Contractor dossier
140 projects on file, including joint ventures this contractor is part of.
Total projects
140
Total budget
₱3.1B
Average progress
88.4%
Completion rate
74.3%
Average risk score
47.7
Medium risk on average, out of 100
Flagged as unusual
7
5.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 140 | ₱3.1B | 47.7 | 7 | 88.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 76 | ₱1.7B | 43.6 | 0 | 92.0% |
| Buildings and Facilities | 24 | ₱264.3M | 43.4 | 0 | 88.4% |
| Bridges | 15 | ₱297.9M | 49.0 | 0 | 94.7% |
| OTHER | 9 | ₱392.7M | 69.3 | 1 | 88.9% |
| Flood Control and Drainage | 9 | ₱440.7M | 54.2 | 1 | 88.5% |
| GAA 2025 SSP | 4 | ₱24.2M | 94.1 | 4 | 11.4% |
| Water Provision and Storage | 3 | ₱8M | 31.7 | 1 | 66.7% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DP0102CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY MOJON, LILIW, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱4.8M | 0% | High risk95 | Flagged0.024 |
| 25DO0095CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY AMPID I, SAN MATEO, RIZAL | Region IV-A | Rizal 2nd DEO | On-Going | ₱4.9M | 36% | High risk94 | Flagged0.012 |
| 25DO0072CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MALANDAY, SAN MATEO, RIZAL | Region IV-A | Rizal 2nd DEO | On-Going | ₱4.9M | 10% | High risk94 | Flagged0.024 |
| 25DP0104CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF CONCRETE ROAD, BARANGAY TALANGAN, NAGCARLAN, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱9.6M | 0% | High risk94 | Flagged0.024 |
| 17D00027NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASSES/DIVERSION ROADS INCL. ROW TIAONG BY-PASS ROAD, ROAD AND BRIDGE WIDENING, QUEZON 2ND L.D., QUEZON PROVINCE | Region IV-A | Quezon 2nd DEO | Completed | ₱144.7M | 100% | High risk72 | —-0.048 |
| 16DJ0052OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, TERTIARY ROADS, SAN JUAN-CANDELARIA JCT.-CANDELARIA-BOLBOC ROAD, S02002LZ, K0153+520-K0155+225 CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱48.9M | 100% | High risk72 | —-0.041 |
| 16DJ0050IMPROVEMENT/WIDENING OF NATIONAL ROADS-TERTIARY, S02002LZ, SAN JUAN CANDELARIA JCT.-CANDELARIA-BOLBOC ROAD, K0146+-440-K0146+670, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱48.5M | 100% | High risk72 | —-0.042 |
| 18DP0032ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG PRIMARY ROADS, SAN PABLO-RIZAL-NAGCARLAN-LILIW RD. K0103 + -177.2 K0103 + -049.5, K0103 + -128.7 - K0103 + -049.5 | Region IV-A | Laguna 3rd DEO | Completed | ₱19.1M | 100% | High risk71 | —-0.042 |
| 22DP0058SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF JCT. DAANG MAHARLIKA TO SAN FRANCISCO (BALOC) ROAD, SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱64.7M | 100% | High risk71 | —-0.040 |
| 22DP0059SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION/IMPROVEMENT OF CIRCUMFERENTIAL ROAD AT SAMPALOC LAKE, BRGY. CONCEPCION, SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱57.9M | 100% | High risk71 | —-0.041 |
| 18DP0045CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS AT SAMPALOC LAKE CIRCUMFERENTIAL ROAD, SAN PABLO, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱48.7M | 100% | High risk70 | —-0.043 |
| 19DP0008ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE -TERTIARY ROADS AT LIPA CITY - ALAMINOS RD., K0079 + 100 - K0079 +250, K0080 + 200 -K0080 + 300, K0080 + 500 - K008 + 750 | Region IV-A | Laguna 3rd DEO | Completed | ₱55.6M | 100% | High risk70 | —-0.042 |
| 25DF0118CONVERGENCE & SPECIAL SUPPORT PROGSUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS RDS &/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BLDGS/ FACILITIES CONST OF PUNTA-OPEN CANAL DIVERSION RD PASONG KAWAYAN I SEC GEN.TRI | Region IV-A | Cavite 1st DEO | On-Going | ₱50.5M | 0% | High risk70 | —-0.018 |
| 25DO0025CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE OF RIVERBANK, BARAN | Region IV-A | Rizal 2nd DEO | On-Going | ₱4.9M | 91% | High risk69 | —-0.024 |
| 20DI0101WIDENING AND EXTENSION OF IPB ROAD, LOS BAÑOS, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱46.5M | 100% | High risk69 | —-0.037 |
| 25DO0006ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MANILA EAST RD - K0041 + 515 - K0042 + 613 | Region IV-A | Rizal 2nd DEO | On-Going | ₱40.1M | 100% | High risk66 | —-0.051 |
| 25DO0024ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - TERTIARY ROADS - MARIKINA-INFANTA RD - K0038 + (-493) - K0038 + 400 | Region IV-A | Rizal 2nd DEO | On-Going | ₱45.6M | 48% | High risk66 | —-0.032 |
| 24DI0174CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG STA. ROSA RIVER (NEAR TRUSS BRIDGE), STO. DOMINGO SIDE, SANTA ROSA, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱93.9M | 91% | High risk65 | —-0.039 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DP0102CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY MOJON, LILIW, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱4.8M | 0% | High risk95 | Flagged0.024 |
| 25DP0104CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF CONCRETE ROAD, BARANGAY TALANGAN, NAGCARLAN, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱9.6M | 0% | High risk94 | Flagged0.024 |
| 25DO0072CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MALANDAY, SAN MATEO, RIZAL | Region IV-A | Rizal 2nd DEO | On-Going | ₱4.9M | 10% | High risk94 | Flagged0.024 |
| 24DP0112CSSP - RAINWATER COLLECTOR SYSTEM - RAINWATER COLLECTORS IN PUBLIC FACILITIES | Region IV-A | Laguna 3rd DEO | On-Going | ₱2.9M | 0% | Medium risk58 | Flagged0.019 |
| 24DP0204CSSP - (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF DRAINAGE CANAL (PHASE 2), BARANGAY NANHAYA, BARANGAY SAN ROQUE, AND BARANGAY PAGALANGAN, VICTORIA, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱18.9M | 41% | Medium risk51 | Flagged0.016 |
| 25DO0095CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY AMPID I, SAN MATEO, RIZAL | Region IV-A | Rizal 2nd DEO | On-Going | ₱4.9M | 36% | High risk94 | Flagged0.012 |
| 25DO0120CONVERGENCE AND SPECIAL SUPPORT PROGRAM - RAINWATER COLLECTOR SYSTEM AT VARIOUS SITES, TANAY, RIZAL | Region IV-A | Rizal 2nd DEO | On-Going | ₱2.6M | 0% | Medium risk46 | Flagged0.010 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 24DP0123CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD, BRGY. MALABO-KALANTUKAN, LILIW, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱34.6M | 41% | Medium risk47 | —-0.053 |
| 52 | 19DP0070LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION OF FOOT BRIDGE, BARANGAY SAN BENITO, ALAMINOS, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱14.7M | 100% | Medium risk47 | —-0.068 |
| 53 | 23DO0115ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - SAMPALOC BR. (B02854LZ) ALONG TANAY-SAMPALOC RD | Region IV-A | Rizal 2nd DEO | On-Going | ₱21.6M | 100% | Medium risk47 | —-0.027 |
| 54 | 19DP0005BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - BUNGKOL BR. (B00078LZ) ALONG SAN PABLO - RIZAL - NAGCARLAN - LILIW RD. | Region IV-A | Laguna 3rd DEO | Completed | ₱8.6M | 100% | Medium risk47 | —-0.068 |
| 55 | 24DP0054CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD, BRGY. SAN FRANCISCO, SAN PABLO, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱29.7M | 100% | Medium risk47 | —-0.104 |
| 56 | 22DP0008ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0074 + 987 - K0075 + 400, K0076 + 124.25 - K0077 + 000 | Region IV-A | Laguna 3rd DEO | Completed | ₱32.5M | 100% | Medium risk47 | —-0.105 |
| 57 | 18DP0031NETWORK DEVELOPMENT PROGRAM ROAD WIDENING OF TERTIARY ROADS, CALAUAN -NAGCARLAN BDRY. ROAD K0086 + 928 K0087 + 447, K0087 + 947.50 K0088 + 800 | Region IV-A | Laguna 3rd DEO | Completed | ₱38.2M | 100% | Medium risk47 | —-0.107 |
| 58 | 18DP0030NETWORK DEVELOPMENT PROGRAM OFF CARRIAGEWAY IMPROVEMENT OF PRIMARY ROADS ALONG SAN PABLO-CALAUAN RD. K0079 + 358 K0079 + 500, K0079 + 558 K0080 + 476, K0080 + 500 K0080 + 535, K0081 + 000 K0081 + 095 | Region IV-A | Laguna 3rd DEO | Completed | ₱38.6M | 100% | Medium risk47 | —-0.108 |
| 59 | 21DP0068LOCAL PROGRAM - CONSTRUCTION OF ROAD LEADING TO PANDIN LAKE, BARANGAY STO. ANGEL, SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱34.3M | 100% | Medium risk47 | —-0.108 |
| 60 | 22DP0033NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS - SN PABLO-RIZAL-NAGCARLAN-LILIW RD - K0083 + 000 - K0083 + 637 | Region IV-A | Laguna 3rd DEO | Completed | ₱36.2M | 100% | Medium risk47 | —-0.108 |
| 61 | 18DP0034NETWORK DEVELOPMENT PROGRAM ROAD WIDENING OF PRIMARY ROADS ALONG DAANG MAHARLIKA K0089 + 490 K0091 + 388 | Region IV-A | Laguna 3rd DEO | Completed | ₱29M | 100% | Medium risk47 | —-0.109 |
| 62 | 24DP0029BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - RIZAL BR. (B03142LZ) ALONG SN PABLO-RIZAL-NAGCARLAN-LILIW RD | Region IV-A | Laguna 3rd DEO | Completed | ₱9.9M | 100% | Medium risk47 | —-0.065 |
| 63 | 24DP0051BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - NALHU BR. (B02754LZ) ALONG SN PABLO-DOLORES RD | Region IV-A | Laguna 3rd DEO | Completed | ₱7.3M | 100% | Medium risk47 | —-0.066 |
| 64 | 22DP0046BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - PRIMARY ROADS - MSR BR. (B02498LZ) ALONG MSR PASSING POBLACION RD | Region IV-A | Laguna 3rd DEO | Completed | ₱9.8M | 100% | Medium risk47 | —-0.068 |
| 65 | 22DP0035BASIC INFRASTRUCTURE PROGRAM - CONSTRUCTION OF BRIDGE IN BARANGAY SAN VICENTE, SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱12.4M | 100% | Medium risk47 | —-0.069 |
| 66 | 22DP0040BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - PRIMARY ROADS - BALATUIN BR. (B02876LZ) ALONG DAANG MAHARLIKA (LZ) | Region IV-A | Laguna 3rd DEO | Completed | ₱11.8M | 100% | Medium risk47 | —-0.069 |
| 67 | 18DP0026BRIDGE PROGRAM WIDENING OF PERMANENT BRIDGES KASAY-AN BR. (B02753LZ) ALONG SAN PABLO-DOLORES RD. | Region IV-A | Laguna 3rd DEO | Completed | ₱14M | 100% | Medium risk47 | —-0.069 |
| 68 | 22DP0020CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - REPAIR/ REHABILITATION OF SN PABLO-RIZAL-NAGCARLAN-LILIW RD - K0101 + 000 - K0103 + 033 | Region IV-A | Laguna 3rd DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.103 |
| 69 | 25DO0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY AMPID - 2, SAN MATEO, RIZAL | Region IV-A | Rizal 2nd DEO | On-Going | ₱4.8M | 0% | Medium risk47 | —-0.044 |
| 70 | 25DO0066CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY AMPID I, SAN MATEO, RIZAL | Region IV-A | Rizal 2nd DEO | On-Going | ₱4.8M | 52% | Medium risk47 | —-0.062 |
| 71 | 20DI0039OFF - CARRIAGEWAY IMPROVEMENT - PRIMARY ROADS - MANILA SOUTH RD. - K0047 + 000 - K0047 + 801 | Region IV-A | Laguna 2nd DEO | Completed | ₱27.9M | 100% | Medium risk47 | —-0.106 |
| 72 | 24DO0108CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROAD/S AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES - CONSTRUCTION OF ROAD IN BARANGAY STA. ANA, SAN MATEO RIZAL | Region IV-A | Rizal 2nd DEO | On-Going | ₱4.8M | 72% | Medium risk47 | —-0.062 |
| 73 | 23DP0047CSSP - BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONCRETING OF ROAD OF BRGY. MARAVILLA, NAGCARLAN, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.108 |
| 74 | 25DO0040CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE OF LANATIN RIVER BA | Region IV-A | Rizal 2nd DEO | On-Going | ₱4.9M | 100% | Medium risk46 | —-0.056 |
| 75 | 20DP0044NETWORK DEVELOPMENT - ROAD WIDENING PRIMARY ROADS - CALAMBA-STA CRUZ-FAMY JCT RD - K0076 + 288 - K0076 + 564 | Region IV-A | Laguna 3rd DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.109 |