Contractor dossier
537 projects on file, including joint ventures this contractor is part of.
Total projects
537
Total budget
₱52.4B
Average progress
88.0%
Completion rate
49.0%
Below 70%
Average risk score
61.4
High risk on average, out of 100
Flagged as unusual
82
15.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 359 | ₱35.4B | 60.2 | 59 | 88.5% |
| Region IV-A | 80 | ₱8.4B | 65.4 | 12 | 84.0% |
| Region I | 61 | ₱4.7B | 60.9 | 6 | 92.3% |
| Region IV-B | 30 | ₱3.4B | 63.4 | 2 | 94.5% |
| Region II | 7 | ₱563.1M | 74.3 | 3 | 44.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 338 | ₱32.8B | 57.7 | 21 | 87.8% |
| Flood Control and Drainage | 146 | ₱14.6B | 61.8 | 22 | 92.5% |
| OTHER | 21 | ₱2.4B | 82.6 | 19 | 86.2% |
| GAA 2025 OO-1 | 14 | ₱1.3B | 90.9 | 9 | 73.9% |
| GAA 2025 SSP | 7 | ₱637.4M | 94.9 | 5 | 81.7% |
| Bridges | 7 | ₱411.6M | 54.3 | 2 | 63.1% |
| GAA 2025 OO-2 | 4 | ₱341.1M | 92.2 | 4 | 60.7% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BH0283CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR STREETLIGHTS ALONG JCT. IPIL-QUIRINO BDRY. RD., BARANGAY IPIL TO BARANGAY VILLA VICTORIA, SECTION 2, ECHAGUE, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱93.6M | 61% | High risk96 | Flagged0.029 |
| 25DK0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR STREETLIGHTS ALONG LUCENA-TAYABAS-LUCBAN-SAMPALOC-MAUBAN PORT ROAD, K0144+000-K0152+000 | Region IV-A | Quezon 1st DEO | On-Going | ₱96.8M | 55% | High risk96 | Flagged0.015 |
| 25DM0103ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0312+541 - K0316+000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 74% | High risk96 | Flagged0.002 |
| 25DM0111ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO- SN ANDRES-SN NARCISO RD - K0388+487 - K0391+184, K0395+000 - K0396+000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 89% | High risk96 | —-0.004 |
| 25DM0141ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - ABUYON-BUENAVISTA RD - K0256+000 - K0257+000, K0264+971 - K0267+506 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 89% | High risk96 | —-0.004 |
| 25DM0110ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - GUMACA-PITOGO- MULANAY-SN NARCISO RD - K0275+215 - K0278+189, K0280+000 - K0280+292 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 45% | High risk96 | Flagged0.008 |
| 25DM0105ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0319+500 - K0321+005, K0322+(-995) - K0323+000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 69% | High risk96 | Flagged0.004 |
| 25ED0109INSTALLATION OF STREET LIGHTS ALONG CALAPAN SOUTH ROAD K0007+400 -K0021+000, CALAPAN - NAUJAN, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱95.1M | 100% | High risk95 | —-0.008 |
| 25PA0046BASIC INFRASTRUCTURE PROGRAM (BIP)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, REHABILITATION OF ROAD, LA PAZ ROAD, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱92.3M | 95% | High risk95 | Flagged0.026 |
| 25D00280PREVENTIVE MAINTENANCE - SECONDARY ROADSLUCBAN BYPASS RD - K0127+126 - K0127+470, K0127+486 - K0128+277, K0128+317 - K0128+740 | Region IV-A | Region IV-A | On-Going | ₱148.6M | 69% | High risk95 | Flagged0.011 |
| 25ED0108INSTALLATION OF STREET LIGHTS ALONG CALAPAN SOUTH ROAD K0047+200 - K0060+800, SOCORRO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱96.5M | 81% | High risk95 | Flagged0.021 |
| 25DK0052CONVERGENCE AND SPECIAL SUPPORT PROGRAM SPECIAL ROAD FUND MOTOR VEHICLE USERS CHARGE (MVUC) AS PER RA 11239 INSTALLATION OF SOLAR STREETLIGHTS ALONG JCT LUCBAN-LUISIANA RD K0129 + (-308) - K0133 + 590 | Region IV-A | Quezon 1st DEO | On-Going | ₱66.6M | 80% | High risk94 | Flagged0.004 |
| 25P00025CONSTRUCTION OF MISSING LINKS/ NEW ROADS - BAGUIO-LA TRINIDAD-ITOGON-SABLAN-TUBA AND TUBLAY, POBLACION JCT.-BATUANG-CARANTES JCT-BALATOC JCT. (SECTION 6 OF BLISTT OUTER RING CIRCUMFERENTIAL ROAD), BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱52.3M | 1% | High risk94 | Flagged0.020 |
| 25PA0114ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS, ABRA-ILOCOS NORTE RD-K0432+000-K0435+000 | Cordillera Administrative Region | Abra DEO | On-Going | ₱91.3M | 95% | High risk94 | Flagged0.010 |
| 25AE0039PREVENTIVE MAINTENANCE - TERTIARY ROADS - SN FERNANDO - BAGULIN RD - K0283+000 - K0284+550 | Region I | La Union 1st DEO | On-Going | ₱47.3M | 78% | High risk93 | Flagged0.004 |
| 25P00021CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CHICO RIVER, PAPALID-PANGPANG, SAMOKI, BONTOC, MOUNTAIN PROVINCE | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱95M | 20% | High risk93 | Flagged0.020 |
| 25PM0012ORGANIZATIONAL OUTCOME 1 - ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS - AGUINALDO-NATONIN ROAD (PACKAGE A), MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱34.3M | 51% | High risk93 | Flagged0.007 |
| 25ED0149REHABILITATION OF ROAD, JUNCTION POBLACION - BARANGAY LOYAL, VICTORIA,ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱96.5M | 100% | High risk93 | —-0.008 |
| 25PA0040OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, BARANGAY SAN ANTONIO, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱91.7M | 77% | High risk92 | Flagged0.011 |
| 25PM0025ORGANIZATIONAL OUTCOME 2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIFFU RIVER, PALITOD, STA. 92+225 - STA. 92+799 AND STA. 94+366 - STA. 94+512, PARACELIS, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱62.7M | 69% | High risk92 | Flagged0.002 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24PA0197CONSTRUCTION OF CARDONA FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CARDONA, DOLORES, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138.9M | 96% | High risk90 | Flagged0.071 |
| 24PA0185CONSTRUCTION OF NAGUILLAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱139M | 95% | High risk90 | Flagged0.071 |
| 24PA0196CONSTRUCTION OF BULBULALA FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY BULBULALA, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138.2M | 95% | High risk90 | Flagged0.071 |
| 24PA0199CONSTRUCTION OF KAWITAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, DANGLAS, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138.9M | 95% | High risk90 | Flagged0.071 |
| 24PA0200CONSTRUCTION OF SOOT FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.8M | 95% | High risk90 | Flagged0.071 |
| 24PA0220CONSTRUCTION OF BLISS FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.6M | 95% | High risk90 | Flagged0.070 |
| 24PE0089CONSTRUCTION OF ROAD, AMBACUAG-ORING-LA TRINIDAD ROAD, SABLAN, BENGUET, PHASE 2 | Cordillera Administrative Region | Benguet 1st DEO | On-Going | ₱96.5M | 60% | High risk90 | Flagged0.066 |
| 24PA0194CONSTRUCTION OF POBLACION FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY POBLACION, LAGAYAN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.6M | 0% | High risk74 | Flagged0.066 |
| 24PA0187CONSTRUCTION OF CATACDEGAN VIEJO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CATACDEGAN VIEJO, MANABO, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138.8M | 21% | High risk74 | Flagged0.063 |
| 24PA0192CONSTRUCTION OF PANG-OT FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY PANG-OT, LAGAYAN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.6M | 23% | High risk74 | Flagged0.061 |
| 24PA0202CONSTRUCTION OF LIPCAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY LIPCAN, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138M | 40% | High risk75 | Flagged0.059 |
| 24PA0201CONSTRUCTION OF AGTANGAO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY AGTANGAO, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.7M | 47% | High risk75 | Flagged0.057 |
| 24PA0221CONSTRUCTION OF SAGAP FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY SAGAP, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.5M | 75% | High risk73 | Flagged0.051 |
| 23AA0454CONCRETING OF BRGY. SAN ANTONIO FMR, BRGY. SAN ANTONIO, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱23.9M | 0% | High risk76 | Flagged0.049 |
| 24PA0186CONSTRUCTION OF CALAO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CALAO, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.6M | 76% | High risk75 | Flagged0.047 |
| 24PA0191CONSTRUCTION OF MALIBCONG FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, MALIBCONG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138.8M | 80% | High risk74 | Flagged0.046 |
| 24PA0219CONSTRUCTION OF CULIONG FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CULIONG, SAN JUAN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138.9M | 85% | High risk76 | Flagged0.046 |
| 24PA0204CONSTRUCTION OF DAOIDAO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY DAOIDAO, SAN JUAN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.6M | 91% | High risk76 | Flagged0.046 |
| 24PA0195CONSTRUCTION OF AGUET FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY AGUET, LAGANGILANG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.6M | 91% | High risk75 | Flagged0.046 |
| 24PA0198CONSTRUCTION OF LACUB FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LACUB, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱136.2M | 80% | High risk75 | Flagged0.045 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 25DI0126INSTALLATION OF SOLAR STREETLIGHTS AT BARANGAYS SINALHAN AND APLAYA, SANTA ROSA CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱142M | 2% | High risk66 | —-0.026 |
| 127 | 25DI0112INSTALLATION OF SOLAR STREETLIGHTS AT BARANGAYS SAN ANTONIO AND PLATERO, BINAN CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱142.1M | 13% | High risk66 | —-0.027 |
| 128 | 23DJ0183CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD ROLLER BARRIERS- QUEZON ECO-TOURISM RD- K0159+820-K0160+000, K0160+361-K0160+667, BRGY CASTAÑAS, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱93.6M | 97% | High risk66 | Flagged0.007 |
| 129 | 25DI0111INSTALLATION OF SOLAR STREETLIGHTS AT BARANGAYS DELA PAZ AND MALABAN, BINAN CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱142M | 0% | High risk66 | —-0.026 |
| 130 | 25DI0110INSTALLATION OF SOLAR STREETLIGHTS AT BARANGAYS STO. TOMAS AND LANGKIWA, BINAN CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱142M | 28% | High risk66 | —-0.033 |
| 131 | 24PA0027OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF SINALANG FLOOD CONTROL STRUCTURE, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱92.7M | 90% | High risk65 | —-0.009 |
| 132 | 22PA0343SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF PAGA FLOOD CONTROL STRUCTURE, DOLORES, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱95.5M | 100% | High risk65 | —-0.052 |
| 133 | 22PA0362SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF CARDONA FLOOD CONTROL STRUCTURE, BARANGAY CARDONA, DOLORES, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱95.6M | 100% | High risk65 | —-0.053 |
| 134 | 23DJ0185CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD ROLLER BARRIERS- QUEZON ECO-TOURISM RD- K0163+143-K0163+528, BRGY SALINAS, LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk65 | —-0.036 |
| 135 | 23DJ0186CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD ROLLER BARRIERS- QUEZON ECO-TOURISM RD-K0160+667-K0160+704, K0160+770-K0160+973, K0162+150-K0162+295, BRGY CASTAÑAS TO TAL | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk65 | —-0.036 |
| 136 | 23DJ0184CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD ROLLER BARRIERS- QUEZON ECO-TOURISM RD- K0162+572-K0162+714, K0162+900-K0163+143, BRGY TALAAN APLAYA, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk65 | —-0.036 |
| 137 | 23DJ0182CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD ROLLER BARRIERS- QUEZON ECO-TOURISM RD- K0163+528-K0163+805, K0165+380-K0165+488, BRGY SALINAS TO IBABANG TALIM, LUCENA CI | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk65 | —-0.037 |
| 138 | 24DK0041ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE TERTIARY ROADS MARIKINA-INFANTA ROAD, K0100+250-K0104+000, INFANTA, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱147M | 100% | High risk65 | —-0.081 |
| 139 | 25D00205PREVENTIVE MAINTENANCE - SECONDARY ROADS LUCBAN DIVERSION RD - K0131+000 - K0133+420 | Region IV-A | Region IV-A | On-Going | ₱205.9M | 0% | High risk65 | —-0.017 |
| 140 | 24PA0179SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF PALAO SECTION BYPASS ROAD, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.5M | 48% | High risk65 | —-0.013 |
| 141 | 24PA0178SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF LIPCAN BYPASS ROAD, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱139.1M | 55% | High risk65 | —-0.018 |
| 142 | 24PA0141REHABILITATION OF BANGUED ROAD, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱139M | 89% | High risk65 | —-0.022 |
| 143 | 24DK0045ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - MARIKINA-INFANTA RD K0096+490 - K0100+250 | Region IV-A | Quezon 1st DEO | Completed | ₱144.7M | 100% | High risk65 | —-0.081 |
| 144 | 24DK0049ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - LUCENA-TAYABAS-LUCBAN-SAMPALOC-MAUBAN PORT RD - K0141 + 530 - K0144 + 000...K0148 + 677 - K0149 + 000 | Region IV-A | Quezon 1st DEO | Completed | ₱144.7M | 100% | High risk65 | —-0.084 |
| 145 | 24PA0174SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BANGBANGAR SECTION BYPASS ROAD, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138.6M | 97% | High risk65 | —-0.025 |
| 146 | 24DK0054ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE -TERTIARY ROAD-MARIKINA-INFANTA ROAD, K0113+500-K0117+227, INFANTA, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱147M | 100% | High risk65 | —-0.080 |
| 147 | 24DK0051ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSETPRESERVATION PROGRAMPREVENTIVE MAINTENANCE-TERTIARY ROAD-MARIKINA-INFANTA ROAD K0109+425-K0113+500, INFANTA, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱147M | 100% | High risk65 | —-0.080 |
| 148 | 24DK0055ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE -TERTIARY ROADS-MARIKINA-INFANTA ROAD-K0121+350-K0125+100, INFANTA, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱147M | 100% | High risk65 | —-0.081 |
| 149 | 24PA0175SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF CABULOAN BYPASS ROAD, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱139M | 97% | High risk64 | —-0.025 |
| 150 | 23PA0132OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BULI FLOOD CONTROL, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱92.5M | 100% | High risk64 | —-0.009 |