAL HALL WITH STAGE AT BRGY. MABUGNAO, MUNICIPALITY OF MARAGUSAN, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱1.5M | 100% | Low risk8 | —-0.054 |
| 180 | 17NH0074CONSTRUCTION OF ONE (1) UNIT (1) STOREY - TWO (2) CLASSROOM, NURCIA INTEGRATED SECONDARY SCHOOL (SCHOOL ID:317901) LANUZA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱3.3M | 100% | Low risk7 | —-0.013 |
| 181 | 17NH0076CONSTRUCTION OF ONE (1) UNIT ONE (1) STOREY - TWO (2) CLASSROOM, NURCIA ELEMENTARY SCHOOL (SCHOOL ID:132765), LANUZA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱3.3M | 100% | Low risk7 | —-0.013 |
| 182 | 19MB0050CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. LAGAO, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱2.5M | 100% | Low risk5 | —-0.080 |
| 183 | 17LD0092CONSTRUCTION OF CLASSROOMS, 1STY 2CL SAN VICENTE ES, MATANAO, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱2.6M | 100% | Low risk4 | —-0.017 |
| 184 | 17LD0098CONSTRUCTION OF CLASSROOMS, 1STY 2CL MALINAO AGRICULTURAL HS, BLDG. A, PADADA, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱2.6M | 100% | Low risk4 | —-0.016 |
| 185 | 17LD0135CONSTRUCTION OF CLASSROOMS, 1STY 2CL CERINO R. LAMOSA ELEMENTARY SCHOOL, HAGONOY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱2.6M | 100% | Low risk4 | —-0.017 |
| 186 | 17LD0137CONSTRUCTION OF CLASSROOMS, 1STY 2CL MALIIT DIGOS ES, HAGONOY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱2.7M | 100% | Low risk4 | —-0.017 |
| 187 | 17LD0145CONSTRUCTION OF CLASSROOMS, 1STY 2CL MALAWANIT ES, MAGSAYSAY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱2.6M | 100% | Low risk4 | —-0.018 |
| 188 | 17LD0088CONSTRUCTION OF CLASSROOMS, 1STY 2CL BULACAN ES, MALALAG, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱2.7M | 100% | Low risk4 | —-0.016 |
| 189 | 17LD0134CONSTRUCTION OF CLASSROOMS, 1STY 2CL APOLONIO R. FUENTES SR. ES, HAGONOY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱2.6M | 100% | Low risk4 | —-0.016 |
| 190 | 16LA0251CONSTRUCTION OF BHS TSEKAP @ OSMEÑA, COMPOSTELA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱1.5M | 100% | Low risk4 | —-0.011 |
| 191 | 16LA0260REPAIR OF BARANGAY HEALTH STATION @ SAN JOSE, MONTEVISTA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱1M | 100% | Low risk4 | —-0.012 |
| 192 | 17LH0152CONSTRUCTION OF 1 STANDARD TVL UNIQUE WORKSHOP BUILDING AT CROSSING BAYABAS-DON ENRIQUE NATIONAL HIGH SCHOOL, TORIL DISTRICT, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱3.3M | 100% | Low risk4 | —-0.018 |
| 193 | 17LD0142CONSTRUCTION OF CLASSROOMS, 1STY 2CL JOSE T. ARANGUEZ SR. ES, KIBLAWAN, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱2.6M | 100% | Low risk4 | —-0.017 |
| 194 | 17LD0100CONSTRUCTION OF CLASSROOMS, 1STY 2CL PERFECTO SAGARINO SR. NHS, SULOP, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱2.6M | 100% | Low risk4 | —-0.016 |
| 195 | 17LC0259CONSTRUCTION OF 1 UNIT TVL UNIQUE WORKSHOP BUILDING/LAB. FOR SHS AT TULALIAN NATIONAL HIGH SCHOOL, STO. TOMAS, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱3.3M | 100% | Low risk4 | —-0.019 |
| 196 | 17LD0150CONSTRUCTION OF CLASSROOMS, 1STY 2CL TAGANSULE ES, MALALAG, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱2.6M | 100% | Low risk4 | —-0.016 |
| 197 | 17LD0164CONSTRUCTION OF CLASSROOMS, 1STY 2CL TACUB PS, KIBLAWAN, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱2.8M | 100% | Low risk4 | —-0.017 |
| 198 | 17KA0075CONSTRUCTION OF 1-STOREY, 2-CLASSROOM SCHOOL BUILDING @KAATUAN ES, LANTAPAN, BUKIDNONLANTAPAN, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱3.4M | 100% | Low risk3 | —-0.025 |
| 199 | 17LB0193CONST. OF 1 STOREY 2CL SB AT CROSSING MALABOG ES, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱2.8M | 100% | Low risk3 | —-0.020 |