114 projects on file, including joint ventures this contractor is part of.
Total projects
114
Total budget
₱5.7B
Average progress
92.0%
Completion rate
66.7%
Below 70%
Average risk score
55.5
Medium risk on average, out of 100
Flagged as unusual
19
16.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 95 | ₱4.9B | 56.7 | 18 | 90.5% |
| Region XIII | 9 | ₱309.6M | 51.3 | 1 | 99.9% |
| National Capital Region | 7 | ₱350.6M | 48.9 | 0 | 100.0% |
| Region V | 3 | ₱100.1M | 45.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 48 | ₱2.3B | 49.4 | 1 | 95.0% |
| Roads | 34 | ₱1.6B | 48.3 | 0 | 96.8% |
| OTHER | 11 | ₱670.2M | 80.1 | 8 | 99.2% |
| Buildings and Facilities | 10 | ₱122.2M | 39.8 | 0 | 93.5% |
| GAA 2025 OO-1 | 5 | ₱414.4M | 94.4 | 5 | 49.1% |
| GAA 2025 OO-2 | 5 | ₱462.3M | 92.8 | 4 | 70.9% |
| GAA 2025 SSP | 1 | ₱94.6M | 96.7 | 1 | 15.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BD0120SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF TUGUEGARAO CIRCUMFERENTIAL ROAD DIKE, PACKAGE 2, TUGUEGARAO CITY, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱94.6M | 16% | High risk97 | Flagged0.045 |
| 25BD0021OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - PEÑABLANCA-CALLAO CAVE RD - K0479 + (-093.10) - K0479 + 000 | Region II | Cagayan 3rd DEO | On-Going | ₱96.4M | 47% | High risk95 | Flagged0.019 |
| 25BD0022OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - PEÑABLANCA-CALLAO CAVE RD - K0479 + (-186.20) - K0479 + (-093.10) | Region II | Cagayan 3rd DEO | On-Going | ₱96.4M | 47% | High risk95 | Flagged0.019 |
| 25BD0023OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - PEÑABLANCA - CALLAO CAVE RD - K0476+408.10 - K0476+501.20 | Region II | Cagayan 3rd DEO | On-Going | ₱96.4M | 47% | High risk95 | Flagged0.019 |
| 25BD0024OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - PEÑABLANCA - CALLAO CAVE RD - K0480 + 300 - K0480 + 393.10 | Region II | Cagayan 3rd DEO | On-Going | ₱86.7M | 49% | High risk94 | Flagged0.017 |
| 25BD0003OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONST./ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY SAN ISIDRO, IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱96.3M | 100% | High risk93 | —-0.003 |
| 25BD0009OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY ALIBAGO, ENRILE, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱96.3M | 61% | High risk93 | Flagged0.010 |
| 25BD0010OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- CONSTRUCTION/ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY PATA, ENRILE, CAGAYAN (DOWNSTREAM) | Region II | Cagayan 3rd DEO | On-Going | ₱96.3M | 57% | High risk93 | Flagged0.009 |
| 25BD0011ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TUGUEGARAO CITY-ENRILE DIVERSION ROAD, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱38.5M | 55% | High risk93 | Flagged0.008 |
| 25BD0007OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY DUGAYUNG, AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱96.3M | 90% | High risk92 | Flagged0.000 |
| 25B00010OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TUGUEGARAO CIRCUMFERENTIAL DIKE ROAD, PHASE 3, TUGUEGARAO CITY, CAGAYAN | Region II | Region II | On-Going | ₱77.1M | 46% | High risk92 | Flagged0.008 |
| 18BD0119CONCRETING OF BRGY. ANNAFATAN-BRGY. PALAYAG FMR, BRGY. ANNAFATAN AND BRGY. PALAYAG, AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱4.8M | 100% | High risk86 | Flagged0.014 |
| 24BD0055ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - PEÑABLANCA- CALLAO CAVE RD - K0482+600 - K0482+692 | Region II | Cagayan 3rd DEO | On-Going | ₱96.5M | 100% | High risk84 | Flagged0.014 |
| 24BD0057OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS- PEÑABLANCA - CALLAO CAVE RD - K0479+898 - K480+024 | Region II | Cagayan 3rd DEO | On-Going | ₱86.9M | 100% | High risk82 | Flagged0.010 |
| 24BD0061OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - PEÑABLANCA-CALLAO CAVE RD - K0479+325.47 - K0479+401 | Region II | Cagayan 3rd DEO | On-Going | ₱82.2M | 100% | High risk82 | Flagged0.010 |
| 24BD0062ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS- PEÑABLANCA - CALLAO CAVE RD - K0480+200 - K0480+300 | Region II | Cagayan 3rd DEO | On-Going | ₱81.6M | 100% | High risk82 | Flagged0.010 |
| 24BD0060001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHAB./ RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS-PEÑABLANCA - CALLAO CAVE RD - K0478+(-260) - K478+(-287), K0483+000 - K0483+(-068) | Region II | Cagayan 3rd DEO | On-Going | ₱82.8M | 100% | High risk82 | Flagged0.010 |
| 23NE0068REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG DINAGAT- LORETO RD.-K0072+428.30-K0072+758.61, K0073+672.60-K0073+900.00 TUBAJON, DINAGAT ISLANDS | Region XIII | Dinagat Islands DEO | On-Going | ₱94.6M | 99% | High risk80 | Flagged0.014 |
| 24BD0073OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CAGAYAN RIVER FLOOD MANAGEMENT PROJECTS, BACCUIT, AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱34.2M | 92% | High risk79 | Flagged0.010 |
| 24BD0072OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CAGAYAN RIVER FLOOD MANAGEMENT PROJECT, AJAT, IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱34.3M | 100% | High risk79 | —-0.023 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BD0120SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF TUGUEGARAO CIRCUMFERENTIAL ROAD DIKE, PACKAGE 2, TUGUEGARAO CITY, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱94.6M | 16% | High risk97 | Flagged0.045 |
| 25BD0021OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - PEÑABLANCA-CALLAO CAVE RD - K0479 + (-093.10) - K0479 + 000 | Region II | Cagayan 3rd DEO | On-Going | ₱96.4M | 47% | High risk95 | Flagged0.019 |
| 25BD0022OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - PEÑABLANCA-CALLAO CAVE RD - K0479 + (-186.20) - K0479 + (-093.10) | Region II | Cagayan 3rd DEO | On-Going | ₱96.4M | 47% | High risk95 | Flagged0.019 |
| 25BD0023OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - PEÑABLANCA - CALLAO CAVE RD - K0476+408.10 - K0476+501.20 | Region II | Cagayan 3rd DEO | On-Going | ₱96.4M | 47% | High risk95 | Flagged0.019 |
| 25BD0024OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - PEÑABLANCA - CALLAO CAVE RD - K0480 + 300 - K0480 + 393.10 | Region II | Cagayan 3rd DEO | On-Going | ₱86.7M | 49% | High risk94 | Flagged0.017 |
| 24BD0055ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - PEÑABLANCA- CALLAO CAVE RD - K0482+600 - K0482+692 | Region II | Cagayan 3rd DEO | On-Going | ₱96.5M | 100% | High risk84 | Flagged0.014 |
| 18BD0119CONCRETING OF BRGY. ANNAFATAN-BRGY. PALAYAG FMR, BRGY. ANNAFATAN AND BRGY. PALAYAG, AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱4.8M | 100% | High risk86 | Flagged0.014 |
| 23NE0068REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG DINAGAT- LORETO RD.-K0072+428.30-K0072+758.61, K0073+672.60-K0073+900.00 TUBAJON, DINAGAT ISLANDS | Region XIII | Dinagat Islands DEO | On-Going | ₱94.6M | 99% | High risk80 | Flagged0.014 |
| 25BD0017OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY PATA, ENRILE, CAGAYAN (UPSTREAM) | Region II | Cagayan 3rd DEO | On-Going | ₱96.1M | 26% | High risk77 | Flagged0.013 |
| 24BD0073OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CAGAYAN RIVER FLOOD MANAGEMENT PROJECTS, BACCUIT, AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱34.2M | 92% | High risk79 | Flagged0.010 |
| 24BD0057OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS- PEÑABLANCA - CALLAO CAVE RD - K0479+898 - K480+024 | Region II | Cagayan 3rd DEO | On-Going | ₱86.9M | 100% | High risk82 | Flagged0.010 |
| 25BD0009OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY ALIBAGO, ENRILE, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱96.3M | 61% | High risk93 | Flagged0.010 |
| 24BD0061OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - PEÑABLANCA-CALLAO CAVE RD - K0479+325.47 - K0479+401 | Region II | Cagayan 3rd DEO | On-Going | ₱82.2M | 100% | High risk82 | Flagged0.010 |
| 24BD0062ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS- PEÑABLANCA - CALLAO CAVE RD - K0480+200 - K0480+300 | Region II | Cagayan 3rd DEO | On-Going | ₱81.6M | 100% | High risk82 | Flagged0.010 |
| 24BD0060001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHAB./ RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS-PEÑABLANCA - CALLAO CAVE RD - K0478+(-260) - K478+(-287), K0483+000 - K0483+(-068) | Region II | Cagayan 3rd DEO | On-Going | ₱82.8M | 100% | High risk82 | Flagged0.010 |
| 25BD0010OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- CONSTRUCTION/ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY PATA, ENRILE, CAGAYAN (DOWNSTREAM) | Region II | Cagayan 3rd DEO | On-Going | ₱96.3M | 57% | High risk93 | Flagged0.009 |
| 25B00010OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TUGUEGARAO CIRCUMFERENTIAL DIKE ROAD, PHASE 3, TUGUEGARAO CITY, CAGAYAN | Region II | Region II | On-Going | ₱77.1M | 46% | High risk92 | Flagged0.008 |
| 25BD0011ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TUGUEGARAO CITY-ENRILE DIVERSION ROAD, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱38.5M | 55% | High risk93 | Flagged0.008 |
| 25BD0007OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY DUGAYUNG, AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱96.3M | 90% | High risk92 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 24BD0001ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - IGUIG BYPASS ROAD, PHASE V, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱22.1M | 100% | Medium risk48 | —-0.049 |
| 77 | 24BD0101BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD MITIGATION FACILITIES, NAMABBALAN SUR, TUGUEGARAO CITY, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱19.7M | 100% | Medium risk48 | —-0.035 |
| 78 | 23BD0062ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - IGUIG BYPASS ROAD, PHASE IV, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱19.6M | 100% | Medium risk48 | —-0.080 |
| 79 | 21BD0094RESTORATION/REPAIR OF NATIONAL ROAD ALONG PEÑABLANCA CALLAO CAVE ROAD, BRGY. QUIBAL, PEÑABLANCA, CAGAYAN, K0487+300 - K0487+365 | Region II | Cagayan 3rd DEO | Completed | ₱28.6M | 100% | Medium risk48 | —-0.080 |
| 80 | 18BD0078REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIP, SLOPE COLLAPSE AND LANDSLIDE, TERTIARY ROADS, PENABLANCA CALLAO CAVE ROAD, K0476+560-K0476+650, K0477+470-K0477+600, | Region II | Cagayan 3rd DEO | Completed | ₱13.2M | 100% | Medium risk47 | —-0.083 |
| 81 | 24BD0070OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CAGAYAN RIVER FLOOD MANAGEMENT PROJECT, GAMMAD, IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱34.3M | 100% | Medium risk47 | —-0.066 |
| 82 | 19BD0103ENSURE SAFETY AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, AMULUNG BYPASS ROAD, AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱21.1M | 100% | Medium risk47 | —-0.075 |
| 83 | 22FN0033OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DIKE ALONG BATO LAKE, SAN VICENTE SECTION, BATO, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.088 |
| 84 | 22BC0146CSSP-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF STO. TOMAS FLOOD CONTROL ALONG ABULUG RIVER, STO. TOMAS, ABULUG, CAGAYAN-K14+662-K14+912 | Region II | Cagayan 2nd DEO | Completed | ₱52.6M | 100% | Medium risk47 | —-0.056 |
| 85 | 20BD0036ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, RECONSTRUCTION OF FLOOD CONTROL SY | Region II | Cagayan 3rd DEO | Completed | ₱29.1M | 100% | Medium risk47 | —-0.067 |
| 86 | 24BD0027OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - PINACANAUAN RIVER FLOOD MANAGEMENT PROJECTS, CABASAN, PEÑABLANCA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱34.3M | 100% | Medium risk47 | —-0.032 |
| 87 | 22BB0130CSSP - BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONST. OF FLOOD MITIGATION STRUCTURE - CONST OF FLD CONTROL STRUCTURE ALONG CAGAYAN RIVER, TUCALANA, LAL-LO, CAGAYAN, BRGY. TUCALANA, LAL-LO, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱49.4M | 100% | Medium risk47 | —-0.060 |
| 88 | 18BD0164REPAIR/MAINTENANCE OF FLOOD CONTROL STRUCTURE STA. 0+000 - STA. 0+089.6, PATA, ENRILE, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱18.4M | 100% | Medium risk47 | —-0.019 |
| 89 | 22BB0129CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONST. OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAGAYAN RIVER, BRGY. BAGUMBAYAN, LAL-LO, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱49.4M | 100% | Medium risk47 | —-0.060 |
| 90 | 22BB0019OO2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS - CONST./REHAB. OF FLD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS -CONSTRUCTION OF FLD MITIGATION STRUCTURE -CONSTRUCTION OF FLD CONTROL, TUEG, BITAG GRANDE, BAGGAO, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.065 |
| 91 | 21FN0019OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BARIT RIVER, DOWNSTREAM OF CAGAS BRIDGE, NABUA, CAMARINES SUR - STA. 0+1 | Region V | Camarines Sur 5th DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.088 |
| 92 | 21OA0029CONSTRUCTION OF RIVERWALL ALONG MALABON-TULLAHAN RIVER, BRGY. SAN AGUSTIN, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱41.6M | 100% | Medium risk46 | —-0.088 |
| 93 | 22BC0031OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF STA. ROSA FLOOD CONTROL ALONG ABULUG RIVER (STA. 3+133-STA. 3+333), ABULUG, CA | Region II | Cagayan 2nd DEO | Completed | ₱48.1M | 100% | Medium risk46 | —-0.060 |
| 94 | 22BB0013OO2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLDS-CONST./REHAB. OF FLD MITIGATN FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS- CONST. OF FLD MITIGATN STRUCTURE-CONST. OF FLD CTRL AT ZONE 1 ALONG NATIONAL RD OF BARANGAY BARSAT EAST, BAGGAO, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱49M | 100% | Medium risk46 | —-0.064 |
| 95 | 20OA0005CONST. OF RIVERWALL AND ROAD DIKE (PHASE 8) BRGY. DAMPALIT, MAL. CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱36M | 100% | Medium risk46 | —-0.085 |
| 96 | 18BD0127CONSTRUCTION OF THREE(3) STOREY TWELVE (12) CLASSROOM TWO (2) CLASSROOM SCIENCE LABORATORY/TWO (2) CLASSROOM ICT AND FOUR (4) CLASSROOM SHS BLDG., LEMU NATIONAL HIGH SCHOOL, ENRILE, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱27.2M | 100% | Medium risk45 | —-0.031 |
| 97 | 22BB0018OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST. OF FLOOD MITIGATION STRUCTURE - CONST. OF FLOOD CONTROL, ZONE 4 LASILAT, BAGGAO, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱34.3M | 100% | Medium risk45 | —-0.064 |
| 98 | 18BD0135CONSTRUCTION OF TWO (2) STOREY EIGHT (8) CLASSROOM TWO (2) CLASSROOM SCIENCE LABORATORY /TWO (2) CLASSROOM ICT, PEÑABLANCA EAST NATIONAL HIGH SCHOOL, PEÑABLANCA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱15.7M | 100% | Medium risk45 | —-0.032 |
| 99 | 18BD0132CONSTRUCTION OF TWO (2) EIGHT (8) CLASSROOM, GADU NATIONAL HIGH SCHOOL, NANGALISAN EXTENSION, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱15.2M | 100% | Medium risk44 | —-0.039 |
| 100 | 23FN0060CONCRETING OF BARANGAY ANTIPOLO FMR, BARANGAY ANTIPOLO, IRIGA CITY, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱11.9M | 100% | Medium risk43 | —-0.051 |