Contractor dossier
537 projects on file, including joint ventures this contractor is part of.
Total projects
537
Total budget
₱52.4B
Average progress
88.0%
Completion rate
49.0%
Below 70%
Average risk score
61.4
High risk on average, out of 100
Flagged as unusual
82
15.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 359 | ₱35.4B | 60.2 | 59 | 88.5% |
| Region IV-A | 80 | ₱8.4B | 65.4 | 12 | 84.0% |
| Region I | 61 | ₱4.7B | 60.9 | 6 | 92.3% |
| Region IV-B | 30 | ₱3.4B | 63.4 | 2 | 94.5% |
| Region II | 7 | ₱563.1M | 74.3 | 3 | 44.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 338 | ₱32.8B | 57.7 | 21 | 87.8% |
| Flood Control and Drainage | 146 | ₱14.6B | 61.8 | 22 | 92.5% |
| OTHER | 21 | ₱2.4B | 82.6 | 19 | 86.2% |
| GAA 2025 OO-1 | 14 | ₱1.3B | 90.9 | 9 | 73.9% |
| GAA 2025 SSP | 7 | ₱637.4M | 94.9 | 5 | 81.7% |
| Bridges | 7 | ₱411.6M | 54.3 | 2 | 63.1% |
| GAA 2025 OO-2 | 4 | ₱341.1M | 92.2 | 4 | 60.7% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BH0283CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR STREETLIGHTS ALONG JCT. IPIL-QUIRINO BDRY. RD., BARANGAY IPIL TO BARANGAY VILLA VICTORIA, SECTION 2, ECHAGUE, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱93.6M | 61% | High risk96 | Flagged0.029 |
| 25DK0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR STREETLIGHTS ALONG LUCENA-TAYABAS-LUCBAN-SAMPALOC-MAUBAN PORT ROAD, K0144+000-K0152+000 | Region IV-A | Quezon 1st DEO | On-Going | ₱96.8M | 55% | High risk96 | Flagged0.015 |
| 25DM0103ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0312+541 - K0316+000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 74% | High risk96 | Flagged0.002 |
| 25DM0111ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO- SN ANDRES-SN NARCISO RD - K0388+487 - K0391+184, K0395+000 - K0396+000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 89% | High risk96 | —-0.004 |
| 25DM0141ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - ABUYON-BUENAVISTA RD - K0256+000 - K0257+000, K0264+971 - K0267+506 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 89% | High risk96 | —-0.004 |
| 25DM0110ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - GUMACA-PITOGO- MULANAY-SN NARCISO RD - K0275+215 - K0278+189, K0280+000 - K0280+292 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 45% | High risk96 | Flagged0.008 |
| 25DM0105ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0319+500 - K0321+005, K0322+(-995) - K0323+000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 69% | High risk96 | Flagged0.004 |
| 25ED0109INSTALLATION OF STREET LIGHTS ALONG CALAPAN SOUTH ROAD K0007+400 -K0021+000, CALAPAN - NAUJAN, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱95.1M | 100% | High risk95 | —-0.008 |
| 25PA0046BASIC INFRASTRUCTURE PROGRAM (BIP)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, REHABILITATION OF ROAD, LA PAZ ROAD, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱92.3M | 95% | High risk95 | Flagged0.026 |
| 25D00280PREVENTIVE MAINTENANCE - SECONDARY ROADSLUCBAN BYPASS RD - K0127+126 - K0127+470, K0127+486 - K0128+277, K0128+317 - K0128+740 | Region IV-A | Region IV-A | On-Going | ₱148.6M | 69% | High risk95 | Flagged0.011 |
| 25ED0108INSTALLATION OF STREET LIGHTS ALONG CALAPAN SOUTH ROAD K0047+200 - K0060+800, SOCORRO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱96.5M | 81% | High risk95 | Flagged0.021 |
| 25DK0052CONVERGENCE AND SPECIAL SUPPORT PROGRAM SPECIAL ROAD FUND MOTOR VEHICLE USERS CHARGE (MVUC) AS PER RA 11239 INSTALLATION OF SOLAR STREETLIGHTS ALONG JCT LUCBAN-LUISIANA RD K0129 + (-308) - K0133 + 590 | Region IV-A | Quezon 1st DEO | On-Going | ₱66.6M | 80% | High risk94 | Flagged0.004 |
| 25P00025CONSTRUCTION OF MISSING LINKS/ NEW ROADS - BAGUIO-LA TRINIDAD-ITOGON-SABLAN-TUBA AND TUBLAY, POBLACION JCT.-BATUANG-CARANTES JCT-BALATOC JCT. (SECTION 6 OF BLISTT OUTER RING CIRCUMFERENTIAL ROAD), BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱52.3M | 1% | High risk94 | Flagged0.020 |
| 25PA0114ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS, ABRA-ILOCOS NORTE RD-K0432+000-K0435+000 | Cordillera Administrative Region | Abra DEO | On-Going | ₱91.3M | 95% | High risk94 | Flagged0.010 |
| 25AE0039PREVENTIVE MAINTENANCE - TERTIARY ROADS - SN FERNANDO - BAGULIN RD - K0283+000 - K0284+550 | Region I | La Union 1st DEO | On-Going | ₱47.3M | 78% | High risk93 | Flagged0.004 |
| 25P00021CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CHICO RIVER, PAPALID-PANGPANG, SAMOKI, BONTOC, MOUNTAIN PROVINCE | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 20% | High risk93 | Flagged0.020 |
| 25PM0012ORGANIZATIONAL OUTCOME 1 - ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS - AGUINALDO-NATONIN ROAD (PACKAGE A), MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱34.3M | 51% | High risk93 | Flagged0.007 |
| 25ED0149REHABILITATION OF ROAD, JUNCTION POBLACION - BARANGAY LOYAL, VICTORIA,ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱96.5M | 100% | High risk93 | —-0.008 |
| 25PA0040OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, BARANGAY SAN ANTONIO, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱91.7M | 77% | High risk92 | Flagged0.011 |
| 25PM0025ORGANIZATIONAL OUTCOME 2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIFFU RIVER, PALITOD, STA. 92+225 - STA. 92+799 AND STA. 94+366 - STA. 94+512, PARACELIS, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱62.7M | 69% | High risk92 | Flagged0.002 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24PA0197CONSTRUCTION OF CARDONA FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CARDONA, DOLORES, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138.9M | 96% | High risk90 | Flagged0.071 |
| 24PA0185CONSTRUCTION OF NAGUILLAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱139M | 95% | High risk90 | Flagged0.071 |
| 24PA0196CONSTRUCTION OF BULBULALA FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY BULBULALA, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138.2M | 95% | High risk90 | Flagged0.071 |
| 24PA0199CONSTRUCTION OF KAWITAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, DANGLAS, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138.9M | 95% | High risk90 | Flagged0.071 |
| 24PA0200CONSTRUCTION OF SOOT FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.8M | 95% | High risk90 | Flagged0.071 |
| 24PA0220CONSTRUCTION OF BLISS FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.6M | 95% | High risk90 | Flagged0.070 |
| 24PE0089CONSTRUCTION OF ROAD, AMBACUAG-ORING-LA TRINIDAD ROAD, SABLAN, BENGUET, PHASE 2 | Cordillera Administrative Region | Benguet 1st DEO | On-Going | ₱96.5M | 60% | High risk90 | Flagged0.066 |
| 24PA0194CONSTRUCTION OF POBLACION FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY POBLACION, LAGAYAN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.6M | 0% | High risk74 | Flagged0.066 |
| 24PA0187CONSTRUCTION OF CATACDEGAN VIEJO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CATACDEGAN VIEJO, MANABO, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138.8M | 21% | High risk74 | Flagged0.063 |
| 24PA0192CONSTRUCTION OF PANG-OT FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY PANG-OT, LAGAYAN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.6M | 23% | High risk74 | Flagged0.061 |
| 24PA0202CONSTRUCTION OF LIPCAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY LIPCAN, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138M | 40% | High risk75 | Flagged0.059 |
| 24PA0201CONSTRUCTION OF AGTANGAO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY AGTANGAO, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.7M | 47% | High risk75 | Flagged0.057 |
| 24PA0221CONSTRUCTION OF SAGAP FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY SAGAP, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.5M | 75% | High risk73 | Flagged0.051 |
| 23AA0454CONCRETING OF BRGY. SAN ANTONIO FMR, BRGY. SAN ANTONIO, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱23.9M | 0% | High risk76 | Flagged0.049 |
| 24PA0186CONSTRUCTION OF CALAO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CALAO, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.6M | 76% | High risk75 | Flagged0.047 |
| 24PA0191CONSTRUCTION OF MALIBCONG FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, MALIBCONG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138.8M | 80% | High risk74 | Flagged0.046 |
| 24PA0219CONSTRUCTION OF CULIONG FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CULIONG, SAN JUAN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138.9M | 85% | High risk76 | Flagged0.046 |
| 24PA0204CONSTRUCTION OF DAOIDAO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY DAOIDAO, SAN JUAN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.6M | 91% | High risk76 | Flagged0.046 |
| 24PA0195CONSTRUCTION OF AGUET FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY AGUET, LAGANGILANG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.6M | 91% | High risk75 | Flagged0.046 |
| 24PA0198CONSTRUCTION OF LACUB FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LACUB, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱136.2M | 80% | High risk75 | Flagged0.045 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 476 | 23AF0093INSTALLATION OF ROAD SAFETY DEVICES ALONG MANILA NORTH ROAD, ROSARIO, LA UNION (PACKAGE 1), ROSARIO, LA UNION | Region I | La Union 2nd DEO | Completed | ₱72.3M | 100% | Medium risk50 | —-0.082 |
| 477 | 23AF0094INSTALLATION OF ROAD SAFETY DEVICES ALONG MANILA NORTH ROAD, ROSARIO, LA UNION (PACKAGE 2) ROSARIO, LA UNION | Region I | La Union 2nd DEO | Completed | ₱72.3M | 100% | Medium risk50 | —-0.084 |
| 478 | 25A00116BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ARINGAY RIVER BASIN, BARANGAY SAN SIMON WEST, ARINGAY, LA UNION | Region I | Region I | On-Going | ₱67.2M | 90% | Medium risk50 | —-0.032 |
| 479 | 23AF0105CONST. OF FLOOD CONTROL STRUCTURES ALONG THE ARINGAY RIVER BASIN, ARINGAY,LA UNION (PACKAGE 6), ARINGAY, LA UNION | Region I | La Union 2nd DEO | Completed | ₱72.3M | 100% | Medium risk50 | —-0.064 |
| 480 | 23AF0104CONST. OF FLOOD CONTROL STRUCTURES ALONG THE ARINGAY RIVER BASIN, ARINGAY,LA UNION (PACKAGE 5), ARINGAY, LA UNION | Region I | La Union 2nd DEO | Completed | ₱72.3M | 100% | Medium risk50 | —-0.064 |
| 481 | 23AF0106CONST. OF FLOOD CONTROL STRUCTURES ALONG THE ARINGAY RIVER BASIN, ARINGAY,LA UNION (PACKAGE 7), ARINGAY, LA UNION | Region I | La Union 2nd DEO | Completed | ₱72.3M | 100% | Medium risk50 | —-0.064 |
| 482 | 23PA0146OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, LAYUGAN, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱45.8M | 100% | Medium risk50 | —-0.019 |
| 483 | 22PA0249CONSTRUCTION OF BUGBOG-SANTA ROSA FLOOD CONTROL STRUCTURE (PHASE 2), BARANGAY BUGBOG-SANTA ROSA, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱29.7M | 100% | Medium risk50 | —-0.065 |
| 484 | 21PM0029CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - POBLACION-BANTAY-BURINGAL-ROAD IN SUPPORT OF BANANA, CACAO, CORN AND TOURISM INDUSTRIES, PARACELIS, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 2nd DEO | Completed | ₱50.8M | 100% | Medium risk49 | —-0.078 |
| 485 | 25ED0160REHABILITATION OF ROAD, POBLACION SOCORRO -BAYUIN, SOCORRO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱89.3M | 100% | Medium risk49 | —-0.059 |
| 486 | 21PM0008ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-PAVING OF UNPAVED ROADS - TERTIARY ROADS, JCT TALUBIN-BARLIG-NATONIN-PARACELIS-CALACCAD RD - K0434 + 545 - K0435 + 526 | Cordillera Administrative Region | Mountain Province 2nd DEO | Completed | ₱49.1M | 100% | Medium risk49 | —-0.079 |
| 487 | 25PE0036CONSTRUCTION OF ROAD ALONG TIVANG-BANTIC-OLING, BARANGAY DALUPIRIP AND SITIO DOMOLPOS, BARANGAY TINONGDAN, ITOGON BENGUET, PHASE 2 | Cordillera Administrative Region | Benguet 1st DEO | On-Going | ₱47.5M | 41% | Medium risk49 | —-0.041 |
| 488 | 23PE0026CONSTRUCTION OF MISSING LINKS/ NEW ROADS - ITOGON - DALUPIRIP - SAN NICOLAS ROAD, ITOGON, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱47M | 100% | Medium risk48 | —-0.083 |
| 489 | 25PE0037CONSTRUCTION OF ROAD ALONG TOMEJAW-PETICAN-DALUPIRIP, PHASE 1, BARANGAY TINONGDAN, ITOGON, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | On-Going | ₱48.2M | 0% | Medium risk48 | —-0.026 |
| 490 | 24PI0002CSSP - ROLL-IT, LUKIB - NAIGAWA - TAMOG-O - SUYO - PANAS ROAD IN SUPPORT OF AGRIBUSINESS INDUSTRY, BAUKO, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱49M | 100% | Medium risk48 | —-0.085 |
| 491 | 23PF0043REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS GOV. BADO DANGWA NATIONAL RD - K0287+070-K0287+130, KAPANGAN, BENGUET | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱48.9M | 100% | Medium risk48 | —-0.080 |
| 492 | 24A00165BASIC INFRASTRUCTURE PROGRAM (BIP), REHABILITATION OF FLOOD CONTROL STRUCTURE, ARINGAY RIVER BASIN, BARANGAY SAN ANTONIO, ARINGAY, LA UNION | Region I | Region I | Completed | ₱49.5M | 100% | Medium risk48 | —-0.067 |
| 493 | 25AF0016INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG MANILA NORTH ROAD - K0223+506 - K0232+402, STO. TOMAS, LA UNION | Region I | La Union 2nd DEO | Completed | ₱48.2M | 100% | Medium risk48 | —-0.084 |
| 494 | 24ED0086INSTALLATION OF ROADWAY LIGHTING STRUCTURES ALONG CALAPAN SOUTH ROAD - K0000+ 000 - K0007+400, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱74.5M | 100% | Medium risk48 | —-0.086 |
| 495 | 24ED0087INSTALLATION OF ROADWAY LIGHTING STRUCTURES ALONG CSR-JCT. MINAS RD. K0035+(-654) - K0042+000, VICTORIA, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱76.4M | 100% | Medium risk47 | —-0.086 |
| 496 | 25AI0090CONSTRUCTION OF RIVER EMBANKMENT AND SLOPE PROTECTION STRUCTURE ALONG VIRAY RIVER, PACKAGE B, TAYUG, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱22M | 89% | Medium risk47 | —-0.039 |
| 497 | 24AF0002INSTALLATION OF STREET LIGHT ALONG MANILA NORTH ROAD, K0212+(-294)-K0223+505, ROSARIO, LA UNION | Region I | La Union 2nd DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.087 |
| 498 | 24PA0126CONCRETING OF BRGY. LOMUBANG FMR, BRGY. LOMUBANG, SAN JUAN ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱5M | 97% | Medium risk47 | Flagged0.009 |
| 499 | 24DK0136ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MAUBAN-TIGNOAN RD K0169 + 830 - K0170 + 840 | Region IV-A | Quezon 1st DEO | On-Going | ₱28.9M | 100% | Medium risk47 | —-0.072 |
| 500 | 25AF0056BASIC INFRA. PROGRAM (BIP) - CONSTRUCTION OF AGOO BRIDGE, AGOO, LA UNION | Region I | La Union 2nd DEO | On-Going | ₱14.5M | 89% | Medium risk46 | —-0.022 |