Opening the dossier…
Opening the dossier…
Contractor dossier
19 projects on file, including joint ventures this contractor is part of.
Total projects
19
Total budget
₱962.5M
Average progress
94.1%
Completion rate
84.2%
Average risk score
53.9
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 15 | ₱752.4M | 53.8 | 0 | 92.5% |
| Region I | 2 | ₱61.2M | 57.1 | 0 | 100.0% |
| Region III | 2 | ₱148.8M | 51.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 12 | ₱685.7M | 51.8 | 0 | 90.6% |
| Water Provision and Storage | 4 | ₱174.7M | 62.8 | 0 | 100.0% |
| Flood Control and Drainage | 2 | ₱87.3M | 45.6 | 0 | 100.0% |
| Roads | 1 | ₱14.8M | 60.3 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17P00076WATER SUPPLY AND SANITATION FOR POVERTY AREAS AND TOURISM PRIORITY SITES - CONSTRUCTION OF WATER SUPPLY IN CAR | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱95.9M | 100% | High risk72 | —-0.010 |
| 17A00056CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURES INCLUDING LOCAL PROJECTS, CONSTRUCTION OF WATER SUPPLY PROJECT, ROSARIO, LA UNION | Region I | Region I | Completed | ₱51.6M | 100% | High risk70 | —-0.015 |
| 17P00074CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTOR SYSTEM - WATER SUPPLY (DRILLING OF WATER SUPPLY SYSTEM WIYH WATER TANK) NBI-CAR COMPOUND, DPWH-CAR COMPOUND, DPWH SECRETARY'S COTTAGE, DPWH-WANGAL (AREA SHOP), DBM-CAR C | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱17.6M | 100% | High risk64 | —-0.026 |
| 17PD0042ASSET PRESERVATION OF NATIONAL ROADS-REHAB/RECONST. OF NATIONAL ROADS WITH SLIP, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY: REH/MAJOR REPAIR OF ROAD SLOPE PROTECTION STRUCTURE-WESTERNLINK CIRCUMFERENTIAL ROAD., KO247+485-KO247+616 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱14.8M | 100% | High risk60 | —-0.049 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 17P00076WATER SUPPLY AND SANITATION FOR POVERTY AREAS AND TOURISM PRIORITY SITES - CONSTRUCTION OF WATER SUPPLY IN CAR | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱95.9M | 100% | High risk72 | —-0.010 |
| 2 | 17A00056CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURES INCLUDING LOCAL PROJECTS, CONSTRUCTION OF WATER SUPPLY PROJECT, ROSARIO, LA UNION | Region I | Region I | Completed | ₱51.6M | 100% | High risk70 | —-0.015 |
| 3 | 17P00074CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTOR SYSTEM - WATER SUPPLY (DRILLING OF WATER SUPPLY SYSTEM WIYH WATER TANK) NBI-CAR COMPOUND, DPWH-CAR COMPOUND, DPWH SECRETARY'S COTTAGE, DPWH-WANGAL (AREA SHOP), DBM-CAR C | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱17.6M | 100% | High risk64 | —-0.026 |
| 4 | 17PD0042ASSET PRESERVATION OF NATIONAL ROADS-REHAB/RECONST. OF NATIONAL ROADS WITH SLIP, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY: REH/MAJOR REPAIR OF ROAD SLOPE PROTECTION STRUCTURE-WESTERNLINK CIRCUMFERENTIAL ROAD., KO247+485-KO247+616 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱14.8M | 100% | High risk60 | —-0.049 |
| 5 | 22P00135CONSTRUCTION OF DPWH REGIONAL OFFICE CAR OFFICE BUILDING, ENGINEER'S HILL, BAGUIO CITY | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱114.1M | 74% | Medium risk60 | —-0.008 |
| 6 | 21P00018LOCAL PROGRAM: NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF DPWH REGIONAL OFFICE CAR OFFICE BUILDING, ENGINEER'S HILL, BAGUIO CITY | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱111M | 100% | Medium risk60 | —-0.056 |
| 7 | 21CB0057CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF MARIVELES MENTAL WELLNESS AND GENERAL HOSPITAL, MARIVELES, BATAAN | Region III | Bataan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk55 | —-0.073 |
| 8 | 25P00008LOCAL PROGRAM: NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION (COMPLETION) OF DPWH REGIONAL OFFICE CAR OFFICE BUILDING, ENGINEER'S HILL, BAGUIO CITY | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱47.9M | 14% | Medium risk53 | —-0.012 |
| 9 | 23PD0060BASIC INFRASTRUCTURE PROGRAM-CONSTRUCTION OF MULTI-PURPOSE BUILDING (COMMUNITY CENTER), BRGY. HAPPY HOLLOW, BAGUIO CITY, BENGUET | Cordillera Administrative Region | Baguio City DEO | Completed | ₱49.5M | 100% | Medium risk52 | —-0.063 |
| 10 | 21P00120CONSTRUCTION OF THE DEPARTMENT OF BUDGET AND MANAGEMENT - REGIONAL OFFICE, CORDILLERA ADMINISTRATIVE REGION (DBM-ROCAR) | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱79.6M | 100% | Medium risk51 | —-0.019 |
| 11 | 24PD0055NATIONAL BUILDING PROGRAM-REHABILITATION OF JUSTICE HALL BUILDING, DEPARTMENT OF JUSTICE (DOJ), BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | Terminated | ₱33.4M | 100% | Medium risk50 | —-0.047 |
| 12 | 20P00046CONSTRUCTION/ REHABILITATION/ IMPROVEMENT OF FACILITIES FOR PERSONS WITH DISABILITIES (PWD) & ELDERLIES/ SENIOR CITIZENS INCLUDING GENDER RESPONSIVE FACILITIES | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱29M | 100% | Medium risk50 | —-0.076 |
| 13 | 21CB0048CONSTRUCTION OF MULTIPURPOSE BUILDING (WELLNESS CENTER BUILDING), MARIVELES MENTAL WELLNESS AND GENERAL HOSPITAL, MARIVELES, BATAAN | Region III | Bataan 2nd DEO | Completed | ₱52.3M | 100% | Medium risk48 | —-0.080 |
| 14 | 22PD0028SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-REHABILITATION OF MULTI-PURPOSE BUILDING, PFVR INCLUDING MLQ BUILDING, BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | Completed | ₱24.5M | 100% | Medium risk48 | —-0.074 |
| 15 | 20PD0100LOCAL INFRASTRUCTURE PROGRAM-RENOVATION OF PFVR BUILDING, DEPARTMENT OF EDUCATION DIVISION OFFICE, BRGY. MILITARY CUT-OFF, BAGUIO CITY, BENGUET | Cordillera Administrative Region | Baguio City DEO | Completed | ₱24.8M | 100% | Medium risk48 | —-0.077 |
| 16 | 19PD0031CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION/REHABILITATION OF FLOOD CONTROL MITIGATION FACILITIES/ DRAINAGE SYSTEM ALONG ASIN-GALLANO RIVER, BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.066 |
| 17 | 19PD0128CY2019 BASIC EDUCATIONAL FACILITIES FUND (BEFF) BATCH 1- CONSTRUCTION OF 4 STOREY 8 CLASSROOMS, DONA AURORA NATIONAL HIGH SCHOOL, AURORA HILL, BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | Completed | ₱23.2M | 100% | Medium risk45 | —-0.037 |
| 18 | 18PD0056FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES/DRAINAGE SYSTEM ALONG BGH FLYOVER TO ATHLETIC BOWL TO ROSE GARDEN, BURNHAM PARK, BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | Completed | ₱38.3M | 100% | Medium risk44 | —-0.065 |
| 19 | 23AF0097CONSTRUCTION OF SOLAR WATER SYSTEM, ARINGAY, LA UNION | Region I | La Union 2nd DEO | Completed | ₱9.6M | 100% | Medium risk44 | —-0.048 |