Opening the dossier…
Opening the dossier…
Contractor dossier
537 projects on file, including joint ventures this contractor is part of.
Total projects
537
Total budget
₱52.4B
Average progress
88.0%
Completion rate
49.0%
Below 70%
Average risk score
61.4
High risk on average, out of 100
Flagged as unusual
82
15.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 359 | ₱35.4B | 60.2 | 59 | 88.5% |
| Region IV-A | 80 | ₱8.4B | 65.4 | 12 | 84.0% |
| Region I | 61 | ₱4.7B | 60.9 | 6 | 92.3% |
| Region IV-B | 30 | ₱3.4B | 63.4 | 2 | 94.5% |
| Region II | 7 | ₱563.1M | 74.3 | 3 | 44.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 338 | ₱32.8B | 57.7 | 21 | 87.8% |
| Flood Control and Drainage | 146 | ₱14.6B | 61.8 | 22 | 92.5% |
| OTHER | 21 | ₱2.4B | 82.6 | 19 | 86.2% |
| GAA 2025 OO-1 | 14 | ₱1.3B | 90.9 | 9 | 73.9% |
| GAA 2025 SSP | 7 | ₱637.4M | 94.9 | 5 | 81.7% |
| Bridges | 7 | ₱411.6M | 54.3 | 2 | 63.1% |
| GAA 2025 OO-2 | 4 | ₱341.1M | 92.2 | 4 | 60.7% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BH0283CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR STREETLIGHTS ALONG JCT. IPIL-QUIRINO BDRY. RD., BARANGAY IPIL TO BARANGAY VILLA VICTORIA, SECTION 2, ECHAGUE, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱93.6M | 61% | High risk96 | Flagged0.029 |
| 25DK0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR STREETLIGHTS ALONG LUCENA-TAYABAS-LUCBAN-SAMPALOC-MAUBAN PORT ROAD, K0144+000-K0152+000 | Region IV-A | Quezon 1st DEO | On-Going | ₱96.8M | 55% | High risk96 | Flagged0.015 |
| 25DM0103ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0312+541 - K0316+000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 74% | High risk96 | Flagged0.002 |
| 25DM0111ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO- SN ANDRES-SN NARCISO RD - K0388+487 - K0391+184, K0395+000 - K0396+000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 89% | High risk96 | —-0.004 |
| 25DM0141ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - ABUYON-BUENAVISTA RD - K0256+000 - K0257+000, K0264+971 - K0267+506 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 89% | High risk96 | —-0.004 |
| 25DM0110ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - GUMACA-PITOGO- MULANAY-SN NARCISO RD - K0275+215 - K0278+189, K0280+000 - K0280+292 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 45% | High risk96 | Flagged0.008 |
| 25DM0105ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0319+500 - K0321+005, K0322+(-995) - K0323+000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 69% | High risk96 | Flagged0.004 |
| 25ED0109INSTALLATION OF STREET LIGHTS ALONG CALAPAN SOUTH ROAD K0007+400 -K0021+000, CALAPAN - NAUJAN, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱95.1M | 100% | High risk95 | —-0.008 |
| 25PA0046BASIC INFRASTRUCTURE PROGRAM (BIP)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, REHABILITATION OF ROAD, LA PAZ ROAD, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱92.3M | 95% | High risk95 | Flagged0.026 |
| 25D00280PREVENTIVE MAINTENANCE - SECONDARY ROADSLUCBAN BYPASS RD - K0127+126 - K0127+470, K0127+486 - K0128+277, K0128+317 - K0128+740 | Region IV-A | Region IV-A | On-Going | ₱148.6M | 69% | High risk95 | Flagged0.011 |
| 25ED0108INSTALLATION OF STREET LIGHTS ALONG CALAPAN SOUTH ROAD K0047+200 - K0060+800, SOCORRO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱96.5M | 81% | High risk95 | Flagged0.021 |
| 25DK0052CONVERGENCE AND SPECIAL SUPPORT PROGRAM SPECIAL ROAD FUND MOTOR VEHICLE USERS CHARGE (MVUC) AS PER RA 11239 INSTALLATION OF SOLAR STREETLIGHTS ALONG JCT LUCBAN-LUISIANA RD K0129 + (-308) - K0133 + 590 | Region IV-A | Quezon 1st DEO | On-Going | ₱66.6M | 80% | High risk94 | Flagged0.004 |
| 25P00025CONSTRUCTION OF MISSING LINKS/ NEW ROADS - BAGUIO-LA TRINIDAD-ITOGON-SABLAN-TUBA AND TUBLAY, POBLACION JCT.-BATUANG-CARANTES JCT-BALATOC JCT. (SECTION 6 OF BLISTT OUTER RING CIRCUMFERENTIAL ROAD), BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱52.3M | 1% | High risk94 | Flagged0.020 |
| 25PA0114ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS, ABRA-ILOCOS NORTE RD-K0432+000-K0435+000 | Cordillera Administrative Region | Abra DEO | On-Going | ₱91.3M | 95% | High risk94 | Flagged0.010 |
| 25AE0039PREVENTIVE MAINTENANCE - TERTIARY ROADS - SN FERNANDO - BAGULIN RD - K0283+000 - K0284+550 | Region I | La Union 1st DEO | On-Going | ₱47.3M | 78% | High risk93 | Flagged0.004 |
| 25P00021CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CHICO RIVER, PAPALID-PANGPANG, SAMOKI, BONTOC, MOUNTAIN PROVINCE | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 20% | High risk93 | Flagged0.020 |
| 25PM0012ORGANIZATIONAL OUTCOME 1 - ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS - AGUINALDO-NATONIN ROAD (PACKAGE A), MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱34.3M | 51% | High risk93 | Flagged0.007 |
| 25ED0149REHABILITATION OF ROAD, JUNCTION POBLACION - BARANGAY LOYAL, VICTORIA,ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱96.5M | 100% | High risk93 | —-0.008 |
| 25PA0040OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, BARANGAY SAN ANTONIO, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱91.7M | 77% | High risk92 | Flagged0.011 |
| 25PM0025ORGANIZATIONAL OUTCOME 2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIFFU RIVER, PALITOD, STA. 92+225 - STA. 92+799 AND STA. 94+366 - STA. 94+512, PARACELIS, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱62.7M | 69% | High risk92 | Flagged0.002 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24PA0197CONSTRUCTION OF CARDONA FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CARDONA, DOLORES, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138.9M | 96% | High risk90 | Flagged0.071 |
| 24PA0185CONSTRUCTION OF NAGUILLAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱139M | 95% | High risk90 | Flagged0.071 |
| 24PA0196CONSTRUCTION OF BULBULALA FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY BULBULALA, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138.2M | 95% | High risk90 | Flagged0.071 |
| 24PA0199CONSTRUCTION OF KAWITAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, DANGLAS, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138.9M | 95% | High risk90 | Flagged0.071 |
| 24PA0200CONSTRUCTION OF SOOT FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.8M | 95% | High risk90 | Flagged0.071 |
| 24PA0220CONSTRUCTION OF BLISS FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.6M | 95% | High risk90 | Flagged0.070 |
| 24PE0089CONSTRUCTION OF ROAD, AMBACUAG-ORING-LA TRINIDAD ROAD, SABLAN, BENGUET, PHASE 2 | Cordillera Administrative Region | Benguet 1st DEO | On-Going | ₱96.5M | 60% | High risk90 | Flagged0.066 |
| 24PA0194CONSTRUCTION OF POBLACION FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY POBLACION, LAGAYAN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.6M | 0% | High risk74 | Flagged0.066 |
| 24PA0187CONSTRUCTION OF CATACDEGAN VIEJO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CATACDEGAN VIEJO, MANABO, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138.8M | 21% | High risk74 | Flagged0.063 |
| 24PA0192CONSTRUCTION OF PANG-OT FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY PANG-OT, LAGAYAN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.6M | 23% | High risk74 | Flagged0.061 |
| 24PA0202CONSTRUCTION OF LIPCAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY LIPCAN, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138M | 40% | High risk75 | Flagged0.059 |
| 24PA0201CONSTRUCTION OF AGTANGAO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY AGTANGAO, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.7M | 47% | High risk75 | Flagged0.057 |
| 24PA0221CONSTRUCTION OF SAGAP FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY SAGAP, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.5M | 75% | High risk73 | Flagged0.051 |
| 23AA0454CONCRETING OF BRGY. SAN ANTONIO FMR, BRGY. SAN ANTONIO, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱23.9M | 0% | High risk76 | Flagged0.049 |
| 24PA0186CONSTRUCTION OF CALAO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CALAO, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.6M | 76% | High risk75 | Flagged0.047 |
| 24PA0191CONSTRUCTION OF MALIBCONG FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, MALIBCONG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138.8M | 80% | High risk74 | Flagged0.046 |
| 24PA0219CONSTRUCTION OF CULIONG FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CULIONG, SAN JUAN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138.9M | 85% | High risk76 | Flagged0.046 |
| 24PA0204CONSTRUCTION OF DAOIDAO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY DAOIDAO, SAN JUAN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.6M | 91% | High risk76 | Flagged0.046 |
| 24PA0195CONSTRUCTION OF AGUET FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY AGUET, LAGANGILANG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.6M | 91% | High risk75 | Flagged0.046 |
| 24PA0198CONSTRUCTION OF LACUB FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LACUB, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱136.2M | 80% | High risk75 | Flagged0.045 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 451 | 24P00009CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SICAPO RIVER CONTROL STRUCTURE, STA. 89+515 - STA. 89+950 (R/S)KABUGAO, APAYAO | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱48.3M | 96% | Medium risk51 | —-0.023 |
| 452 | 23PE0031CONSTRUCTION OF ROAD ALONG KENNON - ANTAMOK - MANGGA - AGPAY - ALANG, BARANGAY CAMP 3, TUBA - MT. ULAP - PHILEX ROAD, BARANGAY AMPUCAO, ITOGON, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱69.2M | 100% | Medium risk51 | —-0.074 |
| 453 | 22PA0329SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF ANGAD FLOOD CONTROL, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.046 |
| 454 | 23PF0011CONSTRUCTION OF PEGDEYTO - BAGUINGEY - PINALYOK ROAD, BARANGAY TOPDAC, ATOK, BENGUET | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱59.3M | 100% | Medium risk51 | —-0.081 |
| 455 | 24PE0054CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ARINGAY RIVER BASIN, MAIN STREAM (KAGALING RIVER SECTION), TUBA, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱84.9M | 100% | Medium risk51 | —-0.060 |
| 456 | 23PF0014PREVENTIVE MAINTENANCE - SECONDARY ROADS: BAGUIO-BONTOC RD - K0267+813 - K0269+112, K0281 + 438 - K0284 + 075 | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱57.9M | 100% | Medium risk51 | —-0.080 |
| 457 | 22PA0188REHABILITATION OF LAMUNAN-ABLEG ROAD (PHASE II), DAGUIOMAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱29.4M | 100% | Medium risk51 | —-0.083 |
| 458 | 25PA0137BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, REHABILITATION OF ROAD, LAGANGILANG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱45.7M | 0% | Medium risk51 | —-0.019 |
| 459 | 22PA0335SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF CORIBOT FLOOD CONTROL STRUCTURE, BARANGAY MUDENG, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.062 |
| 460 | 22PA0336SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF CORIBOT FLOOD CONTROL PHASE 2, MUDENG, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.062 |
| 461 | 23PE0016CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BAUANG RIVER, SECTION 1A (WANGAL), STA. 056+276 - STA. 057+526, WANGAL, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱77.2M | 100% | Medium risk51 | —-0.062 |
| 462 | 25PA0116REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA RD-K0480+214-K0480+232, K0480+354-K0480+399, K0481+892-K0481+920, K0483+010-K0483+050, K0487+285-K0487+345, K0488+084-K0488+099 | Cordillera Administrative Region | Abra DEO | On-Going | ₱6.1M | 0% | Medium risk51 | —-0.020 |
| 463 | 24PA0154CONCRETING OF DOGYOAN, BRGY. BAI FMR, BRGY. BAI, LAGAYAN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱14.2M | 100% | Medium risk51 | Flagged0.007 |
| 464 | 23PA0235SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF QUIRSODAN-BAQUERO ROAD, LICUAN-BAAY, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱43.4M | 93% | Medium risk51 | —-0.035 |
| 465 | 23PF0012CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGNO RIVER, BAOKNIT SECTION, STA. 9 + 928 - STA. 10 + 540 (R.S), STA. 9 + 945 - STA. 10 + 555 (L.S) BUGUIAS, BENGUET | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱72.3M | 100% | Medium risk51 | —-0.067 |
| 466 | 24A00461CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL RIVERBANK STRUCTURE ALONG INGALERA AND ALLIED RIVERS, PACKAGE 2, VILLASIS, PANGASINAN | Region I | Region I | Completed | ₱48.2M | 100% | Medium risk51 | —-0.070 |
| 467 | 22PA0339SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF ISIT FLOOD CONTROL, DOLORES, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.064 |
| 468 | 24PA0114OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ MAITENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF MALABBAGA FLOOD CONTROL STRUCTURE, MALABBAGA, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.064 |
| 469 | 25PA0128CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT), STO. TOMAS- LUBA ROAD CONNECTING STO. TOMAS MANABO TO LUBA IN SUPPORT TO THE PR | Cordillera Administrative Region | Abra DEO | On-Going | ₱11.5M | 0% | Medium risk50 | —-0.019 |
| 470 | 22PA0053BASIC INFRASTRUCTURE PROGRAM (BIP) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES CONSTRUCTION OF PULOT FLOOD CONTROL STRUCTURE (PHASE 2), BARANGAY PULOT, LAGAYAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49.5M | 100% | Medium risk50 | —-0.064 |
| 471 | 23AF0108CONST. OF FLOOD CONTROL STRUCTURES ALONG THE ARINGAY RIVER BASIN, TUBAO,LA UNION (PACKAGE 2), TUBAO, LA UNION | Region I | La Union 2nd DEO | Completed | ₱72.3M | 100% | Medium risk50 | —-0.064 |
| 472 | 25A00115BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ARINGAY RIVER BASIN, BARANGAY SAN SIMON EAST, ARINGAY, LA UNION | Region I | Region I | On-Going | ₱67.2M | 93% | Medium risk50 | —-0.033 |
| 473 | 22PA0185SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BANGBANGCAG, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱29M | 100% | Medium risk50 | —-0.066 |
| 474 | 25PA0144BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL ALONG ABRA RIVER IN BUCAY, ABRA, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱36.6M | 33% | Medium risk50 | —-0.016 |
| 475 | 23AF0076INSTALLATION OF ROAD SAFETY DEVICES ALONG ANDUYAN-SAN PASCUAL ROAD - CHAINAGE 000 - CHAINAGE 5600, BRGY. ANDUAYN-RIZAL, TUBAO, LA UNION | Region I | La Union 2nd DEO | Completed | ₱73.5M | 100% | Medium risk50 | —-0.081 |