Contractor dossier
338 projects on file, including joint ventures this contractor is part of.
Total projects
338
Total budget
₱8.9B
Average progress
89.7%
Completion rate
68.3%
Below 70%
Average risk score
54.5
Medium risk on average, out of 100
Flagged as unusual
32
9.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 338 | ₱8.9B | 54.5 | 32 | 89.7% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 152 | ₱2.8B | 52.8 | 15 | 92.7% |
| Flood Control and Drainage | 113 | ₱5.3B | 64.1 | 5 | 93.1% |
| Buildings and Facilities | 56 | ₱167.9M | 37.1 | 3 | 79.9% |
| GAA 2025 SSP | 5 | ₱94.3M | 96.1 | 5 | 39.0% |
| Water Provision and Storage | 4 | ₱14.9M | 31.4 | 0 | 100.0% |
| Bridges | 3 | ₱164.4M | 40.5 | 1 | 92.6% |
| GAA 2025 OO-2 | 2 | ₱194.8M | 89.1 | 2 | 31.6% |
| OTHER | 2 | ₱59.1M | 75.3 | 1 | 100.0% |
| Bridges, Roads | 1 | ₱3.7M | 33.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AB0154BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MAGNUANG, BATAC CITY ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.8M | 34% | High risk96 | Flagged0.036 |
| 25AB0030BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY QUILLING NORTE, BATAC CITY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 29% | High risk96 | Flagged0.037 |
| 25AB0106BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, MARIANO MARCOS STATE UNIVERSITY - BATAC CAMPUS, CITY OF BATAC, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱48M | 42% | High risk96 | Flagged0.035 |
| 25AB0118BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (BALAY ALUMNI), MARIANO MARCOS STATE UNIVERSITY - BATAC CAMPUS, CITY OF BATAC, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱28.8M | 43% | High risk96 | Flagged0.034 |
| 25AB0113BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ACCESS ROAD LEADING TO GAMABAMAGDALENA GAMAYO PINILI INABEL CENTER, BRGY. LUMBAAN TO SITIO BICBICA, PINILI, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱7.7M | 47% | High risk96 | Flagged0.032 |
| 25A00120CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SRIP AND ITS APPURTENANT STRUCTURE, CABANGARAN SRIP, BARANGAY CABANGARAN, VINTAR, ILOCOS NORTE | Region I | Region I | On-Going | ₱149.6M | 22% | High risk91 | Flagged0.034 |
| 25A00517CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GARASGAS CREEK, BARANGAY QUILING NORTE, BATAC CITY, ILOCOS NORTE | Region I | Region I | On-Going | ₱45.2M | 41% | High risk87 | Flagged0.013 |
| 25AA0453CONVERGENCE AND SPEC SUP PROG - SUSTAINABLE INFRA PROJ ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES - REHABILITATION OF RD, BRGY SAN JOSE AND BRGY STO. TOMAS, VINTAR, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 60% | High risk81 | —-0.009 |
| 25AA0321CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BR FROM THE NATL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF RD, SITIO HACIENDA, BARANGAY 26 CANAAM, VINTAR, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 99% | High risk80 | —-0.025 |
| 25AA0116FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF FLOOD CONTROL STRUCTURE, BARANGAY SAN NICOLAS, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 34% | High risk78 | Flagged0.008 |
| 25AA0114FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF FLOOD CONTROL STRUCTURE, BARANGAY ALSEM, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 33% | High risk78 | Flagged0.009 |
| 25AA0086FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BENGCAG-ZAMBOANGA, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 73% | High risk78 | —-0.024 |
| 24AA0354SIPAG- ACCESSROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADINGTO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -REHABILITATION OF ROAD, SITIO TAGUIPURO, BARANGAYTANGAOAN, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 87% | High risk78 | —-0.039 |
| 24AA0207SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF INTEGRATED CANAL SYSTEM, BARANGAY 24, NUESTRA SENIORA DE CONSOLACION, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 87% | High risk78 | —-0.021 |
| 25AA0508SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, BARANGAY 29 PASNGAL, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 100% | High risk77 | —-0.038 |
| 24AA0157SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD BARANGAY PUNGTO, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 99% | High risk77 | —-0.041 |
| 24AA0172SIPAG - ACCESSROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADINGTO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES -IMPROVEMENT OF ROAD, BARANGAY MARGAAY, VINTAR, ILOCOSNORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 100% | High risk77 | —-0.043 |
| 24AA0388BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES: CONSTRUCTION OF MULTI PURPOSE BUILDING, ( COVERED COURT ) PARPAROROC ELEMENTARY SCHOOL, BARANGAY #10, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 41% | High risk77 | —-0.017 |
| 23AA0441CONCRETING OF BRGY. CALAMBEG TO BRGY. ANAO FMR, BRGY. CALAMBEG AND BRGY. ANAO, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱23.9M | 95% | High risk76 | Flagged0.022 |
| 23AA0410CONCRETING OF BRGY. 49-A DARAYDAY FMR, BRGY. DARAYDAY, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱29M | 52% | High risk76 | Flagged0.038 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23AA0410CONCRETING OF BRGY. 49-A DARAYDAY FMR, BRGY. DARAYDAY, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱29M | 52% | High risk76 | Flagged0.038 |
| 25AB0030BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY QUILLING NORTE, BATAC CITY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 29% | High risk96 | Flagged0.037 |
| 25AB0154BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MAGNUANG, BATAC CITY ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.8M | 34% | High risk96 | Flagged0.036 |
| 25AB0106BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, MARIANO MARCOS STATE UNIVERSITY - BATAC CAMPUS, CITY OF BATAC, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱48M | 42% | High risk96 | Flagged0.035 |
| 25AB0118BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (BALAY ALUMNI), MARIANO MARCOS STATE UNIVERSITY - BATAC CAMPUS, CITY OF BATAC, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱28.8M | 43% | High risk96 | Flagged0.034 |
| 25A00120CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SRIP AND ITS APPURTENANT STRUCTURE, CABANGARAN SRIP, BARANGAY CABANGARAN, VINTAR, ILOCOS NORTE | Region I | Region I | On-Going | ₱149.6M | 22% | High risk91 | Flagged0.034 |
| 25AB0113BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ACCESS ROAD LEADING TO GAMABAMAGDALENA GAMAYO PINILI INABEL CENTER, BRGY. LUMBAAN TO SITIO BICBICA, PINILI, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱7.7M | 47% | High risk96 | Flagged0.032 |
| 23AA0419CONCRETING OF SITIO 5, BRGY. 52-B, LATAAG FMR, BRGY. 52-B, LATAAG, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱14.6M | 50% | High risk76 | Flagged0.030 |
| 24AB0057'CONCRETING OF BRGY. BALIGAT - BRGY. BAAY FMR, BRGY. BALIGAT AND BRGY. BAAY, BATAC CITY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱14.9M | 50% | Medium risk56 | Flagged0.027 |
| 23AA0487CONSTRUCTION OF FLOOD MITIGATING STRUCTURE ALONG LAOAG RIVER BASIN, BRGY. SUYO, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱47.7M | 100% | High risk76 | Flagged0.026 |
| 23AA0415CONCRETING OF BRGY. CALAYAB FMR, BRGY. CALAYAB, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.5M | 90% | High risk71 | Flagged0.025 |
| 24A00339CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LAOAG-SAN NICOLAS BYPASS ROAD (LAOAG CITY-BACARRA SECTION), ILOCOS NORTE (PACKAGE B) | Region I | Region I | On-Going | ₱193M | 59% | High risk74 | Flagged0.024 |
| 23AA0445CONCRETING OF BRGY. SUCSUQUEN FMR, BRGY. SUCSUQUEN, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱11.9M | 80% | High risk74 | Flagged0.023 |
| 23AA0441CONCRETING OF BRGY. CALAMBEG TO BRGY. ANAO FMR, BRGY. CALAMBEG AND BRGY. ANAO, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱23.9M | 95% | High risk76 | Flagged0.022 |
| 23AA0426CONCRETING OF BRGY. LIBTONG FMR, BRGY. LIBTONG, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.6M | 93% | High risk73 | Flagged0.022 |
| 23AB0173CONCRETING OF BILLOCA FISH FARM, BRGY. BILLOCA FMR, BRGY. BILLOCA, BATAC CITY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱11.3M | 98% | Medium risk51 | Flagged0.020 |
| 23AA0456CONCRETING OF ALEJO MALASIG FMR, BRGY. ALEJO MALASIG, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.6M | 99% | High risk73 | Flagged0.018 |
| 23AA0457CONCRETING OF BRGY. ESTER FMR, BRGY. ESTER, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.6M | 98% | High risk73 | Flagged0.018 |
| 23AA0455CONCRETING OF BRGY. PARUT FMR, BRGY. PARUT, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.7M | 99% | High risk73 | Flagged0.018 |
| 23AA0443CONCRETING OF BRGY. MANGITAYAG FMR, BRGY. MANGITAYAG, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱11.9M | 100% | High risk74 | Flagged0.017 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 25A00518SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF SWIP, BARANGAY CAMANDINGAN, CITY OF BATAC, ILOCOS NORTE | Region I | Region I | On-Going | ₱112.3M | 0% | High risk66 | Flagged0.009 |
| 152 | 24A00228CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER, BARANGAY MABALENG, BATAC CITY, ILOCOS NORTE | Region I | Region I | On-Going | ₱122.7M | 75% | High risk65 | —-0.003 |
| 153 | 25AB0132BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MAGNUANG, CITY OF BATAC, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.8M | 0% | High risk65 | —-0.009 |
| 154 | 23A00261CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BONGO RIVER, BRGY. MADAMBA, ALBANO AND GUERRERO, DINGRAS, ILOCOS NORTE | Region I | Region I | Completed | ₱38.6M | 100% | High risk64 | —-0.065 |
| 155 | 24A00287CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF QUIAOIT RIVER DIVERSION CANAL, BATAC CITY, ILOCOS NORTE | Region I | Region I | Completed | ₱115.8M | 100% | High risk64 | —-0.046 |
| 156 | 22AB0054CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY RAYURAY, BATAC CITY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱4.9M | 100% | High risk62 | —-0.081 |
| 157 | 25AB0123BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (COLLEGE OF DENTISTRY), MARIANO MARCOS STATE UNIVERSITY - BATAC CAMPUS, CITY OF BATAC, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱23.8M | 16% | High risk61 | —-0.015 |
| 158 | 25AB0139BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITIES (TENNIS COURTS), MARIANO MARCOS STATE UNIVERSITY - BATAC CAMPUS, CITY OF BATAC, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱9.6M | 0% | High risk61 | —-0.008 |
| 159 | 24AB0072CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. DARIWDIW, BATAC CITY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱4.9M | 100% | High risk61 | —-0.079 |
| 160 | 25AB0021BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY NALUPTA, CITY OF BATAC, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 38% | High risk61 | —-0.022 |
| 161 | 21AB0099LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION OF MULTI-PURPOSE FACILITY, BARANGAY 10-E BOAO EAST AND BARANGAY 30-W BOAO WEST, BATAC CITY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱5.6M | 100% | High risk61 | —-0.082 |
| 162 | 24AB0030CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY NALASIN, PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱5.9M | 93% | High risk61 | —-0.033 |
| 163 | 24AB0068CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY ACOSTA, BATAC CITY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 54% | Medium risk60 | —-0.023 |
| 164 | 24AB0076CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BRGY. PAYAO, BATAC CITY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱4.9M | 100% | Medium risk59 | —-0.083 |
| 165 | 24AB0070CONSTRUCTION OF MULTI-PURPOSE BUILDING (SCHOOL BUILDINGS/CLASSROOMS) IN PETRA Q. PIMENTEL ELEMENTARY SCHOOL IN BARANGAY PIMENTEL, CITY OF BATAC, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 84% | Medium risk57 | —-0.035 |
| 166 | 22A00173CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER (PHASE I), BRGY. MABALENG, BATAC CITY, ILOCOS NORTE | Region I | Region I | Completed | ₱77.2M | 100% | Medium risk57 | —-0.057 |
| 167 | 23A00394REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS, BATAC-PINILI VIA MAIPALIG RD - K0478+647 - K0478+794 | Region I | Region I | Completed | ₱96.5M | 100% | Medium risk57 | —-0.070 |
| 168 | 24AB0057'CONCRETING OF BRGY. BALIGAT - BRGY. BAAY FMR, BRGY. BALIGAT AND BRGY. BAAY, BATAC CITY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱14.9M | 50% | Medium risk56 | Flagged0.027 |
| 169 | 24AB0058CONCRETING OF SITIO LOPEZ, BRGY. BALIGAT FMR, BRGY. BALIGAT, BATAC CITY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱14.9M | 100% | Medium risk56 | —-0.027 |
| 170 | 18AB0102REPAIR/MAINTENANCE OF DAMAGED (SCOURED & ERODED ) BANK PROTECTION ALONG BONGO RIVER, BRGY. ALBANO, DINGRAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱36.3M | 100% | Medium risk56 | —-0.065 |
| 171 | 19A00004CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF QUIAOIT RIVER DIVERSION CANAL , BATAC CITY, ILOCOS NORTE | Region I | Region I | Completed | ₱91.3M | 100% | Medium risk55 | —-0.052 |
| 172 | 19AB0077CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG BONGO RIVER, BRGY. ALBANO-BRGY. DANCEL, DINGRAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱29.4M | 100% | Medium risk55 | —-0.062 |
| 173 | 22A00174CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER (PHASE II), BRGY. MABALENG, BATAC CITY, ILOCOS NORTE | Region I | Region I | Completed | ₱77.2M | 100% | Medium risk54 | —-0.057 |
| 174 | 19AB0047COMPLETION OF ROAD LEADING TO DARIWDIW SMALL WATER IMPOUNDING DAM, BRGY. DARIWDIW, BATAC CITY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱8.8M | 100% | Medium risk54 | —-0.085 |
| 175 | 21A00184CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS ALONG GARASGAS CREEK, BARANGAY QUILING NORTE, BATAC CITY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱48.2M | 100% | Medium risk54 | —-0.065 |