Opening the dossier…
Opening the dossier…
Contractor dossier
139 projects on file, including joint ventures this contractor is part of.
Total projects
139
Total budget
₱13.9B
Average progress
95.8%
Completion rate
87.1%
Average risk score
49.4
Medium risk on average, out of 100
Flagged as unusual
9
6.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 112 | ₱10.3B | 47.7 | 8 | 96.2% |
| Region X | 23 | ₱3.3B | 56.7 | 1 | 100.0% |
| Region IV-A | 4 | ₱296.6M | 55.4 | 0 | 61.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 73 | ₱6.6B | 46.6 | 0 | 97.2% |
| Flood Control and Drainage | 47 | ₱5.2B | 47.5 | 2 | 95.3% |
| Bridges | 7 | ₱1.1B | 58.7 | 1 | 85.7% |
| GAA 2025 OO-1 | 5 | ₱608.4M | 87.1 | 3 | 93.8% |
| OTHER | 3 | ₱238.6M | 81.5 | 3 | 93.4% |
| Buildings and Facilities | 3 | ₱16.2M | 25.9 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱116.2M | 65.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25NI0045PREVENTIVE MAINTENANCE - SECONDARY ROADS - NRJ BAROBO-AGUSAN DEL SUR BDRY RD - K1405 + 916 - K1407 + 343, K1409 + 000 - K1410 + 000, K1411 + 049 - K1412 + 525 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 86% | High risk94 | Flagged0.021 |
| 25NI0049PREVENTIVE MAINTENANCE - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1424+605 - K1428+605 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 92% | High risk91 | Flagged0.023 |
| 25NI0060PREVENTIVE MAINTENANCE - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1432+605 - K1436+605 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 91% | High risk91 | Flagged0.023 |
| 24NH0124CONST. OF FLOOD CONTROL STRUCTURE SAN AGUSTIN SUR, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.3M | 100% | High risk88 | Flagged0.049 |
| 25NI0056PREVENTIVE MAINTENANCE - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1448+740 - K1451+399, K1454+443 - K1457+084 | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱93.6M | 100% | High risk80 | —-0.007 |
| 25NI0041PREVENTIVE MAINTENANCE - PRIMARY ROADS - JCT LINGIG-TRENTO RD(S00312MN) - K1474 + 668 - K1479 + 589 | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱93.6M | 100% | High risk80 | —-0.006 |
| 24ND0040CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (DANKIAS SECTION) PACKAGE 2, BUTUAN CITY | Region XIII | Butuan City DEO | On-Going | ₱137.3M | 93% | High risk79 | Flagged0.021 |
| 24NB0090CONSTRUCTION OF BANK PROTECTION ALONG GIBONG RIVER (NAPO SECTION), BARANGAY NAPO, PROSPERIDAD, AGUSAN DEL SUR, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱53.1M | 87% | High risk77 | Flagged0.009 |
| 18D00072ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BYPASS / DIVERSION ROADS BACOOR DIVERSION ROAD, INCL. ROW, CAVITE | Region IV-A | Region IV-A | Completed | ₱116.2M | 100% | High risk66 | —-0.044 |
| 23K00107CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 9, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱282.2M | 100% | High risk64 | Flagged0.001 |
| 22K00270CONST./IMPRVT. OF ACCESS ROADS LEADING TO AIRPORTS(KALSADA TUNGO SA PALIPARAN,RILES AT DAUNGAN PROGRAM-KATUPARAN) CDO-OPOL-EL SALVADOR-ALUBIJID-LAGUINDINGAN AIRPORT (PUEBLO DE ORO/CDO AIRPORT TO JCT. BCIR LAGUINDINGAN) MOUNTAIN DIVERSION ROAD (PAGATPAT BR | Region X | Region X | Completed | ₱168.7M | 100% | High risk63 | —-0.027 |
| 23K00204CONSTRUCTION OF MANDULOG BRIDGE 4 (PACKAGE 4), BAYUG ISLAND, ILIGAN CITY | Region X | Region X | Completed | ₱282.2M | 100% | High risk63 | —-0.010 |
| 23K00203CONSTRUCTION OF MANDULOG BRIDGE 4 (PACKAGE 3), BAYUG ISLAND, ILIGAN CITY | Region X | Region X | Completed | ₱282.2M | 100% | High risk63 | —-0.013 |
| 23K00136CONSTRUCTION OF MISSING LINKS / NEW ROADS, IMPASUG-ONG BDRY. BUKIDNON (SILOO)-MISAMIS ORIENTAL (EUREKA), PACKAGE 25, BUKIDNON | Region X | Region X | Completed | ₱143M | 100% | High risk62 | —-0.072 |
| 23K00112CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CDOC-ILIGAN HINTERLAND ROAD (JCT. CDO-KIBARITAN ROAD/DANSOLIHON-JCT. IBR/ROGONGON, ILIGAN CITY) ALTERNATE ROAD, PACKAGE 15, LANAO DEL NORTE | Region X | Region X | Completed | ₱289.5M | 100% | High risk62 | —-0.053 |
| 23K00127CONSTRUCTION OF CDOC-ILIGAN HINTERLAND ROAD, (JCT. CDO-KIBARITAN ROAD/DANSOLIHON-JCT. IBR/RORONGON, ILIGAN CITY) ALTERNATE ROAD, PACKAGE 17, LANAO DEL NORTE | Region X | Region X | Completed | ₱234M | 100% | High risk62 | —-0.057 |
| 23K00195PREVENTIVE MAINTENANCE - SECONDARY ROADS, CDO - AIRPORT - BUKIDNON RD, K1456+ 176 - K1458 + 365, K1459 + 090 - K1459 + 440 | Region X | Region X | Completed | ₱235.2M | 100% | High risk62 | —-0.056 |
| 22K00224CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NAAWAN RIVER DOWNSTREAM OF NAAWAN BRIDGE (LEFT SIDE), PACKAGE 1, NAAWAN MISAMIS ORIENTAL (STA. 0+000.00 - STA. 0+506.955) | Region X | Region X | Completed | ₱137.5M | 100% | High risk61 | —-0.056 |
| 22K00016CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, MAGSAYSAY-BUTUAN CITY COASTAL BYPASS/ ALTERNATE ROAD, MISAMIS ORIENTAL | Region X | Region X | Completed | ₱137.5M | 100% | High risk61 | —-0.032 |
| 23K00075CONST. OF BY-PASS AND DIVERSION ROADS ,ILIGAN CITY COASTAL BYPASS ROAD, PACKAGE 18, LANAO DEL NORTE | Region X | Region X | Completed | ₱243.4M | 100% | High risk61 | —-0.056 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24NH0124CONST. OF FLOOD CONTROL STRUCTURE SAN AGUSTIN SUR, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.3M | 100% | High risk88 | Flagged0.049 |
| 25NI0060PREVENTIVE MAINTENANCE - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1432+605 - K1436+605 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 91% | High risk91 | Flagged0.023 |
| 25NI0049PREVENTIVE MAINTENANCE - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1424+605 - K1428+605 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 92% | High risk91 | Flagged0.023 |
| 25NI0045PREVENTIVE MAINTENANCE - SECONDARY ROADS - NRJ BAROBO-AGUSAN DEL SUR BDRY RD - K1405 + 916 - K1407 + 343, K1409 + 000 - K1410 + 000, K1411 + 049 - K1412 + 525 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 86% | High risk94 | Flagged0.021 |
| 24ND0040CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (DANKIAS SECTION) PACKAGE 2, BUTUAN CITY | Region XIII | Butuan City DEO | On-Going | ₱137.3M | 93% | High risk79 | Flagged0.021 |
| 25N00155LAS NIEVES BRIDGE ALONG NRJ AGUSAN-MALAYBALAY ROAD-BRGY. AMBACON-BRGY. MALICATO-NRJ DAANG MAHARLIKA, PHASE 8, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱93.6M | 0% | Medium risk49 | Flagged0.014 |
| 25ND0151CONSTRUCTION OF MAIN DRAINAGE ALONG DURANO EXTENSION TO NRJ MALAYBALAY ROAD, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Butuan City DEO | On-Going | ₱28.6M | 3% | Medium risk54 | Flagged0.010 |
| 24NB0090CONSTRUCTION OF BANK PROTECTION ALONG GIBONG RIVER (NAPO SECTION), BARANGAY NAPO, PROSPERIDAD, AGUSAN DEL SUR, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱53.1M | 87% | High risk77 | Flagged0.009 |
| 23K00107CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 9, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱282.2M | 100% | High risk64 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25NI0045PREVENTIVE MAINTENANCE - SECONDARY ROADS - NRJ BAROBO-AGUSAN DEL SUR BDRY RD - K1405 + 916 - K1407 + 343, K1409 + 000 - K1410 + 000, K1411 + 049 - K1412 + 525 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 86% | High risk94 | Flagged0.021 |
| 2 | 25NI0049PREVENTIVE MAINTENANCE - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1424+605 - K1428+605 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 92% | High risk91 | Flagged0.023 |
| 3 | 25NI0060PREVENTIVE MAINTENANCE - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1432+605 - K1436+605 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 91% | High risk91 | Flagged0.023 |
| 4 | 24NH0124CONST. OF FLOOD CONTROL STRUCTURE SAN AGUSTIN SUR, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.3M | 100% | High risk88 | Flagged0.049 |
| 5 | 25NI0056PREVENTIVE MAINTENANCE - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1448+740 - K1451+399, K1454+443 - K1457+084 | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱93.6M | 100% | High risk80 | —-0.007 |
| 6 | 25NI0041PREVENTIVE MAINTENANCE - PRIMARY ROADS - JCT LINGIG-TRENTO RD(S00312MN) - K1474 + 668 - K1479 + 589 | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱93.6M | 100% | High risk80 | —-0.006 |
| 7 | 24ND0040CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (DANKIAS SECTION) PACKAGE 2, BUTUAN CITY | Region XIII | Butuan City DEO | On-Going | ₱137.3M | 93% | High risk79 | Flagged0.021 |
| 8 | 24NB0090CONSTRUCTION OF BANK PROTECTION ALONG GIBONG RIVER (NAPO SECTION), BARANGAY NAPO, PROSPERIDAD, AGUSAN DEL SUR, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱53.1M | 87% | High risk77 | Flagged0.009 |
| 9 | 18D00072ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BYPASS / DIVERSION ROADS BACOOR DIVERSION ROAD, INCL. ROW, CAVITE | Region IV-A | Region IV-A | Completed | ₱116.2M | 100% | High risk66 | —-0.044 |
| 10 | 23K00107CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 9, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱282.2M | 100% | High risk64 | Flagged0.001 |
| 11 | 22K00270CONST./IMPRVT. OF ACCESS ROADS LEADING TO AIRPORTS(KALSADA TUNGO SA PALIPARAN,RILES AT DAUNGAN PROGRAM-KATUPARAN) CDO-OPOL-EL SALVADOR-ALUBIJID-LAGUINDINGAN AIRPORT (PUEBLO DE ORO/CDO AIRPORT TO JCT. BCIR LAGUINDINGAN) MOUNTAIN DIVERSION ROAD (PAGATPAT BR | Region X | Region X | Completed | ₱168.7M | 100% | High risk63 | —-0.027 |
| 12 | 23K00204CONSTRUCTION OF MANDULOG BRIDGE 4 (PACKAGE 4), BAYUG ISLAND, ILIGAN CITY | Region X | Region X | Completed | ₱282.2M | 100% | High risk63 | —-0.010 |
| 13 | 23K00203CONSTRUCTION OF MANDULOG BRIDGE 4 (PACKAGE 3), BAYUG ISLAND, ILIGAN CITY | Region X | Region X | Completed | ₱282.2M | 100% | High risk63 | —-0.013 |
| 14 | 23K00136CONSTRUCTION OF MISSING LINKS / NEW ROADS, IMPASUG-ONG BDRY. BUKIDNON (SILOO)-MISAMIS ORIENTAL (EUREKA), PACKAGE 25, BUKIDNON | Region X | Region X | Completed | ₱143M | 100% | High risk62 | —-0.072 |
| 15 | 23K00112CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CDOC-ILIGAN HINTERLAND ROAD (JCT. CDO-KIBARITAN ROAD/DANSOLIHON-JCT. IBR/ROGONGON, ILIGAN CITY) ALTERNATE ROAD, PACKAGE 15, LANAO DEL NORTE | Region X | Region X | Completed | ₱289.5M | 100% | High risk62 | —-0.053 |
| 16 | 23K00127CONSTRUCTION OF CDOC-ILIGAN HINTERLAND ROAD, (JCT. CDO-KIBARITAN ROAD/DANSOLIHON-JCT. IBR/RORONGON, ILIGAN CITY) ALTERNATE ROAD, PACKAGE 17, LANAO DEL NORTE | Region X | Region X | Completed | ₱234M | 100% | High risk62 | —-0.057 |
| 17 | 23K00195PREVENTIVE MAINTENANCE - SECONDARY ROADS, CDO - AIRPORT - BUKIDNON RD, K1456+ 176 - K1458 + 365, K1459 + 090 - K1459 + 440 | Region X | Region X | Completed | ₱235.2M | 100% | High risk62 | —-0.056 |
| 18 | 22K00224CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NAAWAN RIVER DOWNSTREAM OF NAAWAN BRIDGE (LEFT SIDE), PACKAGE 1, NAAWAN MISAMIS ORIENTAL (STA. 0+000.00 - STA. 0+506.955) | Region X | Region X | Completed | ₱137.5M | 100% | High risk61 | —-0.056 |
| 19 | 22K00016CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, MAGSAYSAY-BUTUAN CITY COASTAL BYPASS/ ALTERNATE ROAD, MISAMIS ORIENTAL | Region X | Region X | Completed | ₱137.5M | 100% | High risk61 | —-0.032 |
| 20 | 23K00075CONST. OF BY-PASS AND DIVERSION ROADS ,ILIGAN CITY COASTAL BYPASS ROAD, PACKAGE 18, LANAO DEL NORTE | Region X | Region X | Completed | ₱243.4M | 100% | High risk61 | —-0.056 |
| 21 | 21K00140CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, CDO-OPOL-EL SALVADOR-ALUBIJID-LAGUINDINGAN AIRPORT (PUEBLO DE ORO/CDO AIRPORT TO JCT. BCIR LAGUINDINGAN) MOUNTAIN DIVERSION ROAD (PAGATPAT BRIDGE), CAGAYAN DE ORO CITY, K1+165.581 - K1+560.581 | Region X | Region X | Completed | ₱96.2M | 100% | High risk60 | —-0.045 |
| 22 | 22K00012CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ILIGAN CITY CIRCUMFERENTIAL ROAD EXTENSION TO JCT. STA. FELOMINA-BONBONON-DIGKILAAN-ROGONGON ROAD, PACKAGE 4, LANAO DEL NORTE | Region X | Region X | Completed | ₱101.3M | 100% | Medium risk56 | —-0.080 |
| 23 | 22K00185CONSTRUCTION OF SEASIDE BOULEVARD ALONG VILLANUEVA BAY, BARANGAY POBLACION 1 TO BARANGAY LOOC SECTION, PHASE 3, VILLANUEVA, MISAMIS ORIENTAL | Region X | Region X | Completed | ₱105.3M | 100% | Medium risk56 | —-0.079 |
| 24 | 23N00083BDRY. BUKIDNON/AGUSAN DEL NORTE, LAWAN-LAWAN SECTION, PACKAGE K, LAS NIEVES | Region XIII | Region XIII | Completed | ₱208.4M | 100% | Medium risk55 | —-0.058 |
| 25 | 24N00083CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (AMBACON SECTION) DOWNSTREAM, PHASE 2, LAS NIEVES, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱154.4M | 100% | Medium risk55 | —-0.046 |