Contractor dossier
139 projects on file, including joint ventures this contractor is part of.
Total projects
139
Total budget
₱13.9B
Average progress
95.8%
Completion rate
87.1%
Average risk score
49.4
Medium risk on average, out of 100
Flagged as unusual
9
6.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 112 | ₱10.3B | 47.7 | 8 | 96.2% |
| Region X | 23 | ₱3.3B | 56.7 | 1 | 100.0% |
| Region IV-A | 4 | ₱296.6M | 55.4 | 0 | 61.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 73 | ₱6.6B | 46.6 | 0 | 97.2% |
| Flood Control and Drainage | 47 | ₱5.2B | 47.5 | 2 | 95.3% |
| Bridges | 7 | ₱1.1B | 58.7 | 1 | 85.7% |
| GAA 2025 OO-1 | 5 | ₱608.4M | 87.1 | 3 | 93.8% |
| OTHER | 3 | ₱238.6M | 81.5 | 3 | 93.4% |
| Buildings and Facilities | 3 | ₱16.2M | 25.9 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱116.2M | 65.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25NI0045PREVENTIVE MAINTENANCE - SECONDARY ROADS - NRJ BAROBO-AGUSAN DEL SUR BDRY RD - K1405 + 916 - K1407 + 343, K1409 + 000 - K1410 + 000, K1411 + 049 - K1412 + 525 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 86% | High risk94 | Flagged0.021 |
| 25NI0049PREVENTIVE MAINTENANCE - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1424+605 - K1428+605 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 92% | High risk91 | Flagged0.023 |
| 25NI0060PREVENTIVE MAINTENANCE - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1432+605 - K1436+605 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 91% | High risk91 | Flagged0.023 |
| 24NH0124CONST. OF FLOOD CONTROL STRUCTURE SAN AGUSTIN SUR, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.3M | 100% | High risk88 | Flagged0.049 |
| 25NI0056PREVENTIVE MAINTENANCE - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1448+740 - K1451+399, K1454+443 - K1457+084 | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱93.6M | 100% | High risk80 | —-0.007 |
| 25NI0041PREVENTIVE MAINTENANCE - PRIMARY ROADS - JCT LINGIG-TRENTO RD(S00312MN) - K1474 + 668 - K1479 + 589 | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱93.6M | 100% | High risk80 | —-0.006 |
| 24ND0040CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (DANKIAS SECTION) PACKAGE 2, BUTUAN CITY | Region XIII | Butuan City DEO | On-Going | ₱137.3M | 93% | High risk79 | Flagged0.021 |
| 24NB0090CONSTRUCTION OF BANK PROTECTION ALONG GIBONG RIVER (NAPO SECTION), BARANGAY NAPO, PROSPERIDAD, AGUSAN DEL SUR, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱53.1M | 87% | High risk77 | Flagged0.009 |
| 18D00072ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BYPASS / DIVERSION ROADS BACOOR DIVERSION ROAD, INCL. ROW, CAVITE | Region IV-A | Region IV-A | Completed | ₱116.2M | 100% | High risk66 | —-0.044 |
| 23K00107CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 9, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱282.2M | 100% | High risk64 | Flagged0.001 |
| 22K00270CONST./IMPRVT. OF ACCESS ROADS LEADING TO AIRPORTS(KALSADA TUNGO SA PALIPARAN,RILES AT DAUNGAN PROGRAM-KATUPARAN) CDO-OPOL-EL SALVADOR-ALUBIJID-LAGUINDINGAN AIRPORT (PUEBLO DE ORO/CDO AIRPORT TO JCT. BCIR LAGUINDINGAN) MOUNTAIN DIVERSION ROAD (PAGATPAT BR | Region X | Region X | Completed | ₱168.7M | 100% | High risk63 | —-0.027 |
| 23K00204CONSTRUCTION OF MANDULOG BRIDGE 4 (PACKAGE 4), BAYUG ISLAND, ILIGAN CITY | Region X | Region X | Completed | ₱282.2M | 100% | High risk63 | —-0.010 |
| 23K00203CONSTRUCTION OF MANDULOG BRIDGE 4 (PACKAGE 3), BAYUG ISLAND, ILIGAN CITY | Region X | Region X | Completed | ₱282.2M | 100% | High risk63 | —-0.013 |
| 23K00136CONSTRUCTION OF MISSING LINKS / NEW ROADS, IMPASUG-ONG BDRY. BUKIDNON (SILOO)-MISAMIS ORIENTAL (EUREKA), PACKAGE 25, BUKIDNON | Region X | Region X | Completed | ₱143M | 100% | High risk62 | —-0.072 |
| 23K00112CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CDOC-ILIGAN HINTERLAND ROAD (JCT. CDO-KIBARITAN ROAD/DANSOLIHON-JCT. IBR/ROGONGON, ILIGAN CITY) ALTERNATE ROAD, PACKAGE 15, LANAO DEL NORTE | Region X | Region X | Completed | ₱289.5M | 100% | High risk62 | —-0.053 |
| 23K00127CONSTRUCTION OF CDOC-ILIGAN HINTERLAND ROAD, (JCT. CDO-KIBARITAN ROAD/DANSOLIHON-JCT. IBR/RORONGON, ILIGAN CITY) ALTERNATE ROAD, PACKAGE 17, LANAO DEL NORTE | Region X | Region X | Completed | ₱234M | 100% | High risk62 | —-0.057 |
| 23K00195PREVENTIVE MAINTENANCE - SECONDARY ROADS, CDO - AIRPORT - BUKIDNON RD, K1456+ 176 - K1458 + 365, K1459 + 090 - K1459 + 440 | Region X | Region X | Completed | ₱235.2M | 100% | High risk62 | —-0.056 |
| 22K00224CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NAAWAN RIVER DOWNSTREAM OF NAAWAN BRIDGE (LEFT SIDE), PACKAGE 1, NAAWAN MISAMIS ORIENTAL (STA. 0+000.00 - STA. 0+506.955) | Region X | Region X | Completed | ₱137.5M | 100% | High risk61 | —-0.056 |
| 22K00016CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, MAGSAYSAY-BUTUAN CITY COASTAL BYPASS/ ALTERNATE ROAD, MISAMIS ORIENTAL | Region X | Region X | Completed | ₱137.5M | 100% | High risk61 | —-0.032 |
| 23K00075CONST. OF BY-PASS AND DIVERSION ROADS ,ILIGAN CITY COASTAL BYPASS ROAD, PACKAGE 18, LANAO DEL NORTE | Region X | Region X | Completed | ₱243.4M | 100% | High risk61 | —-0.056 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24NH0124CONST. OF FLOOD CONTROL STRUCTURE SAN AGUSTIN SUR, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.3M | 100% | High risk88 | Flagged0.049 |
| 25NI0060PREVENTIVE MAINTENANCE - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1432+605 - K1436+605 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 91% | High risk91 | Flagged0.023 |
| 25NI0049PREVENTIVE MAINTENANCE - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1424+605 - K1428+605 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 92% | High risk91 | Flagged0.023 |
| 25NI0045PREVENTIVE MAINTENANCE - SECONDARY ROADS - NRJ BAROBO-AGUSAN DEL SUR BDRY RD - K1405 + 916 - K1407 + 343, K1409 + 000 - K1410 + 000, K1411 + 049 - K1412 + 525 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱140.4M | 86% | High risk94 | Flagged0.021 |
| 24ND0040CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (DANKIAS SECTION) PACKAGE 2, BUTUAN CITY | Region XIII | Butuan City DEO | On-Going | ₱137.3M | 93% | High risk79 | Flagged0.021 |
| 25N00155LAS NIEVES BRIDGE ALONG NRJ AGUSAN-MALAYBALAY ROAD-BRGY. AMBACON-BRGY. MALICATO-NRJ DAANG MAHARLIKA, PHASE 8, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱93.6M | 0% | Medium risk49 | Flagged0.014 |
| 25ND0151CONSTRUCTION OF MAIN DRAINAGE ALONG DURANO EXTENSION TO NRJ MALAYBALAY ROAD, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Butuan City DEO | On-Going | ₱28.6M | 3% | Medium risk54 | Flagged0.010 |
| 24NB0090CONSTRUCTION OF BANK PROTECTION ALONG GIBONG RIVER (NAPO SECTION), BARANGAY NAPO, PROSPERIDAD, AGUSAN DEL SUR, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱53.1M | 87% | High risk77 | Flagged0.009 |
| 23K00107CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 9, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱282.2M | 100% | High risk64 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 18ND0144CONSTRUCTION OF FLOODGATE AT BRGY. MANTANGE, AGUSAN RIVER, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Butuan City DEO | Completed | ₱72.4M | 100% | Medium risk44 | —-0.060 |
| 102 | 18ND0045CONSTRUCTION OF BANK PROTECTION ALONG AGUSAN RIVER BASIN PROTECTING BANZA RUINS, BUTUAN CITY | Region XIII | Butuan City DEO | Completed | ₱77.2M | 100% | Medium risk43 | —-0.064 |
| 103 | 22ND0030CONSTRUCTION OF MAIN DRAINAGE CANAL, NRJ BCIR TO PROVINCIAL HOSPITAL TO LADP, BUTUAN CITY, AGUSAN DEL NORTE 1ST LD | Region XIII | Butuan City DEO | Completed | ₱67.3M | 100% | Medium risk43 | —-0.061 |
| 104 | 24NH0061CONSTRUCTION OF DIKE IN BARANGAY CABANGAHAN, CANTILAN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱72.4M | 100% | Medium risk43 | —-0.063 |
| 105 | 25N00219CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG AGUSAN RIVER BASIN (BIT-OS SECTION) PACKAGE 3, BUTUAN CITY | Region XIII | Region XIII | On-Going | ₱62.2M | 0% | Medium risk42 | —-0.007 |
| 106 | 23N00140REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG TAGO RIVER, ABUTMENT A, SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱60.8M | 100% | Medium risk42 | —-0.060 |
| 107 | 22N00012SURIGAO-DAVAO COASTAL RD, (S00300MN)-K1461+099-K1463+112, K1463+112- K1463+481, K1471+566- K1473+506.44, BISLIG, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱97.5M | 100% | Medium risk42 | —-0.067 |
| 108 | 22N00010JCT LINGIG - TRENTO RD (S00312MN) - K1472+(-647) - K1474+815.55, BISLIG, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱101.3M | 100% | Medium risk42 | —-0.065 |
| 109 | 17ND0054IMPROVEMENT OF BANK PROTECTION ALONG BUTUAN CIYT-MALAYBALAY ROAD (DANKIAS SECTION) K1269+121.60-K1269+161.20, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Butuan City DEO | Completed | ₱30.6M | 100% | Medium risk41 | —-0.003 |
| 110 | 17ND0055IMPROVEMENT OF BANK PROTECTION ALONG BUTUAN CITY-MALAYBALAY ROAD (DANKIAS SECTION) K1269+081.60-K1269+121.60, TUNGAO, AGUSAN DEL NORTE | Region XIII | Butuan City DEO | Completed | ₱30.7M | 100% | Medium risk41 | —-0.003 |
| 111 | 22NH0031SURIGAO-DAVAO COASTAL RD. K1308+300 - K1308+656, K1308+689 - K1309+573, K1309+627 - K1310+000, TAGO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱53.7M | 100% | Medium risk41 | —-0.075 |
| 112 | 22N00125NRJ SITIO CANSOAN-GANAYON LEADING TO WHITE SAND BEACH, LIANGA, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱49.2M | 100% | Medium risk41 | —-0.069 |
| 113 | 23NA0025REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS, DAANG MAHARLIKA (SURIGAO-AGUSAN SECTION) K1172+372.80 - K1172+408, K1172+433.20 - K1172+472 | Region XIII | Agusan del Norte DEO | Completed | ₱29.1M | 100% | Medium risk39 | —-0.080 |
| 114 | 19ND0030CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO LAWAAN PARK, BRGY. TUNGAO, AGUSAN DEL NORTE | Region XIII | Butuan City DEO | Completed | ₱29.4M | 100% | Medium risk39 | —-0.087 |
| 115 | 24N00001CANTILAN-MADRID BYPASS ROAD (SDCR ALTERNATE ROUTE), SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱33.8M | 100% | Medium risk39 | —-0.083 |
| 116 | 24NA0035CONSTRUCTION OF PUROK SUYATAN ROAD TO BARANGAY POBLACION 2, TUBAY, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱19.6M | 100% | Medium risk39 | —-0.089 |
| 117 | 18ND0049CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO LAWAAN PARK, BRGY. TUNGAO, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Butuan City DEO | Completed | ₱19.6M | 100% | Medium risk39 | —-0.087 |
| 118 | 23ND0028NRJ LEADING TO MT. MAYAPAY (DELTA DISCOVERY PARK), BIT-OS SECTION, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Butuan City DEO | Completed | ₱21.5M | 100% | Medium risk39 | —-0.088 |
| 119 | 18ND0066PREVENTIVE MAINTENANCE ALONG MAYOR DEMOCRITO D. PLAZA II AVE. K1246+500-K1247+000, K1248+686-K1249+500, BUTUAN CITY | Region XIII | Butuan City DEO | Completed | ₱11.4M | 100% | Medium risk39 | —-0.085 |
| 120 | 18NA0013CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE & DRAINAGE SYSTEMS - CONSTRUCTION/IMPROVEMENT OF GUIHAO-AN RIVER FLOOD CONTROL WITH RECHANNELIZATION (GUINABSAN SECTION), BUENAVISTA, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱39.2M | 100% | Medium risk39 | —-0.070 |
| 121 | 20NA0036REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - DAANG MAHARLIKA (SURIGAO-AGUSAN SECTION), K1220+243.80 - K1220+343.80, K1220+375.80 - K1220+475.80 AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱9.6M | 100% | Medium risk38 | —-0.085 |
| 122 | 23ND0065CONSTRUCTION OF ROAD WITH STREET LIGHTS, BARANGAY CONSORCIA, LAS NIEVES, AGUSAN DEL NORTE | Region XIII | Butuan City DEO | Completed | ₱4.9M | 100% | Medium risk38 | —-0.083 |
| 123 | 20NB0011PAVING OF UNPAVED ROADS - BUTUAN CITY-TALACOGON-LORETO-VERUELA-STA. JOSEFA ROAD (CHAINAGE 7254 CHAINAGE 7682), ESPERANZA, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱10.9M | 100% | Medium risk38 | —-0.083 |
| 124 | 20NB0006ROAD WIDENING - DAANG MAHARLIKA (AGUSAN-DAVAO SECTION) K1262+505.80-K1263+000.00, BRGY. CANAYUGAN, BAYUGAN, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱13.7M | 100% | Medium risk38 | —-0.083 |
| 125 | 23N00194CONSTRUCTION OF FLOOD CONTROL STRUCTURES OF AGUSAN RIVER BASIN (BIT-OS SECTION) PACKAGE 4, BUTUAN CITY | Region XIII | Region XIII | On-Going | ₱45.6M | 90% | Medium risk38 | —-0.026 |