Contractor dossier
4 projects on file, including joint ventures this contractor is part of.
Total projects
4
Total budget
₱441.1M
Average progress
100.0%
Completion rate
100.0%
Average risk score
48.5
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-B | 4 | ₱441.1M | 48.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 3 | ₱416.8M | 51.3 | 0 | 100.0% |
| Flood Control and Drainage | 1 | ₱24.3M | 40.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22E00156REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS-ODIONGAN EAST-WEST ROAD, STA. 8+840-STA. 8+940; STA. 9+158-STA. 9+392, ROMBLON | Region IV-B | Region IV-B | Completed | ₱226.8M | 100% | High risk61 | —-0.056 |
| 22E00155REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS-ODIONGAN EAST-WEST ROAD, STA. 8+601-STA. 8+840, ROMBLON | Region IV-B | Region IV-B | Completed | ₱188.2M | 100% | High risk60 | —-0.062 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 22E00156REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS-ODIONGAN EAST-WEST ROAD, STA. 8+840-STA. 8+940; STA. 9+158-STA. 9+392, ROMBLON | Region IV-B | Region IV-B | Completed | ₱226.8M | 100% | High risk61 | —-0.056 |
| 2 | 22E00155REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS-ODIONGAN EAST-WEST ROAD, STA. 8+601-STA. 8+840, ROMBLON | Region IV-B | Region IV-B | Completed | ₱188.2M | 100% | High risk60 | —-0.062 |
| 3 | 22EH0055CONSTRUCTION OF PANANGCALAN FLOOD CONTROL STRUCTURE (DOWNSTREAM), STA. 0+080.00 - STA. 0+160.00 (L/S), STA. 0+080.00 - STA. 0+164.00 (R/S), SAN FERNANDO, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱24.3M | 100% | Medium risk40 | —-0.072 |
| 4 | 17EH0015OFF - CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG BATIANO - POCTOY RD,CHAINAGE 0 - CHAINAGE 190 (AS PER RBIA)K0000 + 065.59 - K0000 + 172.59 (AS PER ACTUAL), TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱1.9M | 100% | Medium risk33 | —-0.053 |